Commercial Building Permit in Roosevelt, Utah
Required for new commercial building construction, 3-plex/4-plex multi-family dwellings, additions, remodels, and repairs to existing commercial buildings within Roosevelt City limits. Uses the same citywide valuation-based fee table as the Residential/Duplex permit; buildings with three or more dwelling units or any commercial building must have an architect and/or engineer seal.
Verified 2026-07-19 · Source
When you need this permit
- New commercial building, 3-plex or 4-plex multi-family dwelling, addition, remodel, or repair within Roosevelt City limits
- Architect and/or engineer seal required for all commercial buildings or buildings with three (3) or more dwelling units
- Utah Licensed General Contractor's name and Utah State License # Contractor
- Water meter size (3/4", 1", 1.5", or 2") and existing water meter/sewer service status
- Duchesne County Assessor's Parcel Number for the job site
- 24-hour advance notice required to schedule inspections
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Water Fee Schedule, City New Installation Fees — for a 3/4"-6" meter, the City rate is $3,000.00 (with a $3,000.00 hookup fee); Show full citationHide
Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Water Fee Schedule, City New Installation Fees — for a 3/4"-6" meter, the City rate is $3,000.00 (with a $3,000.00 hookup fee); the schedule's separate County rate ($5,000.00, $3,500.00 hookup) does not apply within Roosevelt City limits and was corrected here after an earlier draft misattributed it as the City figure. The application form's 'Water Impact Fee' line item is not separately itemized for commercial vs. residential use in the published schedule.The Commercial Building Permit Application lists 'Electrical Repair' and 'Gas line Change out' as fee lines; Show full citationHide
The Commercial Building Permit Application lists 'Electrical Repair' and 'Gas line Change out' as fee lines; the closest published figures are the general 'Electrical Inspection' ($25.00) and 'Gas Line Inspection' entries in Resolution 2024-322's Other Inspections and Fees section, but the schedule does not confirm these are the same fee applied to commercial repair/change-out work. Confirm with the Building Department before budgeting.Review timeline
Inspection process
- 1
Footing/Foundation
Per the statewide-adopted construction code; 24-hour advance notice required.
- 2
Framing
Structural framing inspection, subject to engineer/architect seal review for qualifying buildings.
- 3
Final
Final inspection prior to occupancy.
See the full Roosevelt inspection guide — scheduling & re-inspection fees →
Tips
- Commercial buildings and any building with three or more dwelling units require an architect and/or engineer seal — confirm this requirement applies before submitting plans for a 3-plex or 4-plex.
- The Commercial Building Permit Application form has no fee amounts pre-printed; verify current dollar figures directly against Resolution 2024-322 or by calling (435) 722-5001, since several line items (Electrical Repair, Gas line Change out) are not clearly itemized as commercial-specific figures in the published fee schedule.
- Roosevelt City has no separate 'Change of Use' or 'Certificate of Occupancy' permit type or fee line — neither Resolution 2024-322 (the Consolidated Fee Schedule, covering Building, Subdivision/Planning/Zoning, and Business License fee tables) nor the Building Department page mentions either term. A change in a tenant's use or occupancy classification is handled as part of the standard valuation-based Commercial Building Permit review above. A new business at an existing address separately requires a Business License application that includes a City Building Department Fire and Safety Inspection of the premises, per rooseveltcity.gov/152/Business-Licensing-Home-Occupations. The City's own sources give that application's fee inconsistently — the Business Licensing webpage and Resolution 2024-322's fee table do not agree — so ask the City for the current figure rather than relying on either.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roosevelt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Roosevelt.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Roosevelt's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Roosevelt yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Roosevelt lands. Privacy.
Other permits in Roosevelt
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Roosevelt project checklist
Describe your project once and get every permit, document, and fee it triggers in Roosevelt — in one checklist. Free, for any city and any number of projects.
Get started →