Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-19.

Roosevelt building permits

Verified

Roosevelt, Utah — as published 2026-07-19.

Verified 2026-07-19 · Source

Codes adopted

Roosevelt City does not separately publish IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC edition years on its Building Department page or on its own permit application forms. Both the Commercial Building Permit Application and the Residential/Duplex Building Permit Application state only: 'Decisions relative to this application are subject to review by the chief executive officer of the municipal or county entity issuing this building permit and appeal under the International Building Code as adopted by Legislature' — i.e., the city defers to whatever edition the Utah Legislature has adopted statewide, without itemizing it locally.2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current statewide edition as of 7/1/2026 (2021 edition governed through 6/30/2026).2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 statewide revision.2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current statewide edition as of 7/1/2026.2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current statewide edition as of 7/1/2026.2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current statewide edition as of 7/1/2026.2024 International Energy Conservation Code (IECC), single unsplit statewide edition — Utah Code § 15A-2-103(1)(h); current as of 7/1/2026.2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current statewide edition as of 7/1/2026.2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); statewide by statute, not separately itemized by Roosevelt.2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the 7/1/2026 revision.Roosevelt City Standard Specifications and Drawings (originally published March 2014, updated September 2015) — governs public infrastructure construction (streets, water, sewer, storm drain), referenced by the Street Right-of-Way Encroachment Permit; this is a public-works construction standard, not a building-code edition adoption, and does not itemize IBC/IRC edition years.

Permit types & fees

Residential/Duplex Building Permit

Verified

Required for new single-family dwelling and duplex construction, additions, remodels, basement finishes, detached garages, carports/patio covers, and sheds within Roosevelt City limits. Building valuation determines the base permit fee per the city's citywide valuation-based fee table (Resolution 2024-322); water impact, sewer connection, secondary water, electrical, and gas-line fees are billed as separate line items on the same application.

Verified 2026-07-20 · Source

Requirements

  • New single-family dwelling or duplex construction, addition, remodel, basement finish, detached garage, carport/patio cover, or shed within Roosevelt City limits
  • Duchesne County Assessor's Parcel Number for the job site
  • Utah-licensed general contractor's name and Utah State License #, or owner-builder designation
  • Water meter size (3/4" or 1") and whether the property has an existing water meter and sewer service
  • 24-hour advance notice required to schedule inspections, per the application form

Required documents

  • RequiredResidential/Duplex Building Permit ApplicationRoosevelt City Building Department's own application, submitted/emailed to Building Inspector Dean Johnson (djohnson@rooseveltcity.com).

Fee schedule

Fee typeAmountNotes
Building Permit Fee — $1.00 to $500.00$23.50Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Building Department Fee Schedule (valuation table).
Building Permit Fee — $501.00 to $2,000.00$23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereofRoosevelt City Consolidated Fee Schedule, Resolution 2024-322.
Building Permit Fee — $2,001.00 to $25,000.00$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereofRoosevelt City Consolidated Fee Schedule, Resolution 2024-322.
Building Permit Fee — $25,001.00 to $50,000.00$391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereofRoosevelt City Consolidated Fee Schedule, Resolution 2024-322.
Building Permit Fee — $50,001.00 to $100,000.00$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereofRoosevelt City Consolidated Fee Schedule, Resolution 2024-322.
Building Permit Fee — $100,001.00 to $500,000.00$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00 or fraction thereofRoosevelt City Consolidated Fee Schedule, Resolution 2024-322.
Building Permit Fee — $500,001.00 to $1,000,000.00$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00 or fraction thereofRoosevelt City Consolidated Fee Schedule, Resolution 2024-322.
Building Permit Fee — $1,000,001.00 and up$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00 or fraction thereofRoosevelt City Consolidated Fee Schedule, Resolution 2024-322.
Water Impact Fee (new connection, 3/4"-6" meter)$5,000.00 (includes $3,500.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main lineRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, Water Fee Schedule, City New Installation Fees.
Sewer Connection — Residential (Single Family Dwelling)$4,000.00 (City); $5,000.00 (County, for properties outside city limits on Roosevelt sewer)Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Sewer Fee Schedule.
Sewer Connection — DuplexNot separately itemized in the published fee scheduleThe Residential/Duplex Building Permit Application lists 'Sewer Connection-Duplex' as its own fee line, but Resolution 2024-322's Sewer Fee Schedule only publishes 'Single Family Dwelling' ($4,000 City / $5,000 County) and 'Commercial, Each Building in Multiple Dwellings or P.U.D.' ($5,500 City / $6,000 County) tiers — which of these applies to a duplex is not stated; confirm with the Building Department before budgeting.
Secondary Water Connection Fee$500.00, required if the property is located in an area where secondary water service is availableRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, Secondary Water Rates.
Electrical Inspection$25.00Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Other Inspections and Fees.
ShedFee amount not legible in the source PDF's 'Other Inspections and Fees' section (OCR-garbled column adjacent to Electrical/Gas Line Inspection entries)Roosevelt City Consolidated Fee Schedule, Resolution 2024-322 — the application form lists 'Shed' as its own fee line; the source document confirms a shed fee exists but the exact dollar figure could not be reliably read from the retrieved PDF text extraction. Confirm with the Building Department before budgeting.

Commercial Building Permit

Verified

Required for new commercial building construction, 3-plex/4-plex multi-family dwellings, additions, remodels, and repairs to existing commercial buildings within Roosevelt City limits. Uses the same citywide valuation-based fee table as the Residential/Duplex permit; buildings with three or more dwelling units or any commercial building must have an architect and/or engineer seal.

Verified 2026-07-19 · Source

Requirements

  • New commercial building, 3-plex or 4-plex multi-family dwelling, addition, remodel, or repair within Roosevelt City limits
  • Architect and/or engineer seal required for all commercial buildings or buildings with three (3) or more dwelling units
  • Utah Licensed General Contractor's name and Utah State License #
  • Water meter size (3/4", 1", 1.5", or 2") and existing water meter/sewer service status
  • Duchesne County Assessor's Parcel Number for the job site
  • 24-hour advance notice required to schedule inspections

Required documents

  • RequiredCommercial Building Permit ApplicationRoosevelt City Building Department's own application, requiring engineer/architect, general contractor, and fire protection/electrical/mechanical/plumbing contractor information with Utah license numbers.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Same citywide valuation table as the Residential/Duplex Building Permit: $23.50 for $1-$500, scaling to $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above thatRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, Building Department Fee Schedule — this table applies to 'TOTAL VALUATION' generally and is not itemized separately by residential vs. commercial use.
Sewer Connection — Commercial (Each Building in Multiple Dwellings or P.U.D.)$5,500.00 (City); $6,000.00 (County, for properties outside city limits on Roosevelt sewer)Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Sewer Fee Schedule.
Water Impact Fee (new connection, 3/4"-6" meter)$3,000.00 (includes $3,000.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main lineRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, Water Fee Schedule, City New Installation Fees — for a 3/4"-6" meter, the City rate is $3,000.00 (with a $3,000.00 hookup fee); the schedule's separate County rate ($5,000.00, $3,500.00 hookup) does not apply within Roosevelt City limits and was corrected here after an earlier draft misattributed it as the City figure. The application form's 'Water Impact Fee' line item is not separately itemized for commercial vs. residential use in the published schedule.
Electrical Repair / Gas Line Change OutNot separately itemized as commercial-specific figures in the published fee scheduleThe Commercial Building Permit Application lists 'Electrical Repair' and 'Gas line Change out' as fee lines; the closest published figures are the general 'Electrical Inspection' ($25.00) and 'Gas Line Inspection' entries in Resolution 2024-322's Other Inspections and Fees section, but the schedule does not confirm these are the same fee applied to commercial repair/change-out work. Confirm with the Building Department before budgeting.

Demolition Permit

Verified

Required for demolition of residential or commercial structures within Roosevelt City limits. No fee is charged, but utility and infrastructure clearances must be obtained before the permit is issued.

Verified 2026-07-19 · Source

Requirements

  • Demolition of a residential or commercial building within Roosevelt City limits
  • Clearances required prior to issuance: Questar (natural gas), Moon Lake Electric, Roosevelt City Water/Sewer, and Strata Networks
  • Asbestos inspection required if applicable
  • Water and sewer laterals must be capped at the back of the sidewalk unless being re-used
  • City must be notified by calling (435) 722-5001 when demolition is complete

Required documents

  • RequiredDemolition Permit ApplicationRoosevelt City Building Department's own application, signed off by Dean Johnson, Roosevelt City Building Inspector.

Fee schedule

Fee typeAmountNotes
Demolition Permit Fee$0.00 — no fee requiredDemolition Permit Application, Roosevelt City Building Department: 'No fee will be required.'

Sign Permit

Verified

Required for free-standing, flat, wall-attached, or painted-on-building signage within Roosevelt City limits, in the Professional Office Residential (PO-R) or Commercial (C) zoning districts. Requires both Planning and Zoning approval and Building Inspector approval before issuance.

Verified 2026-07-19 · Source

Requirements

  • Sign installation, whether free-standing or flat (attached to building or painted on building), within Roosevelt City limits
  • Zoning classification of Professional Office Residential District (PO-R, per Land Use Code 19-4, 19-5, 19-6) or Commercial District (C, per Land Use Code 20-8, 20-9, 20-10)
  • Approval by Planning and Zoning, followed by approval by the Building Inspector
  • Sign Contractor's Utah License # if a licensed contractor performs the installation

Required documents

  • RequiredSign Permit ApplicationRoosevelt City Building Department's own application, requiring sign value, property frontage, zoning district, sign placement type, and illumination status.

Fee schedule

Fee typeAmountNotes
Sign Permit Fee$50.00Sign Permit Application, Roosevelt City Building Department: 'Sign Permit Fee: $50.00,' confirmed as 'Sign Permits $50.00' in the Consolidated Fee Schedule, Resolution 2024-322, Other Inspections and Fees section.

Mobile Home Inspection Permit

Required for mobile/manufactured home inspection and foundation placement (single-wide trailer or modular home) within Roosevelt City limits. Fees are flat, distinguished by whether the unit is a single-wide trailer, a modular home, or a standard mobile home inspection.

Reviewed 2026-07-19 · Source

Requirements

  • Mobile, manufactured, or modular home placement or inspection within Roosevelt City limits

Required documents

  • RequiredMobile Home Inspection Permit ApplicationRoosevelt City Building Department's own application; listed on the city's Forms page and linked from the Building Department page.

Fee schedule

Fee typeAmountNotes
Mobile Home Inspection$50.00Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Other Inspections and Fees section.
Single Wide Trailer on Foundation$150.00Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Other Inspections and Fees section.
Modular Home on Foundation$400.00Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, Other Inspections and Fees section.

Street Right-of-Way Encroachment Permit

Verified

Required for any contractor work performed within Roosevelt City's public street right-of-way (e.g., utility cuts, excavation near public streets). Requires a minimum contractor bond and adherence to the City's Standard Specifications for the Construction of Public Works, rather than a flat application fee.

Verified 2026-07-19 · Source

Requirements

  • Work performed within Roosevelt City's public street right-of-way
  • Minimum $2,000.00 contractor bond (increased in multiples as determined by Public Works)
  • Proof of insurance per Section 0135 29-1.5 of Roosevelt City Standard Specifications
  • Water and Sewer Agreement approval, if applicable
  • Compliance with Roosevelt City Standard Specifications for the Construction of Public Works (September 2015 update)
  • 24-hour advance notice before backfilling, paving, or pouring concrete

Required documents

  • RequiredStreet Right-of-Way Encroachment Permit ApplicationRoosevelt City's own application, including a Contractor's Release, Waiver and Agreement to Indemnify section requiring authorized signature.

Fee schedule

Fee typeAmountNotes
Contractor Bond$2,000.00 minimum, increased in multiples thereof as determined by Public WorksStreet Right-of-Way Encroachment Permit Application, Roosevelt City: 'Contractor shall execute a minimum bond of $2,000.00 increased by multiples thereof as determined by Public Works.' No separate flat application fee was found on the permit form or in the Consolidated Fee Schedule (Resolution 2024-322) — the bond is the only monetary requirement stated.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Roosevelt does not issue a separate tenant-improvement permit; 'Interior Finish' is one of the explicit checkbox options under Permit Information on the City's own Commercial Building Permit Application, alongside New Commercial Building, Remodel Existing Building, Addition on Building, and Repair/Mechanical/Gas line/Electrical items. Interior-finish/tenant-improvement projects use the identical application form and the same citywide valuation-based Building Permit Fee table (Resolution 2024-322) used for new commercial construction.

Verified 2026-07-19 · Source

Requirements

  • 'Interior Finish' checked under Permit Information on the Commercial Building Permit Application
  • Architect and/or engineer seal required if the tenant space is within a building with three or more dwelling units, per the application's general commercial requirement
  • Utah Licensed General Contractor's name and Utah State License #, or applicable trade contractor licenses (electrical, mechanical, plumbing) for the scope of work
  • Duchesne County Assessor's Parcel Number for the job site
  • 24-hour advance notice required to schedule inspections, per the application form

Required documents

  • RequiredCommercial Building Permit ApplicationRoosevelt City Building Department's own application; lists 'Interior Finish' as its own checkbox under Permit Information, alongside New Commercial Building, Remodel Existing Building, and Addition on Building.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Same citywide valuation table as the Residential/Duplex and general Commercial Building Permit: $23.50 for $1-$500, scaling to $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above thatRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, Building Department Fee Schedule -- the 'Building Permit' line item on the Commercial Building Permit Application (which includes the 'Interior Finish' checkbox) is not itemized separately for tenant-improvement/interior-finish work versus new commercial construction.
Water Impact Fee / Sewer Connection (if a new utility connection is required)$3,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figuresThese line items appear on the same Commercial Building Permit Application used for 'Interior Finish' work, but the form does not state whether an interior tenant-finish project in an already-connected space is exempt. Confirm applicability with the Building Department (435-722-5001) before budgeting.
Electrical Repair / Gas Line Change OutNot separately itemized as tenant-improvement-specific figures in the published fee scheduleThe Commercial Building Permit Application's 'Electrical Repair' and 'Gas line Change out' fee lines are the closest published figures for interior-finish trade work; the Consolidated Fee Schedule's general 'Electrical Inspection' ($25.00) entry (Resolution 2024-322, Other Inspections and Fees) may apply. Confirm with the Building Department before budgeting.

Fire Sprinkler System Permit

Verified

Roosevelt City Fire Department, not the Roosevelt City Building Department, is the authority having jurisdiction (AHJ) for fire sprinkler systems in Roosevelt. Roosevelt City has no dedicated fire sprinkler/alarm page on its own website (rooseveltcity.gov), so this entry is primarily sourced from the industry-maintained "Authorities Having Jurisdiction" reference list (dated 2026-Apr-01) used by Utah fire protection contractors, which lists Roosevelt Fire Dept's specific submittal requirements. Re-chased 2026-07-20: this is independently corroborated by Roosevelt City's own official Consolidated Fee Schedule (Resolution 2024-322, adopted by the City Council June 4, 2024, rooseveltcity.gov/DocumentCenter/View/3162), which contains a dedicated "FIRE DEPARTMENT FEE SCHEDULE" section -- verified by direct PDF text extraction -- listing only escalating False Alarm / Nuisance Fire Alarm Call fees ($100 for a 3rd call in a year, rising to $150 + $25/call thereafter). The City's own current fee resolution contains no fire sprinkler system, fire alarm installation, or fire protection plan-review fee line item of any kind, which is consistent with (and a first-party confirmation of) the third-party AHJ list's description that Roosevelt Fire Dept charges no permit or plan-review fee for these systems.

Verified 2026-07-20 · Source

Requirements

  • New or modified fire sprinkler system requiring a trip (flow) test witnessed by Roosevelt Fire Department

Required documents

    Fee schedule

    Fee typeAmountNotes
    Fire Sprinkler Permit / Plan Review FeeNo permit or plan-review fee chargedPer the "Authorities Having Jurisdiction" reference list (2026-Apr-01 revision), the entry for "Roosevelt Fire Dept" (contact Roger Eschler, 255 South State, Roosevelt UT 84066, (435) 722-7220) states: "Wants to witness trip. No drawings or permit." This differs from most other Utah AHJs in this dataset, which require plan submittal, third-party review, and/or a permit fee. Independently corroborated 2026-07-20 against Roosevelt City's own official Consolidated Fee Schedule (Resolution 2024-322, adopted 2024-06-04, rooseveltcity.gov/DocumentCenter/View/3162/2022-307-Amending-the-Consolidated-Fee-Schedule) -- verified by direct PDF text extraction, this is the City's current, Council-adopted fee resolution and it contains a "FIRE DEPARTMENT FEE SCHEDULE" section, but that section covers only escalating False Alarm/Nuisance Fire Alarm Call penalty fees, with no fire sprinkler system, fire alarm installation, or fire-protection plan-review fee line item anywhere in the document. This is first-party confirmation (not just the third-party AHJ list) that Roosevelt does not charge a sprinkler/alarm permit or plan-review fee.

    EV Charger / EVSE Permit

    Verified

    Roosevelt City's Consolidated Fee Schedule has no distinct "EV Charger" or "EVSE" fee line item. Under "Other Inspections and Fees," the schedule lists a standalone $25.00 Electrical Inspection fee (alongside Mobile Home Inspection $50.00, Sign Permits $50.00, and Gas Line Inspection), which is the general fee that applies to standalone electrical work such as EV charger/EVSE installation not otherwise bundled into a new-construction building permit.

    Verified 2026-07-20 · Source

    Requirements

    • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Roosevelt City
    • Work performed per Roosevelt City's adopted electrical code

    Required documents

    • RequiredBuilding/Electrical Permit ApplicationSubmitted to the Roosevelt City Building Department (255 South State Street).

    Fee schedule

    Fee typeAmountNotes
    Electrical Inspection$25.00Roosevelt City Consolidated Fee Schedule, "Other Inspections and Fees" section: "Electrical Inspection — $25.00." No distinct EV Charger or EVSE fee category exists anywhere in the schedule (confirmed via full-text search of the document).

    Solar PV Installation Permit

    Verified

    Roosevelt City has no distinct solar or photovoltaic (PV) permit application, checklist, or fee line item. A rooftop or ground-mounted solar PV installation is processed as part of the general Residential/Duplex or Commercial Building Permit (whichever applies to the property), using the same citywide valuation-based Building Permit Fee table (Resolution 2024-322), plus the standard $25.00 Electrical Inspection fee for the electrical/interconnection work.

    Verified 2026-07-21 · Source

    Requirements

    • Installation of a rooftop or ground-mounted solar photovoltaic (PV) system at a residential or commercial property within Roosevelt City limits
    • Utah-licensed general contractor's name and Utah State License #, or owner-builder designation, per the Residential/Duplex or Commercial Building Permit Application (whichever applies)
    • Utah-licensed electrical contractor for the PV system's electrical/interconnection work
    • Structural documentation for roof-mounted arrays as required under the statewide-adopted construction code (2024 IBC/IRC family, per Utah Code § 15A-2-103)
    • 24-hour advance notice required to schedule inspections, per Roosevelt City's building permit application forms

    Required documents

    • RequiredResidential/Duplex Building Permit Application or Commercial Building Permit ApplicationRoosevelt City has no separate/dedicated solar PV permit application; a solar installation is submitted on whichever of the City's two general building permit applications matches the property type (residential/duplex vs. commercial), to Building Inspector Dean Johnson (djohnson@rooseveltcity.com).

    Fee schedule

    Fee typeAmountNotes
    Building Permit Fee (valuation-based)Same citywide valuation table as the Residential/Duplex and Commercial Building Permits: $23.50 for $1-$500, scaling to $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above thatRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, Building Department Fee Schedule — no distinct solar/PV valuation tier or fee line item exists; confirmed by direct fetch of the Building Department page and the Consolidated Fee Schedule PDF, plus a general web search, on 2026-07-21.
    Electrical Inspection$25.00Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, 'Other Inspections and Fees' section — the same flat electrical inspection fee applied to other standalone electrical work (e.g., EV chargers) also governs a solar PV system's electrical/interconnection work, since no solar-specific fee category exists.

    Fire Alarm System Permit

    Verified

    Roosevelt City does not publish a standalone Fire Alarm System permit, application, or fee, and Roosevelt Fire Department (255 South State Street; AHJ contact Roger Eschler) has no fire-alarm-specific page or fee schedule of its own. The City's Commercial Building Permit Application captures fire protection work through a general 'Fire Protection Contractor' field rather than a distinct fire alarm checklist item, and the Consolidated Fee Schedule's own 'FIRE DEPARTMENT FEE SCHEDULE' section (Resolution 2024-322) contains only escalating False Alarm / Nuisance Fire Alarm Call penalty fees for repeat false-alarm dispatches -- not an installation or system permit fee. A new or altered fire alarm system is therefore processed under the general Commercial Building Permit (with its Fire Protection Contractor field), using the same citywide valuation-based Building Permit Fee table, plus the standard $25.00 Electrical Inspection fee that already governs other standalone electrical/life-safety wiring work in this jurisdiction (e.g., EV chargers).

    Verified 2026-07-22 · Source

    Requirements

    • Installation, alteration, or extension of a fire alarm system in a new or existing building within Roosevelt City limits
    • Filed on the Commercial Building Permit Application, which includes a 'Fire Protection Contractor' field for the Utah-licensed contractor performing the work
    • No separate Roosevelt Fire Department drawing submittal, plan review, or permit process was found for fire alarm systems specifically -- confirmed against the industry-maintained Authorities Having Jurisdiction reference list (2026-Apr-01), whose Roosevelt Fire Dept entry documents only a sprinkler trip-test witness requirement ('Wants to witness trip. No drawings or permit.')
    • 24-hour advance notice required to schedule inspections, per the Commercial Building Permit Application

    Required documents

    • RequiredCommercial Building Permit ApplicationRoosevelt City Building Department's own application; includes a 'Fire Protection Contractor' field but no dedicated fire alarm system checklist item or separate fire alarm application, confirmed by direct PDF text extraction 2026-07-22.

    Fee schedule

    Fee typeAmountNotes
    Building Permit Fee (valuation-based)Same citywide valuation table as the general Commercial Building Permit: $23.50 for $1-$500, scaling to $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above thatRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, Building Department Fee Schedule -- no distinct fire alarm valuation tier or fee line item exists; confirmed by direct PDF text extraction of the full Consolidated Fee Schedule on 2026-07-22.
    Electrical Inspection$25.00Roosevelt City Consolidated Fee Schedule, Resolution 2024-322, 'Other Inspections and Fees' section -- the same flat electrical inspection fee applied to other standalone electrical/life-safety work (e.g., EV chargers) also governs a fire alarm system's wiring/interconnection work, since no fire-alarm-specific fee category exists.
    False Alarm / Nuisance Fire Alarm Call Fee (NOT a system installation or permit fee)$100.00 (3rd call to the same location in 1 year); $125.00 (4th call); $150.00 (5th call); $150.00 plus $25.00 for each additional call thereafterRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, 'FIRE DEPARTMENT FEE SCHEDULE' section -- this is the ONLY fire-alarm-related line item published anywhere in the City's fee schedule (confirmed by direct PDF text extraction, 2026-07-22), and it is a penalty fee for repeat false-alarm dispatches, not a system installation, plan-review, or permit fee. Listed here for transparency about what the schedule's 'fire alarm' entry actually covers.

    Change of Use Permit

    Verified

    Roosevelt City has no standalone Change of Use, Change of Occupancy, or Certificate of Occupancy re-issuance permit or fee. A direct, full-text check of the Building Department page, the Consolidated Fee Schedule (Resolution 2024-322, covering the Building Department, Subdivision/Planning/Zoning, and Business License fee tables), and the Planning and Zoning Application (which lists every other discretionary land-use request the City accepts -- Conditional Use Permit, Master Site Plan, Zoning Map Amendment, Lot Line Adjustment, Subdivision actions, PRUD, Time Extension, Petition to Vacate Right-of-Way, etc.) turned up zero mentions of 'change of use' or 'change of occupancy' as a distinct application type. If a use change is accompanied by construction or tenant-finish work, it is processed through the standard Commercial Building Permit / Commercial Tenant Improvement Permit process already documented in this file (valuation-based Building Permit Fee table). If no construction accompanies it, the closest governing requirement is a new or updated Roosevelt Business License application, which the City's Business Licensing page states triggers a Fire and Safety Inspection by the Building Department before the license is issued.

    Verified 2026-07-22 · Source

    Requirements

    • A change in the use or occupancy classification of an existing building or site within Roosevelt City limits
    • No City-published Change of Use-specific application form, submittal checklist, or fee schedule line item exists separate from the general Commercial Building Permit / Commercial Tenant Improvement Permit process and the Business License process
    • If construction or tenant-finish work accompanies the use change, filed on the Commercial Building Permit Application ('Interior Finish' or other applicable checkbox), per this file's commercial-tenant-improvement-permit entry
    • If the use change involves a new or different business operating at the location, a Business License application is required, which triggers a Fire and Safety Inspection of the premises by the Roosevelt City Building Department before the license is issued

    Required documents

    • OptionalCommercial Building Permit ApplicationUsed if the change of use is accompanied by construction, alteration, or tenant-finish work; no separate Change of Use application form is published by the City.
    • OptionalBusiness License ApplicationRequired if the use change involves a new or different business operating at the location; triggers a Fire and Safety Inspection by the Building Department before the license is issued, per the City's Business Licensing page.

    Fee schedule

    Fee typeAmountNotes
    Building Permit Fee (valuation-based) -- applies only if construction accompanies the use changeSame citywide valuation table as the commercial-building-permit and commercial-tenant-improvement-permit entries: $23.50 for $1-$500, scaling to $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 above thatRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, Building Department Fee Schedule -- no distinct or reduced rate applies specifically to change-of-use construction; billed identically to any other remodel/tenant-finish project.
    Business License/Solicitation Application -- applies if the use change involves a new/different business$100.00 per the Consolidated Fee Schedule (Resolution 2024-322), Business License Fee Schedule; the City's own Business Licensing webpage instead states $200.00 for the same line itemRoosevelt City Consolidated Fee Schedule, Resolution 2024-322, Business License Fee Schedule vs. rooseveltcity.gov/152/Business-Licensing-Home-Occupations -- the City's own fee resolution and its own webpage do not agree with each other on this figure (same discrepancy already flagged in this file's commercial-tenant-improvement-permit entry); confirm the current amount with the Building Department (435-722-5001) before budgeting.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-19.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roosevelt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    View current record →All versions →

    Permalink: /utah/duchesne-county/roosevelt-ut/as-of/2026-07-19/

    Snapshot date: 2026-07-19

    Commit: 73563e6

    Reproducible from PermitBase’s version-controlled dataset, commit 73563e6.