2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a), superseding the 2021 IBC. Holladay's own Inspection Guidelines & Codes page, live-checked 2026-07-16, still lists '2021 International Building Code' verbatim — the city's page has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city page's lag.2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 amendment. Matches the city's Inspection Guidelines & Codes page (live-checked 2026-07-16: '2021 International Residential Code').Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on the city's own Inspection Guidelines & Codes page (live-checked 2026-07-16), added here per statute.2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e), superseding the 2021 IMC. The city's page still lists '2021 International Mechanical Code' — live-checked 2026-07-16, confirming lag. The statute controls.2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f), superseding the 2021 IFGC. The city's page still lists '2021 International Fuel Gas Code' — live-checked 2026-07-16, confirming lag. The statute controls.2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d), superseding the 2021 IPC. The city's page still lists '2021 International Plumbing Code' — live-checked 2026-07-16, confirming lag. The statute controls.2023 National Electrical Code (NEC) — statewide-mandatory edition per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (the 2023 NEC baseline predates this code cycle). The city's Inspection Guidelines & Codes page lists '2020 National Electric Code' — one edition behind the statewide-mandatory floor, confirmed still unchanged via live-check 2026-07-16. Per Utah Code § 15A-1-204 (statewide-mandatory construction code), the 2023 NEC governs regardless of the city's own page.2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT as of 7/1/2026 per Utah Code § 15A-2-103(1)(h) (no residential/commercial split under current law), superseding the 2018 IECC. The city's page still lists '2018 International Energy Conservation Code' — live-checked 2026-07-16, confirming lag (this was already one edition behind the pre-7/1/2026 2021 IECC baseline other Salt Lake County cities used, and is now two editions behind current). The statute controls.2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not listed on the city's own Inspection Guidelines & Codes page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not listed on the city's own Inspection Guidelines & Codes page (live-checked 2026-07-16), added here per statute since the city's own materials omit it entirely.Modular Building Institute (MBI) Standards 1200 and 1205 — statewide per Utah Code § 15A-2-103(1)(o); not listed on the city's own Inspection Guidelines & Codes page, added here per statute.2021 International Fire Code (IFC) — per the city's official Inspection Guidelines & Codes page, live-checked 2026-07-16, unchanged. NOTE: the IFC is NOT among the codes adopted by Utah Code § 15A-2-103 (Title 15A Chapter 2, State Construction Code) — Utah's Fire Code is separately adopted under Title 15A Chapter 5, State Fire Code Act; left as published by the city, no statutory edition change applies via § 15A-2-103.2009 ANSI A117.1 Standard for Accessible and Usable Buildings and Facilities — per the city's official Inspection Guidelines & Codes page, live-checked 2026-07-16, unchanged.2015 Uniform Code for the Abatement of Dangerous Buildings — per the city's official Inspection Guidelines & Codes page, live-checked 2026-07-16, unchanged.Holladay City Code Title 3 (Consolidated Fee Schedule) and Title 13 (Building Permit / Zoning Compliance Review) — local amendments to the above; see localAmendments below.NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Holladay's Inspection Guidelines & Codes page (holladayut.gov/departments/community_development/building_division/inspection_guidelines___codes.php) was live-checked 2026-07-16 via real-browser navigation and confirmed still lagging — it verbatim lists 2021 IBC/IMC/IFGC/IPC/IRC/IFC, 2020 National Electric Code, and 2018 IECC, and omits IEBC and ISPSC entirely. The statewide statute controls over the city's un-updated page.

Permit types & fees

Residential Building Permit (New Dwelling / Remodel)

Verified

Required for new single-family residential construction and residential remodels regulated by the 2021 IRC and the 2024 IBC (current statewide per Utah Code § 15A-2-103, effective 7/1/2026; Holladay's own Inspection Guidelines & Codes page still lists the 2021 IBC as of live-check 2026-07-16, but the statute controls). Holladay uses a valuation-based (Based on Valuation / BOV) fee model tied to the 1997 Uniform Administrative Code Table 3-A, administered case-by-case by an in-house city Building Official (Rob Sears) rather than a published flat-dollar fee table.

Verified 2026-07-03 · Source

Requirements

  • New residential dwelling construction or residential remodel regulated by the 2021 IRC and the current-statewide 2024 IBC (Utah Code § 15A-2-103(1)(a)/(b))
  • Online application only, submitted via the city's iWorq-based Building Permit Application portal (holladay.portal.iworq.net)
  • Building plans uploaded with the application — the city will not accept an application without accompanying plans (oversized plans emailed directly to the permits team)
  • Zoning compliance review per Holladay City Code section 13.08.100 (Building Permit Zoning Compliance Review)
  • Site-specific design factors (snow load, seismic, frost depth) confirmed per address using the city's referenced Utah State University snow-load tool

Required documents

  • RequiredBuilding Permit Application (City of Holladay form / iWorq portal)Official application form listing property/owner/applicant/contractor information, licensed-contractor vs. owner-builder declaration, and an office-use fee breakdown (Building B.O.V. Fee, Electrical, Mechanical, Plumbing, Grading, Demolition, 1% Building Surcharge, Plan Check Fees, Geologic Study, Park/Storm/Fire/Police Impact fees, Pre-Inspection/Pre-Plan-Check credit).
  • OptionalOwner-Builder Certification and Agreement to Comply (DOPL)Required, signed and notarized, for applicants pursuing an owner-builder permit. The city automatically registers the permit with DOPL upon issuance. State restrictions: one house per calendar year, no more than three houses in five years.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (BOV)Determined per project valuation using the 1997 Uniform Administrative Code, Table 3-ACity of Holladay official Building FAQs page: 'Fees are based on the valuation of the project as per 1997 Uniform Administrative Code, Table 3-A.' No further public dollar-figure table was located; the city directs applicants to call the Building Division (801-527-3890) for a specific cost estimate. Left as the cited formula rather than an invented dollar amount.
1% Building Surcharge1% of the building fee, split 85%/15% between two accounting line items (per the official Building Permit application form's office-use fee section)Per the city's official Building Permit application form fee breakdown; no further public explanation of the 85/15 split purpose was located.

Electrical, Mechanical & Plumbing Permit

Verified

Covers standalone or combined electrical, mechanical, and plumbing work in Holladay. The city's official Building Permit application form lists these as separate itemized fee lines assessed alongside the Building B.O.V. Fee, but no public flat-dollar or percentage figure is published for these trade fees. EV charger/EVSE installation is electrical work and falls under this general Electrical fee line; the city has not published a distinct EV-specific permit, fee, or process. Rooftop solar panel installation is likewise not a distinct permit type in Holladay: the city's official Building FAQs page lists 'Electrical (service upgrade, meter change, new branch circuits, backup power; generator, solar, all new exterior lighting etc.)' and, separately, 'Alternative energy/heating (Solar panels, battery backup, ground source heat/cooling, etc.)' among the work categories requiring a permit, with no separate solar fee line or process published anywhere on the Building Division, FAQs, or Construction Submittal Requirements pages — solar installs are budgeted using the same Electrical Fee line as other electrical work.

Verified 2026-07-19 · Source

Requirements

  • Electrical, mechanical, or plumbing work regulated statewide by the 2024 IPC / 2024 IMC / 2024 IFGC (Utah Code § 15A-2-103(1)(d)/(e)/(f), effective 7/1/2026) and the 2023 NEC (§ 15A-2-103(1)(g), unchanged); Holladay's own Inspection Guidelines & Codes page still lists the 2021 IPC/IMC/IFGC and 2020 NEC as of live-check 2026-07-16, but the statute controls
  • Online application via the city's iWorq Building Permit Application portal

Required documents

  • RequiredBuilding Permit Application (City of Holladay form / iWorq portal)Submitted online only; the city does not accept paper or in-person-only applications without accompanying plans.

Fee schedule

Fee typeAmountNotes
Electrical FeeNot publicly itemized — assessed per project at permit issuanceThe city's official Building Permit application form lists 'Electrical' as a distinct fee line in the office-use fee breakdown, but no public dollar figure or percentage formula for this line was located on the Building Division, FAQs, or Fee Schedule pages. Contact 801-527-3890 for the specific fee.
Mechanical FeeNot publicly itemized — assessed per project at permit issuanceSame fee-form line-item basis as Electrical Fee above; no public dollar figure located.
Plumbing FeeNot publicly itemized — assessed per project at permit issuanceSame fee-form line-item basis as Electrical Fee above; no public dollar figure located.

EV Charger / EVSE Permit

Verified

Holladay does not publish a distinct EV charger/EVSE permit, fee, or process. The city's official Building Permit application form lists 'Electrical' as a distinct fee line in its office-use fee breakdown, and EV charger/EVSE installation is electrical work that falls under this general Electrical fee line, per the city's own Electrical, Mechanical & Plumbing Permit entry.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel/service capacity upgrade to serve the charger
  • Online application via the city's iWorq Building Permit Application portal

Required documents

  • RequiredBuilding Permit Application (City of Holladay form / iWorq portal)Submitted online only; lists 'Electrical' as a distinct office-use fee line covering EV charger and other electrical work.

Fee schedule

Fee typeAmountNotes
Electrical Fee (covers EV charger installation)Not publicly itemized — assessed per project at permit issuanceThe city's official Building Permit application form lists 'Electrical' as a distinct fee line in the office-use fee breakdown, but no public dollar figure or percentage formula for this line is published on the Building Division, FAQs, or Fee Schedule pages. Contact 801-527-3890 for the specific fee. EV chargers have no separate fee category and are billed under this same Electrical line.

Solar PV / Solar Panel Installation Permit

Verified

Holladay does not publish a distinct solar/solar-PV permit, application, checklist, or fee. The city's official Building FAQs page lists 'Alternative energy/heating (Solar panels, battery backup, ground source heat/cooling, etc.)' as its own itemized category under 'What Work Requires A Permit?', confirming a permit is required for solar installations, but the Building Division's Construction Submittal Requirements page publishes no solar-specific plan-submittal category or checklist PDF (only residential single-family, supplemental residential, and commercial/multi-family categories are listed), and neither the Consolidated Fee Schedule ordinance nor the Building Permit application form itemize a solar-specific fee line. As with EV chargers, a solar installation is instead billed using the general fee architecture already on the office-use fee breakdown: the Building Permit Fee (Based on Valuation, for any structural roof-mounting/racking work) and/or the Electrical Fee (for PV wiring and grid interconnection), per project. No evidence was found that Holladay participates in SolarAPP+ (the national automated instant-permitting platform for residential solar) — SolarAPP+'s own public materials list no Utah jurisdictions as participants as of this verification.

Verified 2026-07-21 · Source

Requirements

  • Installation of a rooftop or ground-mounted solar photovoltaic (PV) system, or a battery backup / alternative-energy system, at a residential or commercial property — listed as its own 'Alternative energy/heating' category requiring a permit on the city's official Building FAQs page
  • Online application via the city's iWorq Building Permit Application portal (holladay.portal.iworq.net) — the city does not accept applications without accompanying plans
  • Work regulated by the current statewide-adopted codes (2024 IBC/IRC structural and electrical provisions, 2023 NEC) per Utah Code § 15A-2-103; Holladay's own Inspection Guidelines & Codes page has not been updated to the 2024/2023 editions as of live-check 2026-07-16, but the statute controls
  • Roof-mounted systems: per the city's official Building FAQs page design-criteria note, 'At locations where roof snow load exceeds 30psf include 20% of the roof snow load in the effective seismic weight of the structure' — relevant to structural review of rooftop-mounted panel arrays

Required documents

  • RequiredBuilding Permit Application (City of Holladay form / iWorq portal)Submitted online only; the form's office-use fee breakdown has no distinct solar line item — solar work is billed under the existing Building B.O.V. and/or Electrical fee lines. No separate solar-specific application or checklist is published.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (BOV)Determined per project valuation using the 1997 Uniform Administrative Code, Table 3-AApplies to any structural/roof-mounting component of a solar installation, using the same valuation-based formula as every other building permit type in Holladay. No solar-specific dollar figure is published. City of Holladay official Building FAQs page: 'Fees are based on the valuation of the project as per 1997 Uniform Administrative Code, Table 3-A.'
Electrical Fee (covers solar PV wiring / interconnection)Not publicly itemized — assessed per project at permit issuanceThe city's official Building Permit application form lists 'Electrical' as a distinct fee line in the office-use fee breakdown; solar PV wiring and grid-interconnection work is billed under this same line, per the same fee architecture used for EV chargers and other electrical work. No public dollar figure or percentage formula for this line was located on the Building Division, FAQs, Construction Submittal Requirements, or Consolidated Fee Schedule pages. Contact 801-527-3890 for a project-specific quote.

Commercial Building Permit (New Commercial or Multi-Family Building)

Verified

Required for new commercial or multi-family building construction in Holladay, regulated by the 2024 IBC (current statewide per Utah Code § 15A-2-103(1)(a), effective 7/1/2026; Holladay's own Inspection Guidelines & Codes page still lists the 2021 IBC as of live-check 2026-07-16, but the statute controls). Holladay's Construction Submittal Requirements page explicitly lists 'New commercial or multi-family building' as its own plan-submittal category, distinct from residential single-family plans. As with the Residential Building Permit, Holladay uses a valuation-based (Based on Valuation / BOV) fee model tied to the 1997 Uniform Administrative Code Table 3-A rather than a published flat-dollar fee table — no separate commercial-only dollar figures are published.

Verified 2026-07-19 · Source

Requirements

  • New commercial or multi-family building construction — a distinct plan-submittal category on the city's own official Construction Submittal Requirements page, separate from 'Residential single family plans'
  • Online application only, submitted via the city's iWorq-based Building Permit Application portal (holladay.portal.iworq.net)
  • Building plans uploaded with the application — the city will not accept an application without accompanying plans
  • All commercial projects require a site-specific geotechnical report, per the city's official Building FAQs page: 'GEOTECHNICAL INFORMATION: All commercial projects require site specific geotechnical reports.'
  • Zoning compliance review per Holladay City Code § 13.08.100 (Building Permit Zoning Compliance Review)

Required documents

  • RequiredBuilding Permit Application (City of Holladay form / iWorq portal)Official application form listing property/owner/applicant/contractor information and an office-use fee breakdown (Building B.O.V. Fee, Electrical, Mechanical, Plumbing, Grading, 1% Building Surcharge, Plan Check Fees, Geologic Study, Park/Storm/Fire/Police Impact fees).
  • RequiredSite-Specific Geotechnical ReportPer the city's official Building FAQs page: 'All commercial projects require site specific geotechnical reports. The report shall include as a minimum: Field investigation; description of on site soil conditions; ground water elevation; soil preparation recommendations; allowable soil bearing; suitability of soils for proposed foundation system; liquefaction potential and recommended remedial action if required; recommended site class see IBC Table 1615.1.1.'
  • RequiredConstruction PlansComplete drawings reflecting the current adopted codes; the city directs applicants to its Inspection Guidelines & Codes page for the current code list and design factors (seismic, snow load, frost depth) before submittal.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (BOV)Determined per project valuation using the 1997 Uniform Administrative Code, Table 3-ACity of Holladay official Building FAQs page: 'Fees are based on the valuation of the project as per 1997 Uniform Administrative Code, Table 3-A.' No separate commercial-only dollar-figure table was located after checking the Building Division page, Construction Submittal Requirements page, FAQs page, and the Consolidated Fee Schedule PDF (which covers only elections/GRAMA/land-use/business-license/health-safety/impact fees, not building permits) — the same formula applies as the Residential Building Permit. The city directs applicants to call 801-527-3890 for a specific cost estimate.
1% Building Surcharge1% of the building fee, split 85%/15% between two accounting line itemsPer the city's official Building Permit application form fee breakdown; the same office-use fee line applies to any building permit type, commercial included.

Commercial Tenant Improvement Permit

Verified

Required for commercial tenant improvement work in Holladay. The city's own Construction Submittal Requirements page lists 'Commercial tenant improvement' as its own plan-submittal category, alongside 'New commercial or multi-family building,' under a 'Commercial and multi-family plans' heading. As with the Commercial Building Permit, fees are assessed using the same Based-on-Valuation (BOV) formula (1997 Uniform Administrative Code Table 3-A) rather than a published flat-dollar table — no tenant-improvement-specific dollar figures are published.

Verified 2026-07-19 · Source

Requirements

  • Commercial tenant improvement work — a distinct plan-submittal category on the city's own official Construction Submittal Requirements page, listed under 'Commercial and multi-family plans' alongside new commercial/multi-family construction
  • Online application only, submitted via the city's iWorq-based Building Permit Application portal (holladay.portal.iworq.net)
  • Building plans uploaded with the application — the city will not accept an application without accompanying plans
  • Zoning compliance review per Holladay City Code § 13.08.100 (Building Permit Zoning Compliance Review)

Required documents

  • RequiredBuilding Permit Application (City of Holladay form / iWorq portal)Submitted online only; the city does not accept paper or in-person-only applications without accompanying plans.
  • RequiredConstruction PlansComplete drawings reflecting the current adopted codes (2024 IBC, current statewide per Utah Code § 15A-2-103); no dedicated tenant-improvement checklist PDF is published separately from the general Construction Submittal Requirements page's category listing.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (BOV)Determined per project valuation using the 1997 Uniform Administrative Code, Table 3-ACity of Holladay official Building FAQs page: 'Fees are based on the valuation of the project as per 1997 Uniform Administrative Code, Table 3-A.' No tenant-improvement-specific dollar-figure table was located — the same formula applies as new commercial construction and residential permits. Contact the Building Division (801-527-3890) for a specific cost estimate.
1% Building Surcharge1% of the building fee, split 85%/15% between two accounting line itemsPer the city's official Building Permit application form fee breakdown.

Fire Sprinkler System Permit

Verified

Fire protection system permitting in Holladay is handled by Unified Fire Authority (UFA), a special fire district separate from the Holladay Building Division. Holladay City is listed among UFA's member communities. UFA requires a permit for installation or modification of any automatic fire sprinkler system, plus mandatory third-party peer review of the design (except for minor work below specific device-count thresholds). UFA itself charges no permit fee for this — confirmed against UFA's own FY26/27 Adopted Budget, which itemizes the Fire Prevention division's entire fee revenue as Hazardous Materials & Tank Permits, Firewatch Reimbursements, and Fireworks Permits only. The applicant instead pays a privately-set fee directly to one of UFA's approved third-party peer-review firms.

Verified 2026-07-20 · Source

Requirements

  • Permit required from the fire code official (UFA) before beginning work on any fire protection system, per International Fire Code Section 105.1.1 — beginning work before permit issuance and plan approval is done at the contractor's own risk
  • Fire Sprinkler System plans must be submitted to a UFA-approved Third Party Review company before final submittal to UFA (ufaplansubmittal@unifiedfire.org)
  • Third-party peer review required for automatic fire sprinkler system installation/modification, EXCEPT: installation of fire hydrants/underground supply lines, pre-engineered kitchen hood suppression systems, or installation/relocation of fewer than 20 sprinkler heads
  • System designer must be NICET Level III (Water-Based Fire Protection Systems Layout) or better, a Fire Protection Engineer, or a licensed engineer with specific additional fire protection training
  • Design and installation per the most recent NFPA 13, 13-R, or 13-D adopted by the State of Utah
  • Systems with 20 or more sprinkler heads (with limited 13-D/13-R exceptions) require off-site remote monitoring from an approved monitoring company

Required documents

  • RequiredFire Sprinkler System PlansWorking plans drawn to scale with a plan of each floor, manufacturer cut sheets, and hydraulic calculations, per UFA's Automatic Fire Sprinkler System Submittal guide. Plans must show the designer's NICET certification number and signature, or engineer stamp and signature.
  • RequiredThird Party Peer Review ReportTechnical opinion and report from a UFA-approved third-party review company (required unless the project qualifies for an exception), submitted along with the plans to UFA for final review and permitting.

Fee schedule

Fee typeAmountNotes
UFA Plan Review / Permit Fee (fire sprinkler systems)$0 — UFA charges no separate plan-review or permit feeConfirmed directly against UFA's FY26/27 Adopted Budget (unifiedfireut.gov/wp-content/uploads/ProposedBudget_040626.pdf), Fire Prevention division Revenue Summary, p.288: the division's complete FY27 fee revenue is broken out into exactly three categories — Hazardous Materials & Tank Permits ($370,000), Firewatch Reimbursements ($9,000), and Fireworks Permits ($6,000), totaling $385,000. No fire sprinkler or fire alarm permit fee line item exists anywhere in that revenue breakdown, confirming UFA itself does not bill a permit fee for these systems.
Third-Party Peer Review Fee (paid to private reviewer, not UFA)Not published — set independently by each approved third-party reviewerUFA's 'Peer Review for Fire Protection Systems' roster (unifiedfireut.gov/wp-content/uploads/Peer-Review-for-Fire-Protection-Systems-4.25.pdf) lists 10 UFA-approved private engineering firms/individuals (e.g., Protection Consultants Inc., Spectrum Engineers, Impact Fire Protection) and instructs applicants to 'submit plans to the company of your choice' — UFA does not set, collect, or publish this fee since it is a private commercial transaction between the applicant and the reviewer they select.

Sign Permit

Verified

Holladay does not publish a distinct sign permit application, checklist, or fee. The city's official Building FAQs page lists 'Signs (wall, monument, pole and billboard)' as its own itemized category under 'What Work Requires A Permit?', confirming a permit is required, but the Building Division's Construction Submittal Requirements page publishes no sign-specific plan-submittal category (only residential single-family, supplemental residential, and commercial/multi-family categories are listed), and neither the Consolidated Fee Schedule ordinance nor the Building Permit application form itemize a sign-specific fee line. Sign design, placement, size, and quantity standards are separately governed by Holladay City Code Chapter 13.82 (Signs), referenced via the city's official code index at codelibrary.amlegal.com/codes/holladayut — full ordinance text could not be rendered directly (codelibrary.amlegal.com returned HTTP 403 to automated fetch, consistent with the same block already noted for § 13.08.100 elsewhere in this file), so only the chapter's existence and title are asserted here, not its full text. Sign work is instead billed using the same general fee architecture already on the office-use fee breakdown: the Building Permit Fee (Based on Valuation, per the 1997 Uniform Administrative Code Table 3-A) for structural sign work (e.g., monument/pole sign foundations), and/or the Electrical Fee for illuminated signs, per project.

Verified 2026-07-21 · Source

Requirements

  • Erection or installation of a wall, monument, pole, or billboard sign — listed as its own 'Signs (wall, monument, pole and billboard)' category requiring a permit on the city's official Building FAQs page
  • Online application via the city's iWorq Building Permit Application portal (holladay.portal.iworq.net) — the city does not accept applications without accompanying plans
  • Design, placement, size, and quantity of the sign must conform to Holladay City Code Chapter 13.82 (Signs), referenced by the city's official AmLegal code index (full text not independently verified here due to a 403 response from automated fetch)
  • Illuminated or electrically-connected signs are also subject to the general electrical permit/inspection requirements applicable to any electrical work in the city

Required documents

  • RequiredBuilding Permit Application (City of Holladay form / iWorq portal)Submitted online only; the form's office-use fee breakdown has no distinct sign line item — sign work is billed under the existing Building B.O.V. and/or Electrical fee lines. No separate sign-specific application or checklist is published.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Based on Valuation (BOV)Determined per project valuation using the 1997 Uniform Administrative Code, Table 3-AApplies to any structural component of a sign installation (e.g., monument or pole sign foundations), using the same valuation-based formula as every other building permit type in Holladay. No sign-specific dollar figure is published. City of Holladay official Building FAQs page: 'Fees are based on the valuation of the project as per 1997 Uniform Administrative Code, Table 3-A.'
Electrical Fee (covers illuminated sign wiring, where applicable)Not publicly itemized — assessed per project at permit issuanceThe city's official Building Permit application form lists 'Electrical' as a distinct fee line in the office-use fee breakdown; illuminated-sign wiring is billed under this same line, per the same fee architecture used for EV chargers and solar PV wiring elsewhere in this file. No public dollar figure or percentage formula for this line was located on the Building Division, FAQs, Construction Submittal Requirements, or Consolidated Fee Schedule pages. Contact 801-527-3890 for a project-specific quote.

Change of Use Permit (Conditional Use Application) / Change of Occupancy

Verified

Unlike EV chargers, solar, and standalone signage, Holladay DOES publish a distinct, governing dollar figure for a change of use: the city's Consolidated Fee Schedule (Holladay City Code § 3.35.070, 'Conditional Use Permit Application') itemizes 'Change of use ... $100.00' as its own line item, separate from Residential use, Commercial/industrial, Home occupation, Conditional use amendment, and Mobile store line items in the same section — confirmed directly against the fee schedule PDF (cms3.revize.com/revize/cityofholladay/fee%20schedule.pdf), Section 3.35.070. This $100 fee applies where a proposed change of use requires Planning Commission conditional-use review and approval under Holladay City Code Title 13 (Land Use and Development), administered by the Planning and Zoning Division — a distinct process and department from the Building Division's building-permit review. Separately, the city's official Business Licensing page states that 'if you have a change of location to a new building or change of occupancy at a building, the proper building permits must be obtained and approved before the application for a business license may be obtained and granted' — meaning a change of occupancy independently triggers the standard Building Division commercial-building or tenant-improvement permit review (see those entries in this file) before a business license can issue. A further, separate $35 business-license fee ('New location transfer' per the fee schedule's General Business License Fee Schedule, § 3.35.110; called the 'Change of Location Form' fee on the Business Licensing page) applies to updating the business license record itself and is paid to Economic Development, not the Building or Planning Division.

Verified 2026-07-21 · Source

Requirements

  • Planning Commission conditional-use review and approval under Holladay City Code Title 13, where the proposed new use of a property is not permitted outright in the applicable zone — per the Consolidated Fee Schedule's 'Change of use' line item under § 3.35.070 (Conditional Use Permit Application)
  • Public notice mailed to surrounding neighbors and public comment heard at a Planning Commission meeting, per the city's official Planning and Zoning Division page; the Commission may approve with mitigating conditions or deny if anticipated detrimental effects cannot be mitigated to city standards
  • Separately and in addition: per the city's official Business Licensing page, any change of location to a new building or change of occupancy at a building requires the proper building permits (commercial building or tenant-improvement permit, reviewed by the Building Division) to be obtained and approved BEFORE a business license application can be granted
  • A business license 'New location transfer' (Change of Location Form) must also be filed with Economic Development to update the license record when a business changes location or occupancy — a separate administrative step from both the Planning Commission conditional-use review and the Building Division permit

Required documents

  • RequiredConditional Use Permit Application (Planning and Zoning Division)Filed with the Planning and Zoning Division (801-527-3890 / planning@holladayut.gov) for a proposed change of use requiring conditional-use approval under Title 13; the city directs applicants to contact the Planning Department to confirm the correct application before submitting, per the Planning Division's official FAQs page.
  • OptionalBuilding Permit Application (City of Holladay form / iWorq portal) — where occupancy/use change requires building workRequired separately per the Business Licensing page's statement that a change of occupancy at a building requires the proper building permits, approved before a business license can be granted; processed the same as the Commercial Building Permit or Commercial Tenant Improvement Permit entries in this file.
  • RequiredBusiness License 'New Location Transfer' / Change of Location FormFiled with Economic Development to update the business license record for the new location/occupancy; carries its own $35 fee, separate from any Planning or Building Division fee.

Fee schedule

Fee typeAmountNotes
Change of Use (Conditional Use Permit Application fee)$100.00Holladay City Code § 3.35.070 (Conditional Use Permit Application), Consolidated Fee Schedule, verbatim line item: 'Change of use ... 100.00' — confirmed by direct extraction of the fee schedule PDF (cms3.revize.com/revize/cityofholladay/fee%20schedule.pdf), a distinct row from 'Residential use' ($900 + $50/unit), 'Commercial, industrial' ($1,000 + $35/acre), 'Home occupation; planning commission approval' ($100), 'Conditional use amendment' ($250), and 'Mobile store' ($250) in the same section. This is a governing, verified dollar figure, not an inferred or estimated one.
Business License 'New Location Transfer' fee$35.00Holladay City Code § 3.35.110 (General Business License Fee Schedule), Consolidated Fee Schedule, verbatim line item: 'New location transfer ... 35.00.' Matches the $35 'Change of Location Form' fee referenced on the city's official Business Licensing page. Paid to Economic Development to update the business license record itself — separate from the Planning Commission's $100 Change of Use conditional-use fee and from any Building Division permit fee.
Building Permit Fee (where a change of occupancy independently triggers building-permit review)Determined per project valuation using the 1997 Uniform Administrative Code, Table 3-A — see Commercial Building Permit / Commercial Tenant Improvement Permit entries in this filePer the city's official Business Licensing page, a change of occupancy at a building requires 'the proper building permits' to be obtained and approved before a business license can be granted. No occupancy-change-specific dollar figure is separately published; the standard BOV formula used for any commercial building/TI permit applies.

Fire Alarm and Detection System Permit

Verified

Fire alarm system permitting in Holladay is handled by Unified Fire Authority (UFA), separate from the Holladay Building Division. UFA requires a plan submittal and permit for all new commercial fire alarm installations and for additions or modifications to existing systems, with mandatory third-party peer review for systems where more than five horns/strobes are added or relocated. UFA itself charges no permit fee for this — confirmed against UFA's own FY26/27 Adopted Budget, which itemizes the Fire Prevention division's entire fee revenue as Hazardous Materials & Tank Permits, Firewatch Reimbursements, and Fireworks Permits only. The applicant instead pays a privately-set fee directly to one of UFA's approved third-party peer-review firms.

Verified 2026-07-20 · Source

Requirements

  • Plan submittal and permit from UFA required for all new commercial fire alarm system installations and for existing system additions or modifications
  • Third-party peer review required where more than five (5) horns or strobes are added or relocated; plans must be submitted to a UFA-approved Third Party Review company first
  • System designer must be NICET Level III (Engineering Technician) or better, a Fire Protection Engineer, or a licensed engineer with specific additional fire protection training
  • Design and installation per the most recent NFPA 72 adopted by the State of Utah
  • Any structure (except one- and two-family dwellings) with 20 or more sprinkler heads must also have off-site monitoring of its fire alarm system

Required documents

  • RequiredFire Alarm and Detection System PlansWorking plans drawn to scale showing proposed use of each room, manufacturer cut sheets, horn/strobe candela settings, and battery calculations, per UFA's Fire Alarm and Detection System Submittal guide. Plans must show the designer's NICET certification number and signature, or engineer stamp and signature.
  • OptionalThird Party Peer Review ReportRequired where more than five horns/strobes are added or relocated; submitted to UFA along with corrected plans for final review and permitting.

Fee schedule

Fee typeAmountNotes
UFA Plan Review / Permit Fee (fire alarm systems)$0 — UFA charges no separate plan-review or permit feeConfirmed directly against UFA's FY26/27 Adopted Budget (unifiedfireut.gov/wp-content/uploads/ProposedBudget_040626.pdf), Fire Prevention division Revenue Summary, p.288: the division's complete FY27 fee revenue is broken out into exactly three categories — Hazardous Materials & Tank Permits ($370,000), Firewatch Reimbursements ($9,000), and Fireworks Permits ($6,000), totaling $385,000. No fire sprinkler or fire alarm permit fee line item exists anywhere in that revenue breakdown, confirming UFA itself does not bill a permit fee for these systems.
Third-Party Peer Review Fee (paid to private reviewer, not UFA)Not published — set independently by each approved third-party reviewerUFA's 'Peer Review for Fire Protection Systems' roster (unifiedfireut.gov/wp-content/uploads/Peer-Review-for-Fire-Protection-Systems-4.25.pdf) lists 10 UFA-approved private engineering firms/individuals and instructs applicants to 'submit plans to the company of your choice' — UFA does not set, collect, or publish this fee since it is a private commercial transaction between the applicant and the reviewer they select. Only required where more than five horns/strobes are added or relocated.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holladay building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)View current record →All versions →

Permalink: /utah/salt-lake-county/holladay/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.