Commercial Tenant Improvement / Tenant Finish Permit in Roosevelt, Utah

Roosevelt does not issue a separate tenant-improvement permit; 'Interior Finish' is one of the explicit checkbox options under Permit Information on the City's own Commercial Building Permit Application, alongside New Commercial Building, Remodel Existing Building, Addition on Building, and Repair/Mechanical/Gas line/Electrical items. Interior-finish/tenant-improvement projects use the identical application form and the same citywide valuation-based Building Permit Fee table (Resolution 2024-322) used for new commercial construction.

Verified 2026-07-19 · Source

When you need this permit

  • 'Interior Finish' checked under Permit Information on the Commercial Building Permit Application
  • Architect and/or engineer seal required if the tenant space is within a building with three or more dwelling units, per the application's general commercial requirement
  • Utah Licensed General Contractor's name and Utah State License #, or applicable trade contractor licenses (electrical, mechanical, plumbing) for the scope of work Contractor
  • Duchesne County Assessor's Parcel Number for the job site
  • 24-hour advance notice required to schedule inspections, per the application form

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based)Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Building Department Fee Schedule -- the 'Building Permit' line item on the Commercial Building Permit Application (which includes the 'Interior Finish' checkbox) is not itemized separately for tenant-improvement/interior-finish work versus new commercial construction.
Same citywide valuation table as the Residential/Duplex and general Commercial Building Permit: $23.50 for $1-$500, scaling to $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above that
Water Impact Fee / Sewer Connection (if a new utility connection is required)These line items appear on the same Commercial Building Permit Application used for 'Interior Finish' work, but the form does not state whether an interior tenant-finish project in an already-connected space is exempt. Confirm applicability with the Building Department (435-722-5001) before budgeting.
$3,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures
Electrical Repair / Gas Line Change OutThe Commercial Building Permit Application's 'Electrical Repair' and 'Gas line Change out' fee lines are the closest published figures for interior-finish trade work; the Consolidated Fee Schedule's general 'Electrical Inspection' ($25.00) entry (Resolution 2024-322, Other Inspections and Fees) may apply. Confirm with the Building Department before budgeting.
Not separately itemized as tenant-improvement-specific figures in the published fee schedule

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Roosevelt?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In Inspection

    Electrical, plumbing, and mechanical rough-in for interior tenant-finish work; 24-hour advance notice required.

  2. 2

    Final

    Final inspection prior to occupancy.

See the full Roosevelt inspection guide — scheduling & re-inspection fees →

Tips

  • Roosevelt's Commercial Building Permit Application bundles 'Interior Finish' (tenant improvement) as just one of several checkboxes -- alongside New Commercial Building, Remodel Existing Building, and Addition on Building -- all billed from the same citywide valuation-based Building Permit Fee table (Resolution 2024-322).
  • Confirm with the Building Department (435-722-5001) whether an interior tenant-finish project in an already-connected space is billed the Water Impact Fee / Sewer Connection line items on the application, since those typically apply to new utility connections rather than interior remodels.

Frequently asked questions

Roosevelt requires a commercial tenant improvement / tenant finish permit for: 'Interior Finish' checked under Permit Information on the Commercial Building Permit Application; Architect and/or engineer seal required if the tenant space is within a building with three or more dwelling units, per the application's general commercial requirement; Utah Licensed General Contractor's name and Utah State License #, or applicable trade contractor licenses (electrical, mechanical, plumbing) for the scope of work; Duchesne County Assessor's Parcel Number for the job site; 24-hour advance notice required to schedule inspections, per the application form. If your project isn't listed, confirm with Roosevelt City Building Department at (435) 722-5001 (Building Department); Fax (435) 722-5000 before starting work.

In Roosevelt, the published Building Permit Fee (valuation-based) is: Same citywide valuation table as the Residential/Duplex and general Commercial Building Permit: $23.50 for $1-$500, scaling to $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above that. Additional published fees: Water Impact Fee / Sewer Connection (if a new utility connection is required) — $3,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures; Electrical Repair / Gas Line Change Out — Not separately itemized as tenant-improvement-specific figures in the published fee schedule. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Roosevelt does not publish a plan-review timeline for this permit. Contact Roosevelt City Building Department at (435) 722-5001 (Building Department); Fax (435) 722-5000 for current turnaround.

You'll need: Commercial Building Permit Application. See the required-documents checklist on this page for details on each.

Roosevelt requires 2 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Rough-In Inspection, Final. Schedule each through Roosevelt City Building Department ((435) 722-5001 (Building Department); Fax (435) 722-5000).

Apply through Roosevelt City Building Department at 255 South State Street, Roosevelt, UT 84066. Phone: (435) 722-5001 (Building Department); Fax (435) 722-5000, email: djohnson@rooseveltcity.com (Dean Johnson, Building Inspector); deschler@rooseveltcity.gov (Drew Eschler, Planning and Zoning Division Manager, (435) 725-7206). Office hours: Monday-Thursday, 7:30 a.m. to 5:30 p.m. (closed Fridays), per Roosevelt City's Building Department page.. Official information: https://www.rooseveltcity.gov/151/Building-Department.

Roosevelt, Utah has adopted: Roosevelt City does not separately publish IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC edition years on its Building Department page or on its own permit application forms. Both the Commercial Building Permit Application and the Residential/Duplex Building Permit Application state only: 'Decisions relative to this application are subject to review by the chief executive officer of the municipal or county entity issuing this building permit and appeal under the International Building Code as adopted by Legislature' — i.e., the city defers to whatever edition the Utah Legislature has adopted statewide, without itemizing it locally.; 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current statewide edition as of 7/1/2026 (2021 edition governed through 6/30/2026).; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 statewide revision.; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current statewide edition as of 7/1/2026.; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current statewide edition as of 7/1/2026.; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current statewide edition as of 7/1/2026.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — Utah Code § 15A-2-103(1)(h); current as of 7/1/2026.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current statewide edition as of 7/1/2026.; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); statewide by statute, not separately itemized by Roosevelt.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the 7/1/2026 revision.; Roosevelt City Standard Specifications and Drawings (originally published March 2014, updated September 2015) — governs public infrastructure construction (streets, water, sewer, storm drain), referenced by the Street Right-of-Way Encroachment Permit; this is a public-works construction standard, not a building-code edition adoption, and does not itemize IBC/IRC edition years.. Local amendments apply — see the Roosevelt overview page for the full list.

No. Roosevelt's Commercial Building Permit Application lists 'Interior Finish' as one of several checkboxes under Permit Information (alongside New Commercial Building, Remodel Existing Building, and Addition on Building), and all are billed from the same citywide valuation-based Building Permit Fee table under Resolution 2024-322.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roosevelt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Roosevelt.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.