Commercial Building Permit in Roosevelt, Utah

Required for new commercial building construction, 3-plex/4-plex multi-family dwellings, additions, remodels, and repairs to existing commercial buildings within Roosevelt City limits. Uses the same citywide valuation-based fee table as the Residential/Duplex permit; buildings with three or more dwelling units or any commercial building must have an architect and/or engineer seal.

Verified 2026-07-19 · Source

When you need this permit

  • New commercial building, 3-plex or 4-plex multi-family dwelling, addition, remodel, or repair within Roosevelt City limits
  • Architect and/or engineer seal required for all commercial buildings or buildings with three (3) or more dwelling units
  • Utah Licensed General Contractor's name and Utah State License # Contractor
  • Water meter size (3/4", 1", 1.5", or 2") and existing water meter/sewer service status
  • Duchesne County Assessor's Parcel Number for the job site
  • 24-hour advance notice required to schedule inspections

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based)Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Building Department Fee Schedule — this table applies to 'TOTAL VALUATION' generally and is not itemized separately by residential vs. commercial use.
Same citywide valuation table as the Residential/Duplex Building Permit: $23.50 for $1-$500, scaling to $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above that
Sewer Connection — Commercial (Each Building in Multiple Dwellings or P.U.D.)Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Sewer Fee Schedule.
$5,500.00 (City); $6,000.00 (County, for properties outside city limits on Roosevelt sewer)
Water Impact Fee (new connection, 3/4"-6" meter)Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Water Fee Schedule, City New Installation Fees — for a 3/4"-6" meter, the City rate is $3,000.00 (with a $3,000.00 hookup fee); the schedule's separate County rate ($5,000.00, $3,500.00 hookup) does not apply within Roosevelt City limits and was corrected here after an earlier draft misattributed it as the City figure. The application form's 'Water Impact Fee' line item is not separately itemized for commercial vs. residential use in the published schedule.
$3,000.00 (includes $3,000.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line
Electrical Repair / Gas Line Change OutThe Commercial Building Permit Application lists 'Electrical Repair' and 'Gas line Change out' as fee lines; the closest published figures are the general 'Electrical Inspection' ($25.00) and 'Gas Line Inspection' entries in Resolution 2024-322's Other Inspections and Fees section, but the schedule does not confirm these are the same fee applied to commercial repair/change-out work. Confirm with the Building Department before budgeting.
Not separately itemized as commercial-specific figures in the published fee schedule

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Roosevelt?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing/Foundation

    Per the statewide-adopted construction code; 24-hour advance notice required.

  2. 2

    Framing

    Structural framing inspection, subject to engineer/architect seal review for qualifying buildings.

  3. 3

    Final

    Final inspection prior to occupancy.

See the full Roosevelt inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial buildings and any building with three or more dwelling units require an architect and/or engineer seal — confirm this requirement applies before submitting plans for a 3-plex or 4-plex.
  • The Commercial Building Permit Application form has no fee amounts pre-printed; verify current dollar figures directly against Resolution 2024-322 or by calling (435) 722-5001, since several line items (Electrical Repair, Gas line Change out) are not clearly itemized as commercial-specific figures in the published fee schedule.
  • Roosevelt City has no separate 'Change of Use' or 'Certificate of Occupancy' permit type or fee line — checked directly against Resolution 2024-322 (the Consolidated Fee Schedule, covering Building, Subdivision/Planning/Zoning, and Business License fee tables) and the Building Department page, both live-fetched 2026-07-20, with zero matches for either term. A change in a tenant's use or occupancy classification is expected to be handled as part of the standard valuation-based Commercial Building Permit review above; a new business at an existing address separately requires a Business License application (fee amounts for this application are given inconsistently across the city's own published sources — the Business Licensing webpage and Resolution 2024-322's own fee table do not agree with each other — so no specific dollar figure is repeated here) that includes a City Building Department Fire and Safety Inspection of the premises, per rooseveltcity.gov/152/Business-Licensing-Home-Occupations.

Frequently asked questions

Roosevelt requires a commercial building permit for: New commercial building, 3-plex or 4-plex multi-family dwelling, addition, remodel, or repair within Roosevelt City limits; Architect and/or engineer seal required for all commercial buildings or buildings with three (3) or more dwelling units; Utah Licensed General Contractor's name and Utah State License #; Water meter size (3/4", 1", 1.5", or 2") and existing water meter/sewer service status; Duchesne County Assessor's Parcel Number for the job site; 24-hour advance notice required to schedule inspections. If your project isn't listed, confirm with Roosevelt City Building Department at (435) 722-5001 (Building Department); Fax (435) 722-5000 before starting work.

In Roosevelt, the published Building Permit Fee (valuation-based) is: Same citywide valuation table as the Residential/Duplex Building Permit: $23.50 for $1-$500, scaling to $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above that. Additional published fees: Sewer Connection — Commercial (Each Building in Multiple Dwellings or P.U.D.) — $5,500.00 (City); $6,000.00 (County, for properties outside city limits on Roosevelt sewer); Water Impact Fee (new connection, 3/4"-6" meter) — $3,000.00 (includes $3,000.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line; Electrical Repair / Gas Line Change Out — Not separately itemized as commercial-specific figures in the published fee schedule. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Roosevelt does not publish a plan-review timeline for this permit. Contact Roosevelt City Building Department at (435) 722-5001 (Building Department); Fax (435) 722-5000 for current turnaround.

You'll need: Commercial Building Permit Application. See the required-documents checklist on this page for details on each.

Roosevelt requires 3 inspection(s) for a commercial building permit, in order: Footing/Foundation, Framing, Final. Schedule each through Roosevelt City Building Department ((435) 722-5001 (Building Department); Fax (435) 722-5000).

Apply through Roosevelt City Building Department at 255 South State Street, Roosevelt, UT 84066. Phone: (435) 722-5001 (Building Department); Fax (435) 722-5000, email: djohnson@rooseveltcity.com (Dean Johnson, Building Inspector); deschler@rooseveltcity.gov (Drew Eschler, Planning and Zoning Division Manager, (435) 725-7206). Office hours: Monday-Thursday, 7:30 a.m. to 5:30 p.m. (closed Fridays), per Roosevelt City's Building Department page.. Official information: https://www.rooseveltcity.gov/151/Building-Department.

Roosevelt, Utah has adopted: Roosevelt City does not separately publish IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC edition years on its Building Department page or on its own permit application forms. Both the Commercial Building Permit Application and the Residential/Duplex Building Permit Application state only: 'Decisions relative to this application are subject to review by the chief executive officer of the municipal or county entity issuing this building permit and appeal under the International Building Code as adopted by Legislature' — i.e., the city defers to whatever edition the Utah Legislature has adopted statewide, without itemizing it locally.; 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current statewide edition as of 7/1/2026 (2021 edition governed through 6/30/2026).; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 statewide revision.; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current statewide edition as of 7/1/2026.; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current statewide edition as of 7/1/2026.; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current statewide edition as of 7/1/2026.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — Utah Code § 15A-2-103(1)(h); current as of 7/1/2026.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current statewide edition as of 7/1/2026.; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); statewide by statute, not separately itemized by Roosevelt.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the 7/1/2026 revision.; Roosevelt City Standard Specifications and Drawings (originally published March 2014, updated September 2015) — governs public infrastructure construction (streets, water, sewer, storm drain), referenced by the Street Right-of-Way Encroachment Permit; this is a public-works construction standard, not a building-code edition adoption, and does not itemize IBC/IRC edition years.. Local amendments apply — see the Roosevelt overview page for the full list.

Yes. Per the Commercial Building Permit Application, all commercial buildings, or buildings with three (3) or more dwelling units, must have an architect and/or engineer seal on the submitted plans.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roosevelt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Roosevelt.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.