Residential/Duplex Building Permit in Roosevelt, Utah
Required for new single-family dwelling and duplex construction, additions, remodels, basement finishes, detached garages, carports/patio covers, and sheds within Roosevelt City limits. Building valuation determines the base permit fee per the city's citywide valuation-based fee table (Resolution 2024-322); water impact, sewer connection, secondary water, electrical, and gas-line fees are billed as separate line items on the same application.
Verified 2026-07-20 · Source
When you need this permit
- New single-family dwelling or duplex construction, addition, remodel, basement finish, detached garage, carport/patio cover, or shed within Roosevelt City limits
- Duchesne County Assessor's Parcel Number for the job site
- Utah-licensed general contractor's name and Utah State License #, or owner-builder designation Owner-builderContractor
- Water meter size (3/4" or 1") and whether the property has an existing water meter and sewer service
- 24-hour advance notice required to schedule inspections, per the application form
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
The Residential/Duplex Building Permit Application lists 'Sewer Connection-Duplex' as its own fee line, but Resolution 2024-322's Sewer Fee Schedule only publishes 'Single Family Dwelling' ($4,000… Show full citationHide
The Residential/Duplex Building Permit Application lists 'Sewer Connection-Duplex' as its own fee line, but Resolution 2024-322's Sewer Fee Schedule only publishes 'Single Family Dwelling' ($4,000 City / $5,000 County) and 'Commercial, Each Building in Multiple Dwellings or P.U.D.' ($5,500 City / $6,000 County) tiers — which of these applies to a duplex is not stated; confirm with the Building Department before budgeting.Review timeline
Inspection process
- 1
Footing/Foundation
Per the statewide-adopted construction code; 24-hour advance notice required.
- 2
Framing
Structural framing inspection prior to insulation/drywall.
- 3
Final
Final inspection prior to occupancy.
See the full Roosevelt inspection guide — scheduling & re-inspection fees →
Tips
- Water and sewer connection fees differ substantially between City-limits and County (outside-city, Roosevelt-sewer) properties — confirm which rate tier applies before budgeting.
- The published Sewer Fee Schedule does not separately itemize a 'Duplex' connection tier despite the application form listing one — call the Building Department at (435) 722-5001 to confirm whether a duplex is billed at the Single Family or Commercial/Multiple Dwelling rate.
- Roosevelt City does not publish a distinct solar/photovoltaic permit, checklist, or fee line — its Building Department page and Consolidated Fee Schedule (Resolution 2024-322) list only the general valuation-based Building Permit Fee table plus a flat $25.00 Electrical Inspection fee, with no solar-specific mention found after a direct check (2026-07-19). A rooftop or ground-mounted solar PV installation is therefore priced and processed under this general Residential/Duplex Building Permit (valuation-based fee) plus the standard Electrical Inspection.
- The same gap applies to EV chargers: Roosevelt's Consolidated Fee Schedule (Resolution 2024-322) has no EV-charger-specific or electric-vehicle line item — a home charger installation would be billed the same way as other electrical work, under the Residential/Duplex Building Permit plus the flat $25.00 Electrical Inspection fee, not a dedicated EV rate.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roosevelt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Roosevelt's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Roosevelt yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Roosevelt lands. Privacy.
Other permits in Roosevelt
Residential/Duplex Building Permit in other cities
Compare residential/duplex building permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Roosevelt project checklist
Describe your project once and get every permit, document, and fee it triggers in Roosevelt — in one checklist. Free, for any city and any number of projects.
Get started →