EV Charger / EVSE Permit in Unincorporated Duchesne County, Utah
Duchesne County publishes no distinct EV charger / EVSE permit or fee, and no minor-work flat fee at all. The Department of Building Safety's Permit Packet (July 2023) prices every building permit purely by estimated construction cost valuation, with no published minimum fee or standalone electrical-only category — an EV charger installation would need to go through the same valuation-based Building Permit process as any other electrical work, with no smaller flat-fee alternative documented.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Duchesne County
- New dedicated 240V circuit and/or panel capacity to serve the charger, shown on the electrical plan
- Licensed electrical contractor for the installation
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Rough and final inspection of the new circuit/panel work serving the charger, part of the standard building-permit inspection sequence.
See the full Unincorporated Duchesne County inspection guide — scheduling & re-inspection fees →
Tips
- Duchesne County has no flat-fee or minor-work permit category at all — every building permit, including a standalone EV charger circuit, would be priced using the county's per-square-foot construction valuation table (published each August in the ICC Building Safety Journal), plus a 35%-65% plan review fee and 1% state surcharge, unless the Department of Building Safety confirms a smaller path exists.
- Confirm directly with the Duchesne County Department of Building Safety, (435) 738-1135, whether a standalone EV charger circuit can be permitted at a reduced/minimum fee rather than the full valuation-based calculation, since no such minimum is published.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Duchesne County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Duchesne County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Duchesne County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Duchesne County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →