EV Charger / EVSE Permit in Unincorporated Duchesne County, Utah

Duchesne County publishes no distinct EV charger / EVSE permit or fee, and no minor-work flat fee at all. The Department of Building Safety's Permit Packet (July 2023) prices every building permit purely by estimated construction cost valuation, with no published minimum fee or standalone electrical-only category — an EV charger installation would need to go through the same valuation-based Building Permit process as any other electrical work, with no smaller flat-fee alternative documented.

Reviewed 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Duchesne County
  • New dedicated 240V circuit and/or panel capacity to serve the charger, shown on the electrical plan
  • Licensed electrical contractor for the installation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Duchesne County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Rough and final inspection of the new circuit/panel work serving the charger, part of the standard building-permit inspection sequence.

See the full Unincorporated Duchesne County inspection guide — scheduling & re-inspection fees →

Tips

  • Duchesne County has no flat-fee or minor-work permit category at all — every building permit, including a standalone EV charger circuit, would be priced using the county's per-square-foot construction valuation table (published each August in the ICC Building Safety Journal), plus a 35%-65% plan review fee and 1% state surcharge, unless the Department of Building Safety confirms a smaller path exists.
  • Confirm directly with the Duchesne County Department of Building Safety, (435) 738-1135, whether a standalone EV charger circuit can be permitted at a reduced/minimum fee rather than the full valuation-based calculation, since no such minimum is published.

Frequently asked questions

Unincorporated Duchesne County requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Duchesne County; New dedicated 240V circuit and/or panel capacity to serve the charger, shown on the electrical plan; Licensed electrical contractor for the installation. If your project isn't listed, confirm with Duchesne County Department of Building Safety at (435) 738-1150 before starting work.

Unincorporated Duchesne County does not publish a plan-review timeline for this permit. Contact Duchesne County Department of Building Safety at (435) 738-1150 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Unincorporated Duchesne County requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Duchesne County Department of Building Safety ((435) 738-1150).

Apply through Duchesne County Department of Building Safety at 734 North Center Street, P.O. Box 317, Duchesne, UT 84021-0317. Phone: (435) 738-1150, email: Building@duchesne.utah.gov. Office hours: Mon–Fri 8:30 AM – 5:00 PM (closed state and federal holidays); Planning & Zoning zoning-clearance line (435) 738-1135 or 1152. Official information: https://duchesne.utah.gov/gov/dept/building-inspector/.

Unincorporated Duchesne County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2021 International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — Utah Code § 15A-2-103(1)(b)/(c); unchanged by the July 1, 2026 revision — still the current edition; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition, including Utah amendment P2602.3 (individual water supply), governed through June 30, 2026 — confirm the amendment still applies against the 2024 base edition); 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n). ADDED 2026-07-16: this code is not listed on Duchesne County's own permit materials, but it is adopted statewide by statute, so it applies here regardless of the county page's omission.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 revision; Utah State Amendment to IBC Section 1807 (Empirical Concrete Foundation Design, Table 1807.1.6.4) — Duchesne County Permit Packet, dated July 1, 2023; Utah Wildland Urban Interface Code — adopted under Utah Code § 15A-2-103; a Pre-site/WUI evaluation is a required inspection for new construction in Duchesne County; NOTE (verified 2026-07-16 against the live Utah Code § 15A-2-103 text, version headed 'Effective 7/1/2026 / Superseded 1/1/2027'): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, and IEBC listed above took effect July 1, 2026, replacing the 2021 editions; IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. This file previously forecast this change but still led with the 2021 editions as current — corrected on this date.. Local amendments apply — see the Unincorporated Duchesne County overview page for the full list.

No. Duchesne County publishes no distinct EV/EVSE permit, and its Permit Packet describes only a purely valuation-based Building Permit Fee with no minimum fee or standalone electrical-only category — a homeowner installing an EV charger would need to confirm the applicable fee path directly with the Department of Building Safety.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Duchesne County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare ev charger / evse permit fees across Utah

Look up this fee in a different city →

Embed this data card →

Related guides

Now live

Build your Unincorporated Duchesne County project checklist

Describe your project once and get every permit, document, and fee it triggers in Unincorporated Duchesne County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →