Residential Building Permit in Unincorporated Duchesne County, Utah
Required for new single-family dwelling construction, additions, and structural alterations in unincorporated Duchesne County. The Duchesne County Department of Building Safety also reviews and issues building permits for the Town of Altamont and the Town of Tabiona under a full contract arrangement — those towns do not run their own building departments. Duchesne City, Roosevelt, and Myton run independent city building departments and are excluded.
Verified 2026-07-08 · Source
When you need this permit
- New single-family dwelling, addition, or structural alteration on any parcel — vacant/bare land always requires a permit regardless of size or use unless a qualifying agricultural exemption is filed
- Legal description of property and proof of ownership (tax notice, recorded deed, or notarized purchase contract) with proof of legal deeded access from a public right-of-way
- Site evaluated for on-site wastewater (septic) system approval before a building permit is issued, per Tri-County Health Department review
- Road Approach Permit from the Duchesne County Road Department ((435) 738-2468) or UDOT ((801) 227-8000) approved prior to building permit issuance if access is from a county- or state-maintained road
- Zoning verification and, if the site is a new parcel split, Minor Subdivision Approval from Planning & Zoning ((435) 738-1135 or 1152)
- Complete construction documents per Utah Code § 17-36-55(1)(e) / § 17-36-8(c): elevations (new construction), floor plans, foundation/structural/framing detail, electrical/mechanical/plumbing design, energy code compliance documentation, structural calculations (except trusses), and a statement of code compliance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 6 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Site / Wildland Urban Interface Evaluation
Identifies site conditions requiring alteration to conform to the adopted Utah Wildland Urban Interface Code (road/driveway access for emergency vehicles, defensible space, firefighting water supply) and any conditions needing engineered design (poor soils, high groundwater, steep slopes, retaining walls)
- 2
Footings
Confirms reinforcement placement and footing form size; also confirms building location on the parcel
- 3
Foundation
Confirms reinforcement placement, anchoring, basement window/door or crawl space access, under-floor vent sizing, and form shoring. Includes bond beam inspection for masonry foundations.
- 4
Foundation Waterproofing
Required for below-grade livable space and masonry foundation walls
- 5
Underground Utility
Building sewer line to septic/city sewer, water line from home to water source, and any underground gas or electrical lines on the consumer side of the service disconnect
- 6
Under-Floor Slab
Building drain line installation and pressure test, electrical, heat ducts and insulation, reinforcement, and moisture barrier
- 7
Floor Framing
Prior to sheathing — confirms joist size for span, lumber grade, and sill-plate connections
- 8
Roof and Wall Sheathing
Prior to finish coverings — confirms nailing, joint offsets, panel usage, and moisture barrier need
- 9
Weather-Resistive Barrier and Flashing
Utah Amendment R109.1.5 — inspects the weather-resistive barrier (IRC R703.1) and flashing (IRC R703.8) before it is covered
- 10
Rough Electrical / Plumbing / Mechanical / Framing
Wire and box installation, DWV/gas/water piping pressure tests, duct and vent installation, and rough framing — these may be conducted together prior to insulation or any other coverage
- 11
Insulation and Moisture Barrier
Confirms insulation R-values and window U-values for Energy Code compliance
- 12
Drywall
Confirms fire barriers, tile backers, and brace wall installation prior to plastering
- 13
Final Electrical / Plumbing / Mechanical / Exterior Grading / Final
Final inspections may be conducted together. A Certificate of Occupancy is required before any building or structure may be occupied or used.
See the full Unincorporated Duchesne County inspection guide — scheduling & re-inspection fees →
Tips
- Inspection notice must be given at least 24 hours in advance for afternoon inspections and 48 hours in advance for morning inspections, due to the size of the county's coverage area — call Glenna at (435) 738-1150 to schedule. Voicemail alone does not count as notice; the office must return your call to confirm.
- Permits expire if work has not commenced within 180 days of issuance, or if work is suspended/abandoned for 180 days. A single 180-day extension may be granted in writing for good cause.
- The Towns of Altamont and Tabiona do not run their own building departments — Duchesne County issues and inspects their building permits directly, per the county's own Permit Packet contact list.
- A structure used solely for agriculture (not for human occupancy) is exempt from the building permit requirement under Utah Code § 15A-1-204(11), but plumbing/electrical/mechanical permits may still be required, and the exemption form must be notarized and recorded with the County Recorder.
- Water wells for a new culinary water supply require an inorganic water test that can take 4-6 weeks for results — start this early, since a Certificate of Occupancy cannot be issued without an approved water source.
- If you disagree with the county's ICC-valuation-table-based permit fee, you may submit a contractor's bid plus a county assessor appraisal as an alternative valuation basis.
- Rooftop and ground-mounted solar PV installations are not itemized separately anywhere in the county's Permit Packet or Land Use Fee Schedule (re-checked 2026-07-19) — a solar project is filed through this same Building Permit Application, with the structural mounting and electrical interconnection scope covered by the same valuation-based Building Permit Fee, Plan Review Fee, and 1% State Surcharge documented above. Duchesne County publishes no dedicated solar checklist, application, or fee line item; confirm the exact submittal package with the Department of Building Safety, (435) 738-1150, before applying.
- EV charger / EVSE installation is not itemized anywhere in the county's Permit Packet (dated July 1, 2023) or on the Department of Building Safety's own pages (re-checked 2026-07-20) — a full-text review found no 'EV,' 'electric vehicle,' or 'charging station' entry. Consistent with the county's treatment of solar (above), an EV charging circuit would be filed through this same Building Permit Application, with the electrical work covered by the same valuation-based Building Permit Fee, Plan Review Fee, and 1% State Surcharge documented above.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Duchesne County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Duchesne County
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Duchesne County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Duchesne County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →