This is PermitBase’s published record for Unincorporated Iron County as of 2026-07-04. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Iron County building permits

Verified

Unincorporated Iron County, Utah — as published 2026-07-04.

Verified 2026-07-03 · Source

Codes adopted

2021 International Building Code (IBC), including Appendices C & J — Utah Code § 15A-2-103(1)(a). Iron County's own building.gov page and forms index do not publish a distinct county code-adoption page; per Utah's Title 15A compliance-agency model, unincorporated Iron County (like unincorporated Washington County in this corpus) is bound by the statewide-adopted specific editions absent its own published amendment.2021 International Residential Code (IRC), including Appendix Q — Utah Code § 15A-2-103(1)(b); this edition continues in force after the 7/1/2026 statutory rollover (only the IRC is held at 2021 while other codes advance to 2024).2021 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d) (2021 edition in force through 6/30/2026; 2024 IPC takes effect 7/1/2026 per the same statute).2021 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e) (2021 edition through 6/30/2026; 2024 IMC effective 7/1/2026).2021 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f) (2021 edition through 6/30/2026; 2024 IFGC effective 7/1/2026).2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); NEC remains 2023 across the 7/1/2026 statutory rollover (not superseded by a 2024/2026 NEC edition in that cycle).2021 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h) (2021 edition through 6/30/2026; 2024 IECC effective 7/1/2026).2021 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i) (2021 edition through 6/30/2026; 2024 IEBC effective 7/1/2026).2021 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n) (2021 edition through 6/30/2026; 2024 ISPSC effective 7/1/2026).NOTE: As of this file's lastVerified date (2026-07-03), the statutory rollover date of 7/1/2026 has passed; the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC are the current statewide default per Utah Code § 15A-2-103 (version effective 7/1/2026), superseding the 2021 editions cited above wherever they overlap. IRC remains 2021 and NEC remains 2023. Iron County's own building.gov/building page and its Forms index (ironcountyut.gov/building/forms) do not independently republish specific code-edition numbers, so this file reports the statutory default rather than a county-specific citation — flagged here rather than silently assumed identical to Cedar City's page, which does publish its own distinct Current Adopted Codes list.

Permit types & fees

Residential Building Permit (Single Family Dwelling, New Construction)

Verified

Required for new single-family dwelling construction in unincorporated Iron County, regulated by the state-adopted IBC/IRC per Utah Code § 15A-2-103. Building valuation for fee purposes is set at $108.46 per square foot for a Single Family Dwelling ($34.09/sq ft for a semi-finished basement, $23.20/sq ft for an unfinished basement) per the Iron County Fee Schedule adopted May 26, 2026.

Verified 2026-07-03 · Source

Requirements

  • New single-family dwelling construction
  • Structural engineered plans required for all dwellings, per the Building & Zoning FAQ
  • Soil/geotechnical testing required for any new dwelling
  • Utah Prairie Dog Clearance form required (per the county's Forms index)
  • Geotechnical Form — Footing Foundation and Geotechnical Form — Backfill Final Grade, both required as distinct submittals per the county's Forms index

Required documents

  • RequiredBuilding Permit ApplicationIron County's own application form, per ironcountyut.gov/building/forms.
  • RequiredPrairie Dog ClearanceUtah Division of Wildlife Resources / U.S. Fish and Wildlife Service clearance form, per the county's Forms index.
  • RequiredGeotechnical Form — Footing FoundationPer the county's Forms index; distinct from the Backfill Final Grade geotechnical form.
  • RequiredGeotechnical Form — Backfill Final GradePer the county's Forms index; a second, separate geotechnical sign-off stage from Footing Foundation.
  • OptionalOwner Builder FormIf the property owner is acting as their own general contractor, per the county's Forms index.
  • OptionalPlan Review WaiverAvailable per the county's Forms index; applicability criteria not published — contact the Building Department.
  • OptionalA-20 AcknowledgmentListed on the county's Forms index; specific content/applicability not detailed on the forms page itself — contact the Building Department for context.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1 to $500$24Iron County Fee Schedule, adopted May 26, 2026 (ironcountyut.gov/files/auditor/financials/fee-schedule-2026.pdf), Section 1: Building Department, Building Permit Fees table.
Building Permit Fee — valuation $501 to $2,000$24 for the first $500 + $3 for each additional $100 or fraction thereof, up to and including $2,000Iron County Fee Schedule, adopted May 26, 2026.
Building Permit Fee — valuation $2,001 to $40,000$69 for the first $2,000 + $11 for each additional $1,000 or fraction thereof, up to and including $40,000Iron County Fee Schedule, adopted May 26, 2026.
Building Permit Fee — valuation $40,001 to $100,000$487 for the first $40,000 + $9 for each additional $1,000 or fraction thereof, up to and including $100,000Iron County Fee Schedule, adopted May 26, 2026.
Building Permit Fee — valuation $100,001 to $500,000$1,027 for the first $100,000 + $7 for each additional $1,000 or fraction thereof, up to and including $500,000Iron County Fee Schedule, adopted May 26, 2026 (schedule prints the bracket start as '$100,0001' — a typographical duplication of the leading '1' in the source PDF; reported here as the evident intended value of $100,001 to match the preceding bracket's upper bound of $100,000).
Building Permit Fee — valuation $500,001 to $1,000,000$3,827 for the first $500,000 + $5 for each additional $1,000 or fraction thereof, up to and including $1,000,000Iron County Fee Schedule, adopted May 26, 2026.
Building Permit Fee — valuation $1,000,001 to $5,000,000$6,327 for the first $1,000,000 + $3.00 for each additional $1,000 or fraction thereof, up to and including $5,000,000Iron County Fee Schedule, adopted May 26, 2026.
Building Permit Fee — valuation $5,000,001 and up$18,327 for the first $5,000,000 + $1 for each additional $1,000 or fraction thereofIron County Fee Schedule, adopted May 26, 2026.
Building Application/Plan Review Submittal Fee (Dwelling)$250 (non-refundable, applied to the building permit)Iron County Fee Schedule, adopted May 26, 2026, Legend note (d).
Plan Review FeeUp to 85% of the Building Permit FeeIron County Fee Schedule, adopted May 26, 2026 — also referenced in Legend note (c): 'Subject to a plan check (P.C.), electrical, plumbing, mechanical fee up to eighty-five percent (85%) of the building fee.'
Utah State Fee1% of the Building Permit FeeIron County Fee Schedule, adopted May 26, 2026, consistent with the statewide Uniform Building Code Commission fee required of all Utah compliance agencies.
Geologic Condition Review$100Iron County Fee Schedule, adopted May 26, 2026.
Garbage Can Fee$100Iron County Fee Schedule, adopted May 26, 2026.
Building Permit RenewalUp to $750Iron County Fee Schedule, adopted May 26, 2026 — applies if no required inspections occur within 1 year of permit issuance, per the Building & Zoning FAQ.

Electrical Permit (Service Upgrade, New Meter Base)

Verified

Required for electrical service upgrades, new meter base installations, and other electrical work in unincorporated Iron County. Assessed as a flat Building Permit (B.P.) fee plus the state fee, per the Iron County Fee Schedule.

Verified 2026-07-03 · Source

Requirements

  • Electrical service upgrade or new meter base installation
  • Compliance with the 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g)

Required documents

  • RequiredBuilding Permit ApplicationIron County's own application form covers electrical work, per ironcountyut.gov/building/forms.

Fee schedule

Fee typeAmountNotes
Electrical (Service Upgrade, New Meter Base, etc.)B.P. $111.25 + State FeeIron County Fee Schedule, adopted May 26, 2026.
Utah State Fee1% of the Building Permit FeeIron County Fee Schedule, adopted May 26, 2026.

Mechanical Permit (Furnace, Gas Line/Meter, etc.)

Verified

Required for furnace, gas line, and gas meter installations in unincorporated Iron County. Assessed as a flat Building Permit (B.P.) fee plus the state fee, per the Iron County Fee Schedule.

Verified 2026-07-03 · Source

Requirements

  • Furnace installation or replacement
  • Gas line or gas meter installation
  • Gas Sizing Installation form required, per the county's Forms index

Required documents

  • RequiredGas Sizing InstallationDistinct downloadable form listed on the county's Forms index (ironcountyut.gov/building/forms/gas-sizing-installation).

Fee schedule

Fee typeAmountNotes
Mechanical (Furnace, Gas Line/Meter etc.)B.P. $111.25 + State FeeIron County Fee Schedule, adopted May 26, 2026.
Utah State Fee1% of the Building Permit FeeIron County Fee Schedule, adopted May 26, 2026.

Plumbing Permit (Water Heater, etc.)

Verified

Required for water heater installations and other plumbing work in unincorporated Iron County. Assessed as a flat Building Permit (B.P.) fee plus the state fee, per the Iron County Fee Schedule.

Verified 2026-07-03 · Source

Requirements

  • Water heater installation or replacement
  • Other plumbing work per the adopted 2021 IPC (2024 IPC effective 7/1/2026)

Required documents

  • RequiredBuilding Permit ApplicationIron County's own application form covers plumbing work, per ironcountyut.gov/building/forms.

Fee schedule

Fee typeAmountNotes
Plumbing (Water Heater, etc.)B.P. $112.25 + State FeeIron County Fee Schedule, adopted May 26, 2026.
Utah State Fee1% of the Building Permit FeeIron County Fee Schedule, adopted May 26, 2026.

Residential Solar Permit

Verified

Required for residential rooftop solar photovoltaic installations in unincorporated Iron County, with a distinct higher fee tier for systems including battery backup. Fees are flat per the Iron County Fee Schedule, not valuation-based.

Verified 2026-07-03 · Source

Requirements

  • Residential rooftop solar PV installation
  • Compliance with the 2023 NEC (rapid shutdown and bonding requirements) per Utah Code § 15A-2-103(1)(g)

Required documents

  • RequiredBuilding Permit ApplicationIron County's own application form covers solar installations, per ironcountyut.gov/building/forms.

Fee schedule

Fee typeAmountNotes
Residential SolarB.P. $391.25, P.C. $97.80 + State FeeIron County Fee Schedule, adopted May 26, 2026. B.P. = Building Permit fee; P.C. = Plan Check fee.
Residential Solar with Battery BackupB.P. $492.75, P.C. $123.20 + State FeeIron County Fee Schedule, adopted May 26, 2026 — a distinct, higher fee tier specifically for solar-plus-battery-storage systems.
Utah State Fee1% of the Building Permit FeeIron County Fee Schedule, adopted May 26, 2026.

Swimming Pool Permit

Verified

Required for swimming pool construction in unincorporated Iron County. Fee is flat per the Iron County Fee Schedule, not valuation-based.

Verified 2026-07-03 · Source

Requirements

  • In-ground or above-ground swimming pool construction
  • Compliance with the adopted 2021 ISPSC residential provisions (Utah Code § 15A-2-103(1)(n)), superseded by the 2024 ISPSC effective 7/1/2026

Required documents

  • RequiredBuilding Permit ApplicationIron County's own application form covers pool construction, per ironcountyut.gov/building/forms.

Fee schedule

Fee typeAmountNotes
Swimming PoolB.P. $568.30, P.C. $75 + State FeeIron County Fee Schedule, adopted May 26, 2026. B.P. = Building Permit fee; P.C. = Plan Check fee.
Utah State Fee1% of the Building Permit FeeIron County Fee Schedule, adopted May 26, 2026.

Remodel / Basement Finish Permit

Verified

Required for remodels and basement finishes in unincorporated Iron County. Uniquely among Iron County's published fee lines, the Building Permit fee for this category is based on the Contractor's Estimate rather than the per-square-foot valuation table used for new construction.

Verified 2026-07-03 · Source

Requirements

  • Remodel or basement finish work
  • Building permit required per the Building & Zoning FAQ ('A building permit is required for any structural, electrical, plumbing or mechanical work'; basement finishing is explicitly called out as requiring a permit)

Required documents

  • RequiredBuilding Permit ApplicationIron County's own application form, per ironcountyut.gov/building/forms.

Fee schedule

Fee typeAmountNotes
RemodelB.P. Contractor's Estimate, P.C. 40% to 65% + State FeeIron County Fee Schedule, adopted May 26, 2026 — the only Building Department fee line valued by contractor estimate rather than the county's per-square-foot valuation table.
Finish BasementB.P. $321.25, P.C. $75 + State FeeIron County Fee Schedule, adopted May 26, 2026 — a separate, flat-rate line item distinct from the general 'Remodel' category.
Utah State Fee1% of the Building Permit FeeIron County Fee Schedule, adopted May 26, 2026.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Iron County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/iron-county/unincorporated-iron/as-of/2026-07-04/

Snapshot date: 2026-07-04

Commit: 90be61d

Reproducible from PermitBase’s version-controlled dataset, commit 90be61d.