Version history — Kanab, Utah
This is PermitBase’s own verified record for Kanab, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Kanab’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-02Current record
- Kanab, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record added: Commercial Construction Drawing Review (a.k.a. "Commercial Plan Review" in the July 2025 schedule) (65% of Building permit base)
- Kanab, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: See Building Permit Pricing Fee Schedule (separate document; not located online as of 2026-07-19) — based on number of inspections required for smaller projects, or construction cost for larger remodel/renovation projects → See Building Permit Pricing Fee Schedule (separate document; not located online as of 2026-08-02) — based on number of inspections required for smaller projects, or construction cost for larger remodel/renovation projects
- Kanab, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record removed: Commercial Construction Drawing Review
- Kanab, Utah — Commercial Building Permit fee record added: Commercial Construction Drawing Review (a.k.a. "Commercial Plan Review" in the July 2025 schedule) (65% of Building permit base)
- Kanab, Utah — Commercial Building Permit fee record removed: Commercial Construction Drawing Review
- 2026-07-22Superseded
- 2026-07-21Superseded
- 2026-07-20Superseded
- Kanab, Utah — EV Charger / EVSE Permit record added
- 2026-07-19Initial record — coverage of Kanab began