Unincorporated Iron County building permits
VerifiedUnincorporated Iron County, Utah — as published 2026-07-16.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit (Single Family Dwelling, New Construction)
VerifiedRequired for new single-family dwelling construction in unincorporated Iron County, regulated by the state-adopted IBC/IRC per Utah Code § 15A-2-103. Building valuation for fee purposes is set at $108.46 per square foot for a Single Family Dwelling ($34.09/sq ft for a semi-finished basement, $23.20/sq ft for an unfinished basement) per the Iron County Fee Schedule adopted May 26, 2026.
Verified 2026-07-03 · Source
Requirements
- New single-family dwelling construction
- Structural engineered plans required for all dwellings, per the Building & Zoning FAQ
- Soil/geotechnical testing required for any new dwelling
- Utah Prairie Dog Clearance form required (per the county's Forms index)
- Geotechnical Form — Footing Foundation and Geotechnical Form — Backfill Final Grade, both required as distinct submittals per the county's Forms index
Required documents
- RequiredBuilding Permit ApplicationIron County's own application form, per ironcountyut.gov/building/forms.
- RequiredPrairie Dog ClearanceUtah Division of Wildlife Resources / U.S. Fish and Wildlife Service clearance form, per the county's Forms index.
- RequiredGeotechnical Form — Footing FoundationPer the county's Forms index; distinct from the Backfill Final Grade geotechnical form.
- RequiredGeotechnical Form — Backfill Final GradePer the county's Forms index; a second, separate geotechnical sign-off stage from Footing Foundation.
- OptionalOwner Builder FormIf the property owner is acting as their own general contractor, per the county's Forms index.
- OptionalPlan Review WaiverAvailable per the county's Forms index; applicability criteria not published — contact the Building Department.
- OptionalA-20 AcknowledgmentListed on the county's Forms index; specific content/applicability not detailed on the forms page itself — contact the Building Department for context.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1 to $500 | $24 | Iron County Fee Schedule, adopted May 26, 2026 (ironcountyut.gov/files/auditor/financials/fee-schedule-2026.pdf), Section 1: Building Department, Building Permit Fees table. |
| Building Permit Fee — valuation $501 to $2,000 | $24 for the first $500 + $3 for each additional $100 or fraction thereof, up to and including $2,000 | Iron County Fee Schedule, adopted May 26, 2026. |
| Building Permit Fee — valuation $2,001 to $40,000 | $69 for the first $2,000 + $11 for each additional $1,000 or fraction thereof, up to and including $40,000 | Iron County Fee Schedule, adopted May 26, 2026. |
| Building Permit Fee — valuation $40,001 to $100,000 | $487 for the first $40,000 + $9 for each additional $1,000 or fraction thereof, up to and including $100,000 | Iron County Fee Schedule, adopted May 26, 2026. |
| Building Permit Fee — valuation $100,001 to $500,000 | $1,027 for the first $100,000 + $7 for each additional $1,000 or fraction thereof, up to and including $500,000 | Iron County Fee Schedule, adopted May 26, 2026 (schedule prints the bracket start as '$100,0001' — a typographical duplication of the leading '1' in the source PDF; reported here as the evident intended value of $100,001 to match the preceding bracket's upper bound of $100,000). |
| Building Permit Fee — valuation $500,001 to $1,000,000 | $3,827 for the first $500,000 + $5 for each additional $1,000 or fraction thereof, up to and including $1,000,000 | Iron County Fee Schedule, adopted May 26, 2026. |
| Building Permit Fee — valuation $1,000,001 to $5,000,000 | $6,327 for the first $1,000,000 + $3.00 for each additional $1,000 or fraction thereof, up to and including $5,000,000 | Iron County Fee Schedule, adopted May 26, 2026. |
| Building Permit Fee — valuation $5,000,001 and up | $18,327 for the first $5,000,000 + $1 for each additional $1,000 or fraction thereof | Iron County Fee Schedule, adopted May 26, 2026. |
| Building Application/Plan Review Submittal Fee (Dwelling) | $250 (non-refundable, applied to the building permit) | Iron County Fee Schedule, adopted May 26, 2026, Legend note (d). |
| Plan Review Fee | Up to 85% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026 — also referenced in Legend note (c): 'Subject to a plan check (P.C.), electrical, plumbing, mechanical fee up to eighty-five percent (85%) of the building fee.' |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026, consistent with the statewide Uniform Building Code Commission fee required of all Utah compliance agencies. |
| Geologic Condition Review | $100 | Iron County Fee Schedule, adopted May 26, 2026. |
| Garbage Can Fee | $100 | Iron County Fee Schedule, adopted May 26, 2026. |
| Building Permit Renewal | Up to $750 | Iron County Fee Schedule, adopted May 26, 2026 — applies if no required inspections occur within 1 year of permit issuance, per the Building & Zoning FAQ. |
Electrical Permit (Service Upgrade, New Meter Base)
VerifiedRequired for electrical service upgrades, new meter base installations, and other electrical work in unincorporated Iron County. Assessed as a flat Building Permit (B.P.) fee plus the state fee, per the Iron County Fee Schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Iron County Fee Schedule (adopted May 26, 2026) does not publish a separate EV-specific fee line item.
Verified 2026-07-03 · Source
Requirements
- Electrical service upgrade or new meter base installation
- Compliance with the 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g)
Required documents
- RequiredBuilding Permit ApplicationIron County's own application form covers electrical work, per ironcountyut.gov/building/forms.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical (Service Upgrade, New Meter Base, etc.) | B.P. $111.25 + State Fee | Iron County Fee Schedule, adopted May 26, 2026. |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026. |
Mechanical Permit (Furnace, Gas Line/Meter, etc.)
VerifiedRequired for furnace, gas line, and gas meter installations in unincorporated Iron County. Assessed as a flat Building Permit (B.P.) fee plus the state fee, per the Iron County Fee Schedule.
Verified 2026-07-03 · Source
Requirements
- Furnace installation or replacement
- Gas line or gas meter installation
- Gas Sizing Installation form required, per the county's Forms index
Required documents
- RequiredGas Sizing InstallationDistinct downloadable form listed on the county's Forms index (ironcountyut.gov/building/forms/gas-sizing-installation).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical (Furnace, Gas Line/Meter etc.) | B.P. $111.25 + State Fee | Iron County Fee Schedule, adopted May 26, 2026. |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026. |
Plumbing Permit (Water Heater, etc.)
VerifiedRequired for water heater installations and other plumbing work in unincorporated Iron County. Assessed as a flat Building Permit (B.P.) fee plus the state fee, per the Iron County Fee Schedule.
Verified 2026-07-03 · Source
Requirements
- Water heater installation or replacement
- Other plumbing work per the adopted 2024 IPC, current since 7/1/2026 (2021 edition governed through June 30, 2026)
Required documents
- RequiredBuilding Permit ApplicationIron County's own application form covers plumbing work, per ironcountyut.gov/building/forms.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing (Water Heater, etc.) | B.P. $112.25 + State Fee | Iron County Fee Schedule, adopted May 26, 2026. |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026. |
Residential Solar Permit
VerifiedRequired for residential rooftop solar photovoltaic installations in unincorporated Iron County, with a distinct higher fee tier for systems including battery backup. Fees are flat per the Iron County Fee Schedule, not valuation-based.
Verified 2026-07-03 · Source
Requirements
- Residential rooftop solar PV installation
- Compliance with the 2023 NEC (rapid shutdown and bonding requirements) per Utah Code § 15A-2-103(1)(g)
Required documents
- RequiredBuilding Permit ApplicationIron County's own application form covers solar installations, per ironcountyut.gov/building/forms.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Solar | B.P. $391.25, P.C. $97.80 + State Fee | Iron County Fee Schedule, adopted May 26, 2026. B.P. = Building Permit fee; P.C. = Plan Check fee. |
| Residential Solar with Battery Backup | B.P. $492.75, P.C. $123.20 + State Fee | Iron County Fee Schedule, adopted May 26, 2026 — a distinct, higher fee tier specifically for solar-plus-battery-storage systems. |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026. |
Swimming Pool Permit
VerifiedRequired for swimming pool construction in unincorporated Iron County. Fee is flat per the Iron County Fee Schedule, not valuation-based.
Verified 2026-07-03 · Source
Requirements
- In-ground or above-ground swimming pool construction
- Compliance with the adopted 2024 ISPSC residential provisions (Utah Code § 15A-2-103(1)(n)), current since 7/1/2026 (2021 edition governed through June 30, 2026)
Required documents
- RequiredBuilding Permit ApplicationIron County's own application form covers pool construction, per ironcountyut.gov/building/forms.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Swimming Pool | B.P. $568.30, P.C. $75 + State Fee | Iron County Fee Schedule, adopted May 26, 2026. B.P. = Building Permit fee; P.C. = Plan Check fee. |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026. |
Remodel / Basement Finish Permit
VerifiedRequired for remodels and basement finishes in unincorporated Iron County. Uniquely among Iron County's published fee lines, the Building Permit fee for this category is based on the Contractor's Estimate rather than the per-square-foot valuation table used for new construction.
Verified 2026-07-03 · Source
Requirements
- Remodel or basement finish work
- Building permit required per the Building & Zoning FAQ ('A building permit is required for any structural, electrical, plumbing or mechanical work'; basement finishing is explicitly called out as requiring a permit)
Required documents
- RequiredBuilding Permit ApplicationIron County's own application form, per ironcountyut.gov/building/forms.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Remodel | B.P. Contractor's Estimate, P.C. 40% to 65% + State Fee | Iron County Fee Schedule, adopted May 26, 2026 — the only Building Department fee line valued by contractor estimate rather than the county's per-square-foot valuation table. |
| Finish Basement | B.P. $321.25, P.C. $75 + State Fee | Iron County Fee Schedule, adopted May 26, 2026 — a separate, flat-rate line item distinct from the general 'Remodel' category. |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026. |
Commercial Building Permit
VerifiedRequired for new commercial construction in unincorporated Iron County, regulated by the state-adopted 2024 IBC per Utah Code § 15A-2-103. The county's own Fee Schedule (adopted May 26, 2026) publishes distinct building-valuation-per-square-foot rates by IBC occupancy classification (e.g., Business Group B $153.62/sq ft, Mercantile Group M $117.89/sq ft) and a separate, higher Building Application/Plan Review Submittal Fee for commercial projects than for a dwelling.
Verified 2026-07-20 · Source
Requirements
- New commercial construction, classified by IBC occupancy group for valuation purposes
- Structural engineered plans required for all commercial projects, per the Building & Zoning FAQ ('commercial projects require architectural, structural, plumbing, mechanical, and electrical plans')
- Utah Prairie Dog Clearance form required (per the county's Forms index)
- Geotechnical Form — Footing Foundation and Geotechnical Form — Backfill Final Grade, both required as distinct submittals
Required documents
- RequiredBuilding Permit ApplicationIron County's own application form, per ironcountyut.gov/building/forms.
- RequiredArchitectural, Structural, Plumbing, Mechanical, and Electrical PlansPer the Iron County Building & Zoning FAQ: 'commercial projects require architectural, structural, plumbing, mechanical, and electrical plans.'
- RequiredPrairie Dog ClearanceUtah Division of Wildlife Resources / U.S. Fish and Wildlife Service clearance form.
- RequiredGeotechnical Form — Footing FoundationPer the county's Forms index; distinct from the Backfill Final Grade geotechnical form.
- RequiredGeotechnical Form — Backfill Final GradePer the county's Forms index; a second, separate geotechnical sign-off stage.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Valuation — Assembly Group A | $160.50 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Department, Building Occupancy Classification table. |
| Building Valuation — Business Group B | $153.62 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Occupancy Classification table. |
| Building Valuation — Education Group E | $163.45 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Occupancy Classification table. |
| Building Valuation — Factory Group F | $83.65 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Occupancy Classification table. |
| Building Valuation — High Hazard Group H | $99.85 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Occupancy Classification table. |
| Building Valuation — Institutional Group I | $175.80 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Occupancy Classification table. |
| Building Valuation — Mercantile Group M | $117.89 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Occupancy Classification table. |
| Building Valuation — Residential Group R (Hotel/Motel, etc.) | $107.40 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Occupancy Classification table. |
| Building Valuation — Storage Group S | $72.63 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Occupancy Classification table. |
| Building Valuation — Utility & Misc. Group U | $42.05 per sq ft | Iron County Fee Schedule, adopted May 26, 2026, Building Occupancy Classification table. |
| Building Permit Fee — scaled from valuation bracket table | Same bracketed scaling table used for residential (e.g., $1,027 for the first $100,000 of valuation plus $7 per additional $1,000 up to $500,000) | Iron County Fee Schedule, adopted May 26, 2026 — the occupancy-classification per-square-foot rates above set the valuation, which is then run through the same Building Permit Fee bracket table documented in this file's residential-building-permit entry. |
| Building Application/Plan Review Submittal Fee (Commercial) | $500 (non-refundable, applied to the building permit) | Iron County Fee Schedule, adopted May 26, 2026, Legend note (d): 'Dwelling ($250) Commercial ($500) Other ($50).' The Commercial submittal fee is double the Dwelling rate. |
| Plan Review Fee | Up to 85% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026, Legend note (c): 'Subject to a plan check (P.C.), electrical, plumbing, mechanical fee up to eighty-five percent (85%) of the building fee.' Same mechanism documented for the residential-building-permit entry applies to commercial. |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026. |
Commercial Tenant Improvement / Tenant Finish Permit
Required for tenant improvement and remodel work inside an existing commercial building in unincorporated Iron County. Iron County's Fee Schedule does not publish a tenant-improvement-specific line; the county's 'Remodel' fee line (valued at Contractor's Estimate rather than the per-occupancy-classification valuation table) is the closest published match, alongside the $500 Commercial Building Application/Plan Review Submittal Fee.
Reviewed 2026-07-19 · Source
Requirements
- Tenant improvement or remodel work within an existing commercial building
- Architectural, structural, plumbing, mechanical, and electrical plans as applicable to the scope of work
Required documents
- RequiredBuilding Permit ApplicationIron County's own application form, per ironcountyut.gov/building/forms.
- RequiredPlans for Affected ScopeArchitectural, structural, plumbing, mechanical, and/or electrical plans covering the tenant improvement's scope of work.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Remodel | B.P. Contractor's Estimate, P.C. 40% to 65% + State Fee | Iron County Fee Schedule, adopted May 26, 2026 — the only Building Department fee line valued by contractor estimate rather than the per-occupancy-classification valuation table; the closest published match for commercial tenant improvement work, though the fee schedule does not explicitly label this line as commercial-only (it also covers residential remodels). |
| Building Application/Plan Review Submittal Fee (Commercial) | $500 (non-refundable, applied to the building permit) | Iron County Fee Schedule, adopted May 26, 2026, Legend note (d) — applies to commercial projects generally; not distinguished between new construction and tenant improvement. |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026. |
Sign Permit
VerifiedRequired before erecting a sign in unincorporated Iron County, per Iron County Code § 17.32.030(N) ("Application for a sign permit" is one of the county's enumerated Title 17 application forms) and Chapter 17.52 (Signs), which sets detailed maximum sign area, height, illumination, and placement standards by sign category. The county's adopted Fee Schedule separately confirms a $90 flat Sign Permit (zoning) fee. Re-chased 2026-07-20: the full text of Iron County Code Chapter 17.52 was located and read via Municode Library (a prior pass had not located this ordinance), resolving the previously-unverified sign-standards gap; no dedicated downloadable sign permit application form was found on the county Building Department's Forms page as of 2026-07-20, and no sign-permit-specific review timeline is published.
Verified 2026-07-20 · Source
Requirements
- Sign permit required to control and regulate the size, location, and type of sign per Iron County Code § 17.52.010
- Identification signs in Agriculture/Residential districts (e.g., dwelling occupant/profession/address signs): max 10 sq ft, not illuminated, one per dwelling — § 17.52.020(A)
- No other signs permitted in Agriculture/Residential zones except necessary warning/public-information signs or signs identifying churches, schools, public utility buildings, or publicly owned/operated properties — § 17.52.020(A)(2)
- Identification signs in Commercial/Industrial districts: max 1 sq ft per linear foot of street frontage (minimum 50 sq ft, maximum 200 sq ft per sign, same aggregate cap if multiple signs); may be illuminated with the light source not visible, no flashing/intermittent illumination; wall-mounted, projecting no more than 1 foot, not above the roofline; one sign per separate establishment — § 17.52.020(B)
- Permanent directional signs: max 12 sq ft, may be double-faced and illuminated (source not visible), wall placement no higher than 8 ft, freestanding height max 12 ft, no advertising copy — § 17.52.020(C)
- Temporary directional signs: max 12 sq ft, not illuminated, wall placement no higher than 8 ft / freestanding max 12 ft, must be removed within 10 days after the sign's purpose is fulfilled — § 17.52.020(D)
- Temporary for-sale/lease/hire/rental signs: max 100 sq ft, not illuminated, wall placement no higher than 24 ft (not above roofline) / freestanding max 24 ft, one per property, removed within 10 days after purpose fulfilled — § 17.52.020(E)
- Temporary freestanding subdivision/development signs: max 400 sq ft per sign (800 sq ft aggregate if more than one), not illuminated, max height 24 ft, up to 4 per property, removed within 10 days after purpose fulfilled — § 17.52.020(F)
- Temporary contractor/subcontractor/developer identification signs: max 200 sq ft, not illuminated, wall placement no higher than 24 ft / freestanding max 24 ft, no advertising copy, one per property, removed once the identified work is complete — § 17.52.020(G)
- Off-premises advertising (billboard-type) signs: max 700 sq ft including cutouts/projections/skirts, may be illuminated indirectly only, wall placement not above roofline / freestanding max 35 ft, minimum 500 ft spacing from another off-premises sign on an interstate (300 ft on other roads), must comply with the Utah Outdoor Advertising Act, permitted only on already-developed commercial/industrial sites, and requires Board of County Commissioners approval on Planning Commission recommendation — § 17.52.020(H)
Required documents
- RequiredSign Permit Application"Application for a sign permit" is an officially enumerated Title 17 application form per Iron County Code § 17.32.030(N), submitted to Iron County Building & Zoning. No downloadable sign-permit-specific PDF was found on the county's Building Department Forms page (ironcountyut.gov/building/forms, checked 2026-07-20, which lists ALUP, CUP, building-packet, and other forms but no sign-specific form) — request the form directly from the department.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit (zoning) | $90 | Iron County Fee Schedule, adopted May 26, 2026, Section 1: Building/Zoning/Planning > Planning/Zoning. |
EV Charger / EVSE Permit
VerifiedIron County does not publish a distinct EV charger, EVSE, or electric vehicle charging station permit or fee. EV charger/EVSE installation is electrical work and falls under the county's general Electrical Permit (Service Upgrade, New Meter Base, etc.), assessed as a flat Building Permit fee plus the state fee, per the Iron County Fee Schedule (adopted May 26, 2026). The fee schedule does not publish a separate EV-specific fee line item.
Verified 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel capacity to serve the charger, covered under the general Electrical Permit category
- Compliance with the 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g)
Required documents
- RequiredBuilding Permit ApplicationIron County's own application form covers electrical work, per ironcountyut.gov/building/forms.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical (Service Upgrade, New Meter Base, etc.) | B.P. $111.25 + State Fee | Iron County Fee Schedule, adopted May 26, 2026. Same flat fee category that covers other electrical work; no distinct EV-charger fee line item is published. |
| Utah State Fee | 1% of the Building Permit Fee | Iron County Fee Schedule, adopted May 26, 2026. |
Fire Sprinkler / Fire Alarm Permit
Iron County does not publish a standalone fire-sprinkler or fire-alarm permit fee. The county's Fee Schedule (adopted May 26, 2026) lists 'Fire' among the departments in its 'For Reference Only' section that 'have reported that they do not collect fees' (re-verified directly against the live PDF on 2026-07-22), and the Building Department's own list of inspected trades (Building, Electrical, Plumbing, Mechanical, Fuel Gas) does not include a distinct fire-suppression category. The real fallback path for fire alarm and automatic fire sprinkler plan review is the Utah State Fire Marshal's Office, which publishes statewide Fire Alarm and Automatic Fire Sprinkler Plan Submittal Forms billed at $0.022 per square foot of review scope with a $75 minimum fee (re-verified directly against both live SFM submittal-form PDFs on 2026-07-22). Whether the State Fire Marshal's plan-review authority is the operative path specifically for private commercial construction in unincorporated Iron County (versus, e.g., state-owned buildings or schools) is not independently confirmed on either agency's website, so this entry is marked partial rather than fully verified.
Reviewed 2026-07-22 · Source
Requirements
- Fire sprinkler and/or fire alarm system installation or modification in a new or existing building
- Iron County's own Fire department does not collect a plan-review or permit fee, per the county's Fee Schedule 'For Reference Only' section
- Fallback path: submit plans to the Utah State Fire Marshal's Office for statewide plan review using the Fire Alarm Plan Review Submittal Form and/or Automatic Fire Sprinkler Plan Submittal Form — jurisdictional scope over private commercial projects specifically within unincorporated Iron County is not independently confirmed
- Coordinate with Iron County Building & Zoning, (435) 865-5350, and Iron County Fire Warden Spencer Rollo, (435) 590-4714, to confirm whether fire-suppression plan review is folded into this jurisdiction's Commercial Building Permit review or must be routed separately to the State Fire Marshal
Required documents
- OptionalFire Alarm Plan Review Submittal FormUtah State Fire Marshal's Office form (planreviews@utah.gov, (801) 256-2390); required for fire alarm system plan review submittal, billed at $0.022/sq ft, $75 minimum.
- OptionalAutomatic Fire Sprinkler Plan Submittal FormUtah State Fire Marshal's Office form; required for automatic fire sprinkler system plan review submittal, billed at $0.022/sq ft, $75 minimum.
- OptionalBuilding Permit ApplicationIron County's own application form; recommended for coordination with this jurisdiction's Commercial Building Permit plan review, per ironcountyut.gov/building/forms.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Iron County Fire Plan Review / Permit Fee | None published | Iron County Fee Schedule, adopted May 26, 2026, 'For Reference Only' section: 'Fire' is listed among departments that 'have reported that they do not collect fees.' |
| Utah State Fire Marshal Plan Review Fee (Fire Alarm) | $0.022 per square foot of review scope; $75 minimum | Utah State Fire Marshal's Office, Fire Alarm Plan Review Submittal Form; fees must be paid before plan review is released. |
| Utah State Fire Marshal Plan Review Fee (Automatic Fire Sprinkler) | $0.022 per square foot of review scope; $75 minimum | Utah State Fire Marshal's Office, Automatic Fire Sprinkler Plan Submittal Form; same fee structure as the Fire Alarm form. |
Change of Use Permit
No standalone Change-of-Use or Certificate-of-Occupancy-verification permit or fee is published for unincorporated Iron County. The county's Fee Schedule (adopted May 26, 2026) contains no 'occupancy' or 'change of use' line item, and Iron County Code § 17.68.080(A) ('Change of use,' governing nonconforming uses) states only that 'a nonconforming use may only be changed to a use allowed in the zoning district in which the property is located by following the use permitting procedures as identified in this title' — re-verified directly against the ordinance text on 2026-07-22. An ordinary change of use therefore follows the county's standard Title 17 use-permitting process (Administrative Land Use Permit or Conditional Use Permit, depending on the use) rather than triggering a distinct fee, and a use/occupancy classification change without new construction, or a CO re-verification for an existing building, is expected to be handled through this jurisdiction's Commercial Building Permit plan review under the adopted 2024 IEBC (Utah Code § 15A-2-103(1)(i)).
Reviewed 2026-07-22 · Source
Requirements
- A distinct 'change of use' regulatory action applies only to an existing nonconforming use changing to a use allowed in its zoning district, per Iron County Code § 17.68.080(A)
- That transition must follow 'the use permitting procedures as identified in this title' — i.e., the same Title 17 permitting track (Administrative Land Use Permit or Conditional Use Permit) that would apply to the new use generally, not a separate change-of-use application
- A use or occupancy classification change inside an existing building without new construction is expected to be reviewed under the adopted 2024 IEBC as part of this jurisdiction's Commercial Building Permit plan review
Required documents
- RequiredAdministrative Land Use Permit or Conditional Use Permit ApplicationWhichever Title 17 permitting track applies to the new/proposed use — Iron County's Forms index and Fee Schedule publish these as distinct application types, not a dedicated 'change of use' form.
- OptionalBuilding Permit ApplicationRequired only if the use change is accompanied by construction or build-out affecting occupancy classification, per ironcountyut.gov/building/forms.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Administrative Land Use Permit — Nonresidential | $500 | Iron County Fee Schedule, adopted May 26, 2026, Section 1: Planning/Zoning — the closest published fee line for a nonresidential use change that does not require Conditional Use Permit review; re-verified directly against the live PDF 2026-07-22. |
| Conditional Use Permit (if the proposed use requires one) | $250 to $10,000+, tiered by parcel acreage (e.g. $250 for 5 acres or less, up to $10,000 for more than 400 acres) | Iron County Fee Schedule, adopted May 26, 2026 — applies instead of the Administrative Land Use Permit fee if the proposed use requires Conditional Use Permit approval rather than administrative review. |
| Building Permit Fee (if construction accompanies the use change) | Scaled from valuation per the same bracket table documented in this jurisdiction's commercial-building-permit entry | Iron County Fee Schedule, adopted May 26, 2026 — applies only if the use change involves new construction or build-out, not to a pure occupancy/use reclassification. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Iron County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.