Unincorporated Duchesne County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Duchesne County, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
734 North Center Street, P.O. Box 317, Duchesne, UT 84021-0317
Phone
(435) 738-1150
Office hours
Mon–Fri 8:30 AM – 5:00 PM (closed state and federal holidays); Planning & Zoning zoning-clearance line (435) 738-1135 or 1152

Inspection guide

See how inspections work in Unincorporated Duchesne County — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2021 International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — Utah Code § 15A-2-103(1)(b)/(c); unchanged by the July 1, 2026 revision — still the current edition
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition, including Utah amendment P2602.3 (individual water supply), governed through June 30, 2026 — confirm the amendment still applies against the 2024 base edition)
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026)
  • 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n). ADDED 2026-07-16: this code is not listed on Duchesne County's own permit materials, but it is adopted statewide by statute, so it applies here regardless of the county page's omission.
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 revision
  • Utah State Amendment to IBC Section 1807 (Empirical Concrete Foundation Design, Table 1807.1.6.4) — Duchesne County Permit Packet, dated July 1, 2023
  • Utah Wildland Urban Interface Code — adopted under Utah Code § 15A-2-103; a Pre-site/WUI evaluation is a required inspection for new construction in Duchesne County
  • NOTE (verified 2026-07-16 against the live Utah Code § 15A-2-103 text, version headed 'Effective 7/1/2026 / Superseded 1/1/2027'): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, and IEBC listed above took effect July 1, 2026, replacing the 2021 editions; IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. This file previously forecast this change but still led with the 2021 editions as current — corrected on this date.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
10units

10 buildings · $3.2M valuation

Trailing 12 months
111units

12 of 12 months reported · #49 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
40units

40 buildings · $13M valuation

Full year 2025
127units

124 buildings · $39.1M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder plus the Towns of Altamont and Tabiona, which fully contract their building permit review and issuance to the Duchesne County Department of Building Safety (confirmed on the county's own Permit Packet, July 2023: 'Town & City Offices – Duchesne County Reviews & Issues Building Permits for: Town of Altamont, Town of Tabiona'). Duchesne City, Roosevelt, and Myton each run their own independent city building departments/inspectors and are NOT covered by this file.

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • The Duchesne County Department of Building Safety issues and inspects building permits for unincorporated county land AND the Towns of Altamont and Tabiona, which fully contract building permit services to the county rather than running their own departments. Duchesne City, Roosevelt, and Myton each run independent city building departments — confirm which office applies before starting an application.
  • Building permit applications can be started online via the county's CivicReview portal (app.civicreview.com), or submitted in person/by mail to 734 North Center St., Duchesne, UT.
  • Inspection scheduling requires 24 hours notice for afternoon inspections and 48 hours notice for morning inspections due to the size of the county's coverage area — call (435) 738-1150 and leave a message; a callback is required to confirm the appointment.
  • A Zoning Clearance from Planning & Zoning ((435) 738-1135 or 1152) is required before a building permit can be issued, and a Road Approach Permit from the County Road Department ((435) 738-2468) or UDOT is required if access is from a county- or state-maintained road.
  • Wells for culinary water supply require an inorganic water test through the Tri-County Health Department that can take 4-6 weeks — plan ahead, since a Certificate of Occupancy requires an approved water source.
  • Building permit fees are valuation-based using the county-adopted ICC Building Safety Journal cost-per-square-foot table, not a flat fee schedule; applicants who disagree with the resulting valuation may submit a contractor's bid plus a county assessor appraisal instead.
  • Duchesne County has not published its own building-permit plan-review turnaround time; the statutory ceiling under Utah Code § 17-36-55(3)(a) is 14 business days for one- and two-family dwellings and townhomes.
  • Building or placing a structure without a required permit carries a minimum penalty equal to the permit fee that would have applied, per Duchesne County Code § 7-1E-4 / Resolution 15-18, Exhibit B — even if a permit could not have been issued for the project.

Comparable nearby cities

Roosevelt
Both in Duchesne County7 shared permit types
Compare fees →
Unincorporated Garfield County
8 shared permit typesBoth on the 2024 International Building Code (IBC), including Appendices C and J
Compare fees →
Unincorporated Cache County
7 shared permit typesBoth on the 2024 International Building Code (IBC), including Appendices C and J
Compare fees →