Skip to main content
PermitBase

Version history — Roosevelt, Utah

This is PermitBase’s own verified record for Roosevelt, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Roosevelt’s actual law was at that time.

Permanent link to today’s record

/utah/duchesne-county/roosevelt-ut/as-of/2026-07-22/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-07-22Current record
  • 2026-07-21Superseded
  • 2026-07-20Superseded
    • Roosevelt, Utah — EV Charger / EVSE Permit record added
    • Roosevelt, Utah — Fire Sprinkler System Permit record added
    • Roosevelt, Utah — Fire Sprinkler System Permit fee record updated: No permit or drawings required → No permit or plan-review fee charged
  • 2026-07-19Initial record — coverage of Roosevelt began
    • Roosevelt, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
    • Roosevelt, Utah — Commercial Building Permit fee record updated: $5,000.00 (includes $3,500.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line → $3,000.00 (includes $3,000.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line
    • Roosevelt, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: $5,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures → $3,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures
    • Roosevelt, Utah — Residential/Duplex Building Permit record added
    • Roosevelt, Utah — Residential/Duplex Building Permit record removed