Change of Use Building Permit in Unincorporated Duchesne County, Utah
Required when a building's proposed occupancy or use classification differs from its prior use in unincorporated Duchesne County. Per the county's own Business License Application guidance: 'If the building you plan on using for the business has been used for any other purpose than what you are proposing to use it for, you may need to change the Occupancy use classification of the building or reclassify it in a different class of the same Occupancy group... To do this, you will need to obtain a change of use building permit from the Duchesne County Department of Building Safety.' Unlike the sign and fire-sprinkler/alarm gaps documented elsewhere in this file, this is a genuinely distinct, named permit type in the county's own materials, though it shares the same application and joint Building Department / Fire Marshal's Office review process as other permit types rather than having its own dedicated form.
Verified 2026-07-22 · Source
When you need this permit
- A building's proposed use or occupancy classification differs from its previously approved use, or is reclassified within a different class of the same Occupancy group, in unincorporated Duchesne County
- Floor plan and site plan (building and parking-area locations) submitted to the Department of Building Safety for joint plan review by the Building Department and the Fire Marshal's Office / Fire & Emergency Management Department
- Any building alterations required to bring the space into compliance with the code requirements for the new use (e.g., door-size changes, ADA ramp, restroom remodel, fire alarm installation) completed under the issued change-of-use permit before occupancy
- A Certificate of Occupancy issued by the county before the space may be occupied for the new use, consistent with the Certificate of Occupancy requirement documented for the Residential and Commercial Building Permits in this file
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Life-Safety / Alteration Rough-In Inspection
Confirms any required alteration work (e.g., fire alarm wiring, door/egress modifications, ADA ramp framing) prior to concealment or finish, scoped to what the joint plan review determined the new use requires.
- 2
Final Inspection / Certificate of Occupancy
Confirms the space complies with the code requirements determined for the new occupancy classification; a Certificate of Occupancy is required before the space may be occupied or used for the new use.
See the full Unincorporated Duchesne County inspection guide — scheduling & re-inspection fees →
Tips
- The permit fee for a change of use scales enormously with scope — the county's own worked example is a $55.55 minimum fee for something as simple as adding a fire alarm to a like-for-like use, versus a full valuation-based fee for major alterations like ADA ramps, restroom remodels, or door-size changes.
- Start with the Department of Building Safety, (435) 738-1150, with a floor plan and site plan in hand — the joint review with the Fire Marshal's Office / Fire & Emergency Management Department, (435) 738-1226, determines which code requirements apply to your specific new use before you know whether you're looking at the minimum fee or a valuation-based one.
- A change of use is often triggered alongside a new Business License Application — the county's Business License Zoning Clearance Form specifically asks whether the activity is 'a new use of this location' and what the previous use was, and routes the application to Planning & Zoning, the Building Department, and the Fire Department for review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Duchesne County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Duchesne County
Change of Use Building Permit in other cities
Compare change of use building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Duchesne County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Duchesne County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →