Version history — Holladay, Utah
This is PermitBase’s own verified record for Holladay, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Holladay’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-07-22Superseded
- 2026-07-21Superseded
- 2026-07-20Superseded
- Holladay, Utah — Fire Sprinkler System Permit record added
- Holladay, Utah — Fire Alarm and Detection System Permit record added
- Holladay, Utah — Fire Sprinkler System Permit fee record added: UFA Plan Review / Permit Fee (fire sprinkler systems) ($0 — UFA charges no separate plan-review or permit fee)
- Holladay, Utah — Fire Sprinkler System Permit fee record added: Third-Party Peer Review Fee (paid to private reviewer, not UFA) (Not published — set independently by each approved third-party reviewer)
- Holladay, Utah — Fire Alarm and Detection System Permit fee record added: UFA Plan Review / Permit Fee (fire alarm systems) ($0 — UFA charges no separate plan-review or permit fee)
- Holladay, Utah — Fire Alarm and Detection System Permit fee record added: Third-Party Peer Review Fee (paid to private reviewer, not UFA) (Not published — set independently by each approved third-party reviewer)
- Holladay, Utah — EV Charger / EVSE Permit record added
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-07-07Superseded
- 2026-07-04Initial record — coverage of Holladay began