- 2026-07-22Current record
- 2026-07-21Superseded
- 2026-07-20Superseded
- Roosevelt, Utah — EV Charger / EVSE Permit record added
- Roosevelt, Utah — Fire Sprinkler System Permit record added
- Roosevelt, Utah — Fire Sprinkler System Permit fee record updated: No permit or drawings required → No permit or plan-review fee charged
- 2026-07-19Initial record — coverage of Roosevelt began
- Roosevelt, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
- Roosevelt, Utah — Commercial Building Permit fee record updated: $5,000.00 (includes $3,500.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line → $3,000.00 (includes $3,000.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line
- Roosevelt, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: $5,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures → $3,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures
- Roosevelt, Utah — Residential/Duplex Building Permit record added
- Roosevelt, Utah — Residential/Duplex Building Permit record removed