Roosevelt building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Roosevelt, Utah.

Last verified 2026-07-19 · Source · Embed this page’s badge · Version history

Building department

Address
255 South State Street, Roosevelt, UT 84066
Phone
(435) 722-5001 (Building Department); Fax (435) 722-5000
Office hours
Monday-Thursday, 7:30 a.m. to 5:30 p.m. (closed Fridays), per Roosevelt City's Building Department page.

Inspection guide

See how inspections work in Roosevelt — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • Roosevelt City does not separately publish IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC edition years on its Building Department page or on its own permit application forms. Both the Commercial Building Permit Application and the Residential/Duplex Building Permit Application state only: 'Decisions relative to this application are subject to review by the chief executive officer of the municipal or county entity issuing this building permit and appeal under the International Building Code as adopted by Legislature' — i.e., the city defers to whatever edition the Utah Legislature has adopted statewide, without itemizing it locally.
  • 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current statewide edition as of 7/1/2026 (2021 edition governed through 6/30/2026).
  • 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 statewide revision.
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current statewide edition as of 7/1/2026.
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current statewide edition as of 7/1/2026.
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current statewide edition as of 7/1/2026.
  • 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — Utah Code § 15A-2-103(1)(h); current as of 7/1/2026.
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current statewide edition as of 7/1/2026.
  • 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); statewide by statute, not separately itemized by Roosevelt.
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the 7/1/2026 revision.
  • Roosevelt City Standard Specifications and Drawings (originally published March 2014, updated September 2015) — governs public infrastructure construction (streets, water, sewer, storm drain), referenced by the Street Right-of-Way Encroachment Permit; this is a public-works construction standard, not a building-code edition adoption, and does not itemize IBC/IRC edition years.

Permit types & fees

Tips & gotchas

  • Roosevelt City runs its OWN independent Building Department (Building Inspector Dean Johnson, 255 South State Street) — it is a genuinely separate authority from the Duchesne County Department of Building Safety, which only handles unincorporated county areas plus the Towns of Altamont and Tabiona under a contract arrangement. Property inside Roosevelt City limits must use the City's Building Department, not the County.
  • Roosevelt's own permit application forms (Commercial and Residential/Duplex) cite only 'the International Building Code as adopted by Legislature' without naming a specific edition year — the city does not separately publish IBC/IRC/etc. edition years the way some other Utah cities do. This file cites Utah Code § 15A-2-103 for the current statewide-adopted editions as the grounded fallback.
  • A single citywide valuation-based Building Permit Fee table (Resolution 2024-322) applies to BOTH residential/duplex AND commercial building permits — it is not split into separate residential and commercial tables the way some Utah cities structure their fee schedules.
  • Water and sewer connection fees are billed at different rates depending on whether the property is inside Roosevelt City limits (lower rate) or outside city limits but served by Roosevelt sewer/water ('County' rate, per the fee schedule's own terminology) — always confirm which tier applies.
  • The published Sewer Fee Schedule (Resolution 2024-322) does NOT separately itemize a 'Duplex' connection tier, even though the Residential/Duplex Building Permit Application lists 'Sewer Connection-Duplex' as its own fee line — only 'Single Family Dwelling' and 'Commercial, Each Building in Multiple Dwellings or P.U.D.' tiers are published. Flagged rather than assumed.
  • Demolition permits are free (no fee), but require FOUR separate utility clearances (Questar, Moon Lake Electric, Roosevelt City Water/Sewer, Strata Networks) plus an asbestos inspection if applicable, before the permit is issued — budget lead time for these clearances even though no fee applies.
  • No jurisdiction-published plan-review or permit-issuance turnaround time (in business or calendar days) was found for any Roosevelt City permit type as of 2026-07-19, except the Residential/Duplex Building Permit, which carries a Utah Code § 10-20-909 statutory ceiling of 17 business days (3-day completeness screening + 14-business-day plan review) applied as a grounded fallback since the statute is expressly scoped to one-/two-family dwelling and townhome construction projects. Every other permitType in this file carries reviewTimelineDays: null with an explanatory note.
  • The Commercial Building Permit application bundles both general new commercial construction AND 3-plex/4-plex multi-family dwelling options under a single permit type — Utah Code § 10-20-909's residential-structure statutory timeline could arguably apply to the multi-family option but not to general commercial construction, so this file leaves the field null for the whole permit type rather than asserting a figure that wouldn't uniformly apply.