This is PermitBase’s published record for South Jordan as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
South Jordan building permits
South Jordan, Utah — as published 2026-06-30.
Reviewed 2026-06-30 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction and structural alterations in South Jordan. Separate flat-fee tiers apply for single-family detached and attached homes.
Verified 2026-06-30 · Source
Requirements
- New single-family detached or attached residential construction
- Additions and structural alterations
- Conversion of non-habitable to habitable space
- Any work requiring plan review under the adopted 2021 IRC/IBC
Required documents
- RequiredNew Residential Building Permit Submission ChecklistSouth Jordan's official checklist (PDF at sjc.utah.gov/DocumentCenter/View/4570/RESIDENTIAL-BUILDING-PERMIT-SUBMISSION-CHECKLIST) — complete construction drawings, site plan, energy compliance, and engineered truss plans required
- RequiredEnergy Compliance DocumentationREScheck or equivalent demonstrating compliance with the residential provisions of the 2021 IECC
- RequiredEngineered Truss PlansSealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single Family Detached — $0–$500,000 valuation | $3,398 | South Jordan FY 2025-2026 Fee Schedule (PRSFD), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF. Any person who commences work before obtaining a permit is subject to double the permit fee. |
| Single Family Detached — over $500,000 valuation | $4,329 | South Jordan FY 2025-2026 Fee Schedule (PRSFD) |
| Single Family Attached — $0–$500,000 valuation | $3,180 | South Jordan FY 2025-2026 Fee Schedule (PRSFA) |
| Single Family Attached — over $500,000 valuation | $4,052 | South Jordan FY 2025-2026 Fee Schedule (PRSFA) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
| Additional Plan Review Fee | $284 | South Jordan FY 2025-2026 Fee Schedule |
| Credit Card Processing Fee | 2.95% of fee charged | South Jordan FY 2025-2026 Fee Schedule |
| Work Without Permit | Double the applicable permit fee | South Jordan FY 2025-2026 Fee Schedule |
Residential Addition Permit
VerifiedRequired for additions to existing single-family residential structures in South Jordan.
Verified 2026-06-30 · Source
Requirements
- Additions to existing single-family homes
- Square footage increases requiring new foundation work
- Covered porches, sunrooms, or enclosed additions
Required documents
- RequiredConstruction PlansComplete drawings including floor plan, elevations, sections, and structural details for the addition
- RequiredSite PlanProperty survey showing setbacks and addition footprint
- RequiredEnergy ComplianceREScheck or equivalent for additions affecting the building envelope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Addition (PRAD) — $0–$500 valuation | $225 | South Jordan FY 2025-2026 Fee Schedule (PRAD), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Residential Addition (PRAD) — $501–$2,000 valuation | $699 | South Jordan FY 2025-2026 Fee Schedule (PRAD) |
| Residential Addition (PRAD) — $2,001–$40,000 valuation | $1,174 | South Jordan FY 2025-2026 Fee Schedule (PRAD) |
| Residential Addition (PRAD) — over $40,000 valuation | $2,293 | South Jordan FY 2025-2026 Fee Schedule (PRAD) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Electrical Permit
VerifiedRequired for electrical work including panel upgrades, new circuits, rewiring, and service changes in South Jordan. Governed by the 2023 National Electrical Code (NEC).
Verified 2026-06-30 · Source
Requirements
- New electrical circuits or wiring installations
- Electrical panel upgrades or replacements
- Service entrance changes
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
- RequiredPermit ApplicationApply via the CityView portal at cityview.southjordanutah.gov/CityViewPortal
- OptionalElectrical Plan / Single-Line DiagramPanel schedule and circuit layout for service upgrades and new construction
- OptionalContractor LicenseValid Utah electrical contractor license (DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Only Permit (PREL) | $260 | South Jordan FY 2025-2026 Fee Schedule (PREL), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Residential Power Meter Permit (PRPM) | $257 | South Jordan FY 2025-2026 Fee Schedule (PRPM) |
| Temporary Power Permit (PRTP) | $113 | South Jordan FY 2025-2026 Fee Schedule (PRTP) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Plumbing Permit
Required for plumbing installations, alterations, and repairs including water heaters, re-pipes, and fixture additions in South Jordan. Governed by the 2021 International Plumbing Code (IPC).
Reviewed 2026-06-30 · Source
Requirements
- New plumbing fixture installations (sinks, toilets, showers)
- Water heater installation or replacement
- Water line or sewer line replacement or extension
- Gas line installation or modification
Required documents
- RequiredPermit ApplicationApply via the CityView portal at cityview.southjordanutah.gov/CityViewPortal
- OptionalContractor LicenseValid Utah plumbing contractor license (DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Gas Permit (PRGS) — standalone gas line work | $333 | South Jordan FY 2025-2026 Fee Schedule (PRGS), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF. The FY 2025-2026 fee schedule does not list a separate standalone plumbing base fee; simple single-appliance work (water heater replacement) uses the Appliance permit (PRAP, $194). Contact South Jordan Building at (801) 446-4357 to confirm the correct permit type for larger plumbing projects. |
| Appliance Permit (PRAP) — single appliance replacement (e.g., water heater) | $194 | South Jordan FY 2025-2026 Fee Schedule (PRAP) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Mechanical / HVAC Permit
Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in South Jordan. Governed by the 2021 International Mechanical Code (IMC).
Reviewed 2026-06-30 · Source
Requirements
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace or gas appliance installation
Required documents
- RequiredPermit ApplicationApply via the CityView portal at cityview.southjordanutah.gov/CityViewPortal
- OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump
- OptionalContractor LicenseValid Utah HVAC contractor license (DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Appliance Permit (PRAP) — single appliance replacement (furnace, AC unit, etc.) | $194 | South Jordan FY 2025-2026 Fee Schedule (PRAP), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF. The fee schedule does not list a separate standalone mechanical base fee; single-appliance replacements use the Appliance permit. Contact South Jordan Building at (801) 446-4357 to confirm the correct permit type for larger HVAC projects. |
| Gas Permit (PRGS) — if gas line work is also required | $333 | South Jordan FY 2025-2026 Fee Schedule (PRGS) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Roofing Permit
VerifiedRequired for roof replacement, re-roofing, and structural roof repairs in South Jordan.
Verified 2026-06-30 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Overlay of new roofing over existing (where code allows)
- Structural roof repairs or modifications
- Changes to roofing material type
Required documents
- RequiredPermit ApplicationScope of work, square footage, and material specifications — apply via CityView portal
- OptionalContractor LicenseValid Utah roofing contractor license (DOPL) if not performed by homeowner
- RequiredRe-Roof Requirements Official StatementSouth Jordan requires this statement per the Building Department page — available from the department
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roof Permit (PRRF) — flat fee per permit | $193 | South Jordan FY 2025-2026 Fee Schedule (PRRF), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Solar Panel Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems in South Jordan.
Verified 2026-06-30 · Source
Requirements
- Rooftop solar panel installation
- Ground-mounted solar array installation
- Battery storage system installation
- Electrical service upgrade for solar interconnection
Required documents
- RequiredResidential Solar Photovoltaic System Plan Review RequirementsSouth Jordan's official solar checklist (linked from the building department page) — includes solar site plan, electrical single-line diagram, structural analysis, and equipment specs
- OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Solar (PRSO) — $0–$500 valuation | $367 | South Jordan FY 2025-2026 Fee Schedule (PRSO), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Residential Solar (PRSO) — $501–$2,000 valuation | $455 | South Jordan FY 2025-2026 Fee Schedule (PRSO) |
| Residential Solar (PRSO) — $2,001–$40,000 valuation | $543 | South Jordan FY 2025-2026 Fee Schedule (PRSO) |
| Residential Solar (PRSO) — $40,001–$100,000 valuation | $634 | South Jordan FY 2025-2026 Fee Schedule (PRSO) |
| Residential Solar (PRSO) — over $100,000 valuation | $1,019 | South Jordan FY 2025-2026 Fee Schedule (PRSO) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Deck Permit
VerifiedRequired for new deck construction, replacement, or structural modifications to existing decks in South Jordan.
Verified 2026-06-30 · Source
Requirements
- New deck construction attached to or detached from the house
- Decks higher than 30 inches above grade
- Structural modifications to existing decks
- Adding or replacing a deck ledger board
Required documents
- RequiredConstruction PlansFraming plan with beam/joist sizes, post locations, footing details, and ledger attachment per 2021 IRC R507
- RequiredSite PlanDeck location showing setbacks from property lines
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Deck Permit (PRDK) — $0–$500 valuation | $211 | South Jordan FY 2025-2026 Fee Schedule (PRDK), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Deck Permit (PRDK) — $501–$2,000 valuation | $557 | South Jordan FY 2025-2026 Fee Schedule (PRDK) |
| Deck Permit (PRDK) — over $2,000 valuation | $820 | South Jordan FY 2025-2026 Fee Schedule (PRDK) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Basement Finish Permit
VerifiedRequired for finishing or remodeling an unfinished basement in South Jordan, including framing, electrical, plumbing, and mechanical work.
Verified 2026-06-30 · Source
Requirements
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window per 2021 IRC)
- Adding a bathroom (requires separate plumbing permit)
- Electrical wiring for new rooms
- Any structural modifications
Required documents
- RequiredBasement Finish — Code RequirementsSouth Jordan's official checklist at sjc.utah.gov/DocumentCenter/View/4571/BASEMENT-FINISH-CODE--REQUIREMENTS — includes floor plan, electrical plan, mechanical plan
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Basement Permit (PRBS) — $0–$500 valuation | $474 | South Jordan FY 2025-2026 Fee Schedule (PRBS), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Residential Basement Permit (PRBS) — $501–$2,000 valuation | $678 | South Jordan FY 2025-2026 Fee Schedule (PRBS) |
| Residential Basement Permit (PRBS) — over $2,000 valuation | $882 | South Jordan FY 2025-2026 Fee Schedule (PRBS) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Accessory Dwelling Unit (ADU) Permit
Required for construction of accessory dwelling units on single-family residential properties in South Jordan. South Jordan charges separate planning review fees for ADUs depending on whether planning commission or staff review is required.
Reviewed 2026-06-30 · Source
Requirements
- ADU on a single-family residential lot
- Owner must comply with applicable South Jordan zoning requirements
- ADU must meet 2021 IRC including egress, energy, and plumbing requirements
Required documents
- RequiredBuilding PlansComplete construction drawings for the ADU including floor plan, elevations, and sections
- RequiredSite PlanPlot plan showing ADU location, setbacks, and parking
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Accessory Living Unit — Planning Commission Review | $860 | South Jordan FY 2025-2026 Fee Schedule, sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Accessory Living Unit — Staff Review | $196 | South Jordan FY 2025-2026 Fee Schedule |
| Building Permit for ADU structure | Determined by permit type — see Residential Addition (PRAD) or Detached Accessory (PRDA) rates | ADU building permits are assessed under the applicable building permit category. Contact South Jordan Building at (801) 446-4357 for a project-specific estimate. |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Fence Permit
Required for new fence installation in South Jordan. Height restrictions apply by zone. The FY 2025-2026 fee schedule does not list a specific residential fence permit fee — contact the building department.
Reviewed 2026-06-30 · Source
Requirements
- New fence construction
- Replacement of existing fence in a different location or height
- Fences over 6 feet may require City Council approval
Required documents
- RequiredSite PlanShowing fence location relative to property lines and easements
- RequiredFence DetailsHeight, material, and style specifications
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence permit fee | Not separately listed in the FY 2025-2026 Fee Schedule — contact South Jordan Building at (801) 446-4357 | The FY 2025-2026 fee schedule does not include a specific residential fence permit line item. City Council Review (Fence Height/Parking Reduction) is listed at $84 for above-code fence heights. Standard fence permits may be assessed under a general category or at no charge for compliant fences — confirm before applying. |
Water Heater Permit
VerifiedRequired for water heater installation, replacement, or conversion in South Jordan. Uses the Appliance permit (PRAP) for like-for-like replacements.
Verified 2026-06-30 · Source
Requirements
- Water heater replacement (including like-for-like swaps)
- New water heater installation
- Conversion from tank to tankless water heater
- Gas line modification for water heater (may also need Gas permit PRGS)
Required documents
- RequiredPermit ApplicationApply via the CityView portal at cityview.southjordanutah.gov/CityViewPortal
- OptionalContractor LicenseValid Utah plumbing contractor license (DOPL) for work not performed by the homeowner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Appliance Permit (PRAP) | $194 | South Jordan FY 2025-2026 Fee Schedule (PRAP), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF. Used for single-appliance replacements including water heaters. |
| Gas Permit (PRGS) — if gas line work is also required | $333 | South Jordan FY 2025-2026 Fee Schedule (PRGS) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Demolition Permit
VerifiedRequired for partial or complete demolition of structures in South Jordan. Pre-demolition approval from Utah DEQ and Salt Lake County Health Department is required before application.
Verified 2026-06-30 · Source
Requirements
- Complete demolition of any structure
- Partial demolition involving structural elements
- Pre-demolition approval from Utah DEQ and Salt Lake County Health Department (asbestos/hazmat)
- Utility disconnection by utility companies prior to demolition
Required documents
- RequiredDemolition ApplicationScope of demolition, structure details, and disposal plan — apply via CityView portal
- RequiredPre-Demolition DEQ Approval CertificateRequired per South Jordan Building Department — Utah DEQ pre-demolition approval for asbestos per NESHAP
- RequiredSalt Lake County Health Department Approval CertificateRequired per South Jordan Building Department
- RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected by the utility companies
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit (PRDE) | $46 | South Jordan FY 2025-2026 Fee Schedule (PRDE), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Swimming Pool Permit
VerifiedRequired for in-ground and above-ground swimming pool installation, hot tubs, and associated barriers in South Jordan. Governed by the 2021 International Swimming Pool and Spa Code (ISPSC).
Verified 2026-06-30 · Source
Requirements
- In-ground swimming pool construction
- Above-ground pools with depth over 24 inches
- Hot tubs and spas
- Pool barrier/fence installation (required for all pools)
Required documents
- RequiredPool PlansPool dimensions, depth, equipment location, and structural details
- RequiredSite PlanPool location with setbacks, equipment pad, and barrier/fence layout
- RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details per 2023 NEC Article 680
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Pool (PRPO) — $0–$500 valuation | $1,006 | South Jordan FY 2025-2026 Fee Schedule (PRPO), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Residential Pool (PRPO) — $501–$2,000 valuation | $1,086 | South Jordan FY 2025-2026 Fee Schedule (PRPO) |
| Residential Pool (PRPO) — $2,001–$40,000 valuation | $1,166 | South Jordan FY 2025-2026 Fee Schedule (PRPO) |
| Residential Pool (PRPO) — $40,001–$100,000 valuation | $1,166 | South Jordan FY 2025-2026 Fee Schedule (PRPO) |
| Residential Pool (PRPO) — over $100,000 valuation | $1,506 | South Jordan FY 2025-2026 Fee Schedule (PRPO) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Retaining Wall Permit
VerifiedRequired for retaining walls over 4 feet in height (measured from bottom of footing to top of wall) in South Jordan.
Verified 2026-06-30 · Source
Requirements
- Retaining walls over 4 feet in total height
- Any retaining wall supporting a surcharge (driveway, structure, slope above)
- Tiered walls where total retained height exceeds 4 feet
Required documents
- RequiredEngineered Wall PlansStamped structural drawings from a licensed Utah PE for walls over 4 feet
- RequiredSite PlanWall location relative to property lines, structures, and utilities
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Retaining Wall (PRRW) — $0–$500 valuation | $610 | South Jordan FY 2025-2026 Fee Schedule (PRRW), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Retaining Wall (PRRW) — over $500 valuation | $833 | South Jordan FY 2025-2026 Fee Schedule (PRRW) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Shed & Accessory Structure Permit
VerifiedRequired for detached garages, sheds, carports, and other accessory structures in South Jordan. Separate fee schedules apply for detached accessory structures and carports.
Verified 2026-06-30 · Source
Requirements
- Detached accessory structures over 200 square feet
- Detached garages and carports
- Accessory structures with electrical or plumbing
- Structures over 10 feet in height
Required documents
- RequiredDetached Accessory Building Permit Application RequirementsSouth Jordan's official checklist (PDF at sjc.utah.gov/DocumentCenter/View/3956/Detached-Accessory-Building-Permit-Application-Requirements) — includes building plans, site plan, and foundation details
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Detached Accessory (PRDA) — $0–$2,000 valuation | $1,002 | South Jordan FY 2025-2026 Fee Schedule (PRDA), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Detached Accessory (PRDA) — $2,001–$40,000 valuation | $1,331 | South Jordan FY 2025-2026 Fee Schedule (PRDA) |
| Detached Accessory (PRDA) — $40,001–$100,000 valuation | $1,389 | South Jordan FY 2025-2026 Fee Schedule (PRDA) |
| Detached Accessory (PRDA) — $100,001–$500,000 valuation | $1,389 | South Jordan FY 2025-2026 Fee Schedule (PRDA) |
| Detached Accessory (PRDA) — over $500,000 valuation | $1,749 | South Jordan FY 2025-2026 Fee Schedule (PRDA) |
| Carport (PRCP) — $0–$500 valuation | $650 | South Jordan FY 2025-2026 Fee Schedule (PRCP) |
| Carport (PRCP) — $501–$2,000 valuation | $692 | South Jordan FY 2025-2026 Fee Schedule (PRCP) |
| Carport (PRCP) — $2,001–$40,000 valuation | $735 | South Jordan FY 2025-2026 Fee Schedule (PRCP) |
| Carport (PRCP) — over $40,000 valuation | $801 | South Jordan FY 2025-2026 Fee Schedule (PRCP) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.