This is PermitBase’s published record for Moab as of 2026-07-16. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Moab building permits

Verified

Moab, Utah — as published 2026-07-16.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Moab City's official Building Inspection page (moabcity.gov/500/Building-Inspection) embeds a hidden 'BUILDING CODE' tab whose content is the verbatim text of an old snapshot of Utah Code § 15A-2-103 — live-inspected via DOM extraction 2026-07-16, that embedded text lists only 'Appendix J' (not C and J) and links frozen statute-version pages from 2014-2019, indicating the city's page predates even the pre-7/1/2026 code cycle, let alone the current one. The statute controls regardless of the city page's lag.2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches the (otherwise stale) statute text embedded on Moab's page.Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); Moab's embedded page text instead cites 'Appendix Q of the 2021 edition of the International Residential Code' (an older statute numbering, live-inspected 2026-07-16) — reproduced verbatim as history; the current statute's Appendix AQ is added here as the operative citation.2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. Moab's embedded page text still shows the 2021 IPC — live-inspected 2026-07-16, confirming lag. The statute controls.2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. Moab's embedded page text still shows the 2021 IMC — live-inspected 2026-07-16, confirming lag. The statute controls.2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. Moab's embedded page text still shows the 2021 IFGC — live-inspected 2026-07-16, confirming lag. The statute controls.2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i), superseding the 2021 IEBC. Moab's embedded page text still shows the 2021 IEBC — live-inspected 2026-07-16, confirming lag. The statute controls.2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). Moab's embedded page text still shows the 2020 NEC — live-inspected 2026-07-16, one edition behind the statewide-mandatory floor. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of the city's own page.2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law), superseding Moab's residential/commercial split. Moab's embedded page text still cites 'Residential provisions of the 2015 edition' and 'Commercial provisions of the 2021 edition' of the IECC — live-inspected 2026-07-16, preserved as history — both are now collapsed into the single current 2024 IECC. The statute controls.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not present anywhere in the statute text Moab's own page embeds (live-inspected 2026-07-16 — that embedded text predates the ISPSC's addition to § 15A-2-103 and instead references now-superseded mobile/manufactured-home provisions), added here per the current statute.Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not present in the statute text Moab's own page embeds, added here per the current statute.All per Moab City's official Building Inspection Department page (moabcity.gov/500/Building-Inspection), consistent with Utah Code § 15A-2-103 statewide code adoption.NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Moab's Building Inspection page (moabcity.gov/500/Building-Inspection) was live-inspected 2026-07-16 via DOM extraction of its hidden 'BUILDING CODE' tab panel, which turns out to embed the raw text of an old snapshot of § 15A-2-103 itself (with hyperlinks to frozen statute-version pages dated 2014-2019) rather than a city-authored summary — meaning Moab's page is not merely one cycle behind but reflects a substantially older statute snapshot (pre-dating even the introduction of the residential ISPSC provision). The current statewide statute, read live at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html, controls over this stale embedded text.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and two-family residential construction, additions, remodels, and any work regulated by the 2021 IRC and the 2024 IBC (current statewide per Utah Code § 15A-2-103, effective 7/1/2026) in Moab, including detached accessory dwelling units (Type 1 ADUs) built under Moab Municipal Code Chapter 17.70. Fees are valuation-based per the City's Master Fee Schedule (Moab Municipal Code § 3.50.165), most recently amended by Ordinance #2025-08 (effective June 24, 2025).

Verified 2026-07-08 · Source

Requirements

  • New single-family or two-family residential construction, or an accessory dwelling unit (ADU) permitted under Moab Municipal Code Chapter 17.70
  • Any work regulated by the 2021 IRC
  • Structural modifications regulated by the current-statewide 2024 IBC and the 2021 IRC (Utah Code § 15A-2-103(1)(a)/(b))
  • Site plan submittal (required per the official Building Permit Application; may be marked N/A for interior-only work)
  • Utah State Contractor's License and Moab municipal business license for the general contractor and any subcontractors (electrical, plumbing, mechanical), per the official Building Permit Application form

Required documents

  • RequiredBuilding Permit ApplicationOfficial City of Moab Building Permit Application (3-page form): applicant/owner/contractor information, project valuation, building details (SF, stories, bedrooms, bathrooms, occupancy), site plan flag, floodplain status, and a routing sheet for Floodplain Administrator, Fire Department, Engineering, Health Department, Public Works & Utility, Zoning Administrator, and Building Department sign-off. Submitted in person at 217 E Center Street, emailed to permitting@moabcity.gov, or filed online via the City's iworq portal.
  • RequiredSite PlanSite plan showing lot dimensions and building placement; the official application form includes a Site Plan Submitted Yes/No/N-A checkbox alongside minimum setback fields (front, side, side, rear).
  • OptionalCOMcheck / REScheckEnergy code compliance documentation; the official Building Permit Application includes checkboxes for 'COMcheck Emailed' and 'REScheck Emailed' alongside electronic plan submission.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (Moab Municipal Code § 3.50.165, as amended by Ordinance #2025-08, effective 06/24/2025)$1.00–$500.00: $85.00 flat. $501.00–$2,000.00: $100.00 for the first $500 plus $3.66 for each additional $100 (or fraction). $2,001.00–$25,000.00: $119.90 for the first $2,000 plus $16.80 for each additional $1,000 (or fraction). $25,001.00–$50,000.00: $506.30 for the first $25,000 plus $12.12 for each additional $1,000. $50,001.00–$100,000.00: $809.30 for the first $50,000 plus $8.40 for each additional $1,000. $100,001.00–$500,000.00: $1,229.30 for the first $100,000 plus $6.72 for each additional $1,000. $500,001.00–$1,000,000.00: $3,917.30 for the first $500,000 plus $6.72 for each additional $1,000. $1,000,001.00 and up: $7,277.30 for the first $1,000,000 plus $6.72 for each additional $1,000.
Moab Municipal Code § 3.50.165 'Building permit (by total valuation)' table, as adopted by Ordinance #2023-06 (2023) and the $1–$500 tier subsequently updated from $65.00 to $85.00 by Ordinance… Show full citation

Moab Municipal Code § 3.50.165 'Building permit (by total valuation)' table, as adopted by Ordinance #2023-06 (2023) and the $1–$500 tier subsequently updated from $65.00 to $85.00 by Ordinance #2025-08 (passed June 24, 2025; all other valuation tiers unchanged by 2025-08). Valuation determined per attached ICC Building Valuation Data (updated every February/August per the fee schedule's own footnote). Source: adopted ordinance Attachment A PDFs, moabcity.gov/DocumentCenter.

State Building Code Training Fund Surcharge ('State 1%')1% of the building permit fee
Statewide surcharge required by the Uniform Building Standards Act (Utah Code Title 58-56) and Utah Admin. Show full citation

Statewide surcharge required by the Uniform Building Standards Act (Utah Code Title 58-56) and Utah Admin. Code R156-15A-230; every Utah compliance agency issuing building permits must collect this 1% surcharge and remit 85% to the Division of Professional Licensing's Building Code Training Fund. Appears as its own 'STATE 1%' line item on Moab's official Building Permit Application fee routing box — this is a statutory pass-through, not a Moab-set fee.

Building Permit Renewal Fee$85.00Moab Municipal Code § 3.50.165, added by Ordinance #2025-08: covers renewal of a permit that has expired or is nearing expiration (permits are valid 180 days/6 months from the last inspection, per the ordinance's own commentary).
Re-inspection FeeActual costs plus 10%, 2-hour minimumMoab Municipal Code § 3.50.165, 'Reinspection fees assessed under provisions of Section 305.8 due prior to the reinspection' — 2-hour minimum added by Ordinance #2025-08.
Nonrefundable Residential Plan Review Deposit (new construction only)$170.00 per permitMoab Municipal Code § 3.50.165, updated from $130.00 to $170.00 by Ordinance #2025-08.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Moab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)Later version (2026-07-19) →View current record →All versions →