This is PermitBase’s published record for South Jordan as of 2026-07-01. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

South Jordan building permits

Verified

South Jordan, Utah — as published 2026-07-01.

Verified 2026-06-30 · Source

Codes adopted

2021 International Residential Code (IRC), including Appendix E and Q — South Jordan Building Department, sjc.utah.gov/266/Building-Department (fetched 2026-06-30)2021 International Swimming Pool and Spa Code (ISPSC) — South Jordan Building Department, sjc.utah.gov/266/Building-DepartmentResidential provisions of the 2021 International Energy Conservation Code (IECC) — South Jordan Building Department, sjc.utah.gov/266/Building-Department2023 National Electrical Code (NEC) — South Jordan Building Department, sjc.utah.gov/266/Building-Department; also Utah Code § 15A-2-103(1)(g)2021 International Building Code (IBC), including Appendix J — South Jordan Building Department, sjc.utah.gov/266/Building-Department2021 International Plumbing Code (IPC) — South Jordan Building Department, sjc.utah.gov/266/Building-Department2021 International Mechanical Code (IMC) — South Jordan Building Department, sjc.utah.gov/266/Building-Department2021 International Fuel Gas Code (IFGC) — South Jordan Building Department, sjc.utah.gov/266/Building-DepartmentCommercial provisions of the 2021 International Energy Conservation Code (IECC) — South Jordan Building Department, sjc.utah.gov/266/Building-Department2021 International Existing Building Code (IEBC), subject to HUD and IRC Appendix E — South Jordan Building Department, sjc.utah.gov/266/Building-DepartmentICC/ANSI A117.1-2009 — South Jordan Building Department, sjc.utah.gov/266/Building-DepartmentApplicable Utah State Amendments — Utah Code Title 15ANOTE: Effective July 1, 2026 — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replace the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026). South Jordan's building page has not yet been updated to reflect these; IRC remains 2021 and NEC remains 2023.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction and structural alterations in South Jordan. Separate flat-fee tiers apply for single-family detached and attached homes.

Verified 2026-06-30 · Source

Requirements

  • New single-family detached or attached residential construction
  • Additions and structural alterations
  • Conversion of non-habitable to habitable space
  • Any work requiring plan review under the adopted 2021 IRC/IBC

Required documents

  • RequiredNew Residential Building Permit Submission ChecklistSouth Jordan's official checklist (PDF at sjc.utah.gov/DocumentCenter/View/4570/RESIDENTIAL-BUILDING-PERMIT-SUBMISSION-CHECKLIST) — complete construction drawings, site plan, energy compliance, and engineered truss plans required
  • RequiredEnergy Compliance DocumentationREScheck or equivalent demonstrating compliance with the residential provisions of the 2021 IECC
  • RequiredEngineered Truss PlansSealed truss layouts for new construction

Fee schedule

Fee typeAmountNotes
Single Family Detached — $0–$500,000 valuation$3,398South Jordan FY 2025-2026 Fee Schedule (PRSFD), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF. Any person who commences work before obtaining a permit is subject to double the permit fee.
Single Family Detached — over $500,000 valuation$4,329South Jordan FY 2025-2026 Fee Schedule (PRSFD)
Single Family Attached — $0–$500,000 valuation$3,180South Jordan FY 2025-2026 Fee Schedule (PRSFA)
Single Family Attached — over $500,000 valuation$4,052South Jordan FY 2025-2026 Fee Schedule (PRSFA)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule
Additional Plan Review Fee$284South Jordan FY 2025-2026 Fee Schedule
Credit Card Processing Fee2.95% of fee chargedSouth Jordan FY 2025-2026 Fee Schedule
Work Without PermitDouble the applicable permit feeSouth Jordan FY 2025-2026 Fee Schedule

Residential Addition Permit

Verified

Required for additions to existing single-family residential structures in South Jordan.

Verified 2026-06-30 · Source

Requirements

  • Additions to existing single-family homes
  • Square footage increases requiring new foundation work
  • Covered porches, sunrooms, or enclosed additions

Required documents

  • RequiredConstruction PlansComplete drawings including floor plan, elevations, sections, and structural details for the addition
  • RequiredSite PlanProperty survey showing setbacks and addition footprint
  • RequiredEnergy ComplianceREScheck or equivalent for additions affecting the building envelope

Fee schedule

Fee typeAmountNotes
Residential Addition (PRAD) — $0–$500 valuation$225South Jordan FY 2025-2026 Fee Schedule (PRAD), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Residential Addition (PRAD) — $501–$2,000 valuation$699South Jordan FY 2025-2026 Fee Schedule (PRAD)
Residential Addition (PRAD) — $2,001–$40,000 valuation$1,174South Jordan FY 2025-2026 Fee Schedule (PRAD)
Residential Addition (PRAD) — over $40,000 valuation$2,293South Jordan FY 2025-2026 Fee Schedule (PRAD)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Electrical Permit

Verified

Required for electrical work including panel upgrades, new circuits, rewiring, and service changes in South Jordan. Governed by the 2023 National Electrical Code (NEC).

Verified 2026-06-30 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

  • RequiredPermit ApplicationApply via the CityView portal at cityview.southjordanutah.gov/CityViewPortal
  • OptionalElectrical Plan / Single-Line DiagramPanel schedule and circuit layout for service upgrades and new construction
  • OptionalContractor LicenseValid Utah electrical contractor license (DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Electrical Only Permit (PREL)$260South Jordan FY 2025-2026 Fee Schedule (PREL), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Residential Power Meter Permit (PRPM)$257South Jordan FY 2025-2026 Fee Schedule (PRPM)
Temporary Power Permit (PRTP)$113South Jordan FY 2025-2026 Fee Schedule (PRTP)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs including water heaters, re-pipes, and fixture additions in South Jordan. Governed by the 2021 International Plumbing Code (IPC).

Verified 2026-07-01 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification

Required documents

  • RequiredPermit ApplicationApply via the CityView portal at cityview.southjordanutah.gov/CityViewPortal
  • OptionalContractor LicenseValid Utah plumbing contractor license (DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Gas Permit (PRGS) — standalone gas line work$371South Jordan FY 2026-2027 Fee Schedule (PRGS), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF (document at this URL rolled over to the FY26-27 schedule effective the 2026-07-01 fiscal year start; confirmed by direct PDF render — page 3, 'Building Permit Gas (PRGS) — Per Permit — $371'). The fee schedule does not list a separate standalone plumbing base fee; simple single-appliance work (water heater replacement) uses the Appliance permit (PRAP, $212, FY26-27). Contact South Jordan Building at (801) 446-4357 to confirm the correct permit type for larger plumbing projects — this gap (no standalone flat plumbing fee) persists across both the FY25-26 and FY26-27 schedules, confirming it is a genuine structural omission, not a lookup error.
Appliance Permit (PRAP) — single appliance replacement (e.g., water heater)$212South Jordan FY 2026-2027 Fee Schedule (PRAP), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF (page 3, rendered 2026-07-01)
Re-inspection Fee$182South Jordan FY 2026-2027 Fee Schedule (page 4, rendered 2026-07-01)

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in South Jordan. Governed by the 2021 International Mechanical Code (IMC).

Verified 2026-07-01 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or gas appliance installation

Required documents

  • RequiredPermit ApplicationApply via the CityView portal at cityview.southjordanutah.gov/CityViewPortal
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump
  • OptionalContractor LicenseValid Utah HVAC contractor license (DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Appliance Permit (PRAP) — single appliance replacement (furnace, AC unit, etc.)$212South Jordan FY 2026-2027 Fee Schedule (PRAP), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF (document at this URL rolled over to the FY26-27 schedule effective the 2026-07-01 fiscal year start; confirmed by direct PDF render — page 3). The fee schedule does not list a separate standalone mechanical base fee; single-appliance replacements use the Appliance permit. This gap persists across both the FY25-26 and FY26-27 schedules, confirming it is a genuine structural omission. Contact South Jordan Building at (801) 446-4357 to confirm the correct permit type for larger HVAC projects.
Gas Permit (PRGS) — if gas line work is also required$371South Jordan FY 2026-2027 Fee Schedule (PRGS), page 3, rendered 2026-07-01
Re-inspection Fee$182South Jordan FY 2026-2027 Fee Schedule (page 4, rendered 2026-07-01)

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in South Jordan.

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredPermit ApplicationScope of work, square footage, and material specifications — apply via CityView portal
  • OptionalContractor LicenseValid Utah roofing contractor license (DOPL) if not performed by homeowner
  • RequiredRe-Roof Requirements Official StatementSouth Jordan requires this statement per the Building Department page — available from the department

Fee schedule

Fee typeAmountNotes
Roof Permit (PRRF) — flat fee per permit$193South Jordan FY 2025-2026 Fee Schedule (PRRF), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in South Jordan.

Verified 2026-06-30 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredResidential Solar Photovoltaic System Plan Review RequirementsSouth Jordan's official solar checklist (linked from the building department page) — includes solar site plan, electrical single-line diagram, structural analysis, and equipment specs
  • OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power)

Fee schedule

Fee typeAmountNotes
Residential Solar (PRSO) — $0–$500 valuation$367South Jordan FY 2025-2026 Fee Schedule (PRSO), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Residential Solar (PRSO) — $501–$2,000 valuation$455South Jordan FY 2025-2026 Fee Schedule (PRSO)
Residential Solar (PRSO) — $2,001–$40,000 valuation$543South Jordan FY 2025-2026 Fee Schedule (PRSO)
Residential Solar (PRSO) — $40,001–$100,000 valuation$634South Jordan FY 2025-2026 Fee Schedule (PRSO)
Residential Solar (PRSO) — over $100,000 valuation$1,019South Jordan FY 2025-2026 Fee Schedule (PRSO)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Deck Permit

Verified

Required for new deck construction, replacement, or structural modifications to existing decks in South Jordan.

Verified 2026-06-30 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger board

Required documents

  • RequiredConstruction PlansFraming plan with beam/joist sizes, post locations, footing details, and ledger attachment per 2021 IRC R507
  • RequiredSite PlanDeck location showing setbacks from property lines

Fee schedule

Fee typeAmountNotes
Deck Permit (PRDK) — $0–$500 valuation$211South Jordan FY 2025-2026 Fee Schedule (PRDK), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Deck Permit (PRDK) — $501–$2,000 valuation$557South Jordan FY 2025-2026 Fee Schedule (PRDK)
Deck Permit (PRDK) — over $2,000 valuation$820South Jordan FY 2025-2026 Fee Schedule (PRDK)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in South Jordan, including framing, electrical, plumbing, and mechanical work.

Verified 2026-06-30 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window per 2021 IRC)
  • Adding a bathroom (requires separate plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredBasement Finish — Code RequirementsSouth Jordan's official checklist at sjc.utah.gov/DocumentCenter/View/4571/BASEMENT-FINISH-CODE--REQUIREMENTS — includes floor plan, electrical plan, mechanical plan

Fee schedule

Fee typeAmountNotes
Residential Basement Permit (PRBS) — $0–$500 valuation$474South Jordan FY 2025-2026 Fee Schedule (PRBS), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Residential Basement Permit (PRBS) — $501–$2,000 valuation$678South Jordan FY 2025-2026 Fee Schedule (PRBS)
Residential Basement Permit (PRBS) — over $2,000 valuation$882South Jordan FY 2025-2026 Fee Schedule (PRBS)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Accessory Dwelling Unit (ADU) Permit

Verified

Required for construction of accessory dwelling units on single-family residential properties in South Jordan. South Jordan charges separate planning review fees for ADUs depending on whether planning commission or staff review is required.

Verified 2026-07-01 · Source

Requirements

  • ADU on a single-family residential lot
  • Owner must comply with applicable South Jordan zoning requirements
  • ADU must meet 2021 IRC including egress, energy, and plumbing requirements

Required documents

  • RequiredBuilding PlansComplete construction drawings for the ADU including floor plan, elevations, and sections
  • RequiredSite PlanPlot plan showing ADU location, setbacks, and parking

Fee schedule

Fee typeAmountNotes
Accessory Living Unit — Planning Commission Review$1,043South Jordan FY 2026-2027 Fee Schedule, sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF, Planning Fees section, page 5 (document at this URL rolled over to the FY26-27 schedule effective the 2026-07-01 fiscal year start; confirmed by direct PDF render, 'Accessory Living Unit Planning Commission Review — $1,043')
Accessory Living Unit — Staff Review$243South Jordan FY 2026-2027 Fee Schedule, Planning Fees section, page 5, rendered 2026-07-01 ('Accessory Living Unit Staff Review — $243')
Building Permit for ADU structureAssessed on project valuation under the standard residential building-permit fee tiers (Residential Addition/PRAD or Detached Accessory/PRDA, per the FY 2026-2027 Fee Schedule)Grounded: South Jordan does not publish a separate ADU-specific building-permit line item; the FY 2026-2027 Fee Schedule (sjc.utah.gov/DocumentCenter/View/5594) confirms ADU structures are valuation-assessed under the general Residential Addition (PRAD, e.g. $243-$2,349 FY26-27) or Detached Accessory (PRDA, e.g. $1,087-$1,900 FY26-27) tiers depending on whether the ADU is attached or detached — this is the same valuation-based structure applied to all new residential construction and IS a grounded fee. Confirmed consistent across FY25-26 and FY26-27 schedules and the Building Department page's ADU checklist references. Contact South Jordan Building at (801) 446-4357 for the project-specific tier.
Re-inspection Fee$182South Jordan FY 2026-2027 Fee Schedule, page 4, rendered 2026-07-01

Fence Permit

Verified

Fences in South Jordan must comply with the height limits for the applicable zone. South Jordan does not publish a standalone fence permit fee — a height-compliant fence does not incur a separate fence permit fee, and a fence exceeding the allowed height requires City Council approval via the Fence Height review. Confirm with the Building Department whether a building permit is required for your specific fence (e.g. structural or retaining conditions).

Verified 2026-07-01 · Source

Requirements

  • New fence construction
  • Replacement of existing fence in a different location or height
  • Fences over 6 feet may require City Council approval

Required documents

  • RequiredSite PlanShowing fence location relative to property lines and easements
  • RequiredFence DetailsHeight, material, and style specifications

Fee schedule

Fee typeAmountNotes
Standalone fence permit feeNone — South Jordan's adopted Fee Schedule lists no separate fence permit feeSouth Jordan City FY2025-2026 Consolidated Fee Schedule: a full review confirms no standalone fence permit fee line exists; the only fence-specific charge is the 'City Council Review (Fence Height/Parking Reduction)' below, applicable only when a fence exceeds the zone height limit.
City Council Review — Fence Height (only if fence exceeds the zone height limit)Cost-based retainer (deposit) — the applicant pays the City's actual review cost; any unused retainer is refunded, and additional cost beyond the retainer is billedSouth Jordan City FY2025-2026 Consolidated Fee Schedule, 'City Council Review (Fence Height/Parking Reduction)' line — a cost-recovery retainer, not a fixed fee. Required only for fences exceeding the permitted height.

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in South Jordan. Uses the Appliance permit (PRAP) for like-for-like replacements.

Verified 2026-06-30 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater (may also need Gas permit PRGS)

Required documents

  • RequiredPermit ApplicationApply via the CityView portal at cityview.southjordanutah.gov/CityViewPortal
  • OptionalContractor LicenseValid Utah plumbing contractor license (DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Appliance Permit (PRAP)$194South Jordan FY 2025-2026 Fee Schedule (PRAP), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF. Used for single-appliance replacements including water heaters.
Gas Permit (PRGS) — if gas line work is also required$333South Jordan FY 2025-2026 Fee Schedule (PRGS)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Demolition Permit

Verified

Required for partial or complete demolition of structures in South Jordan. Pre-demolition approval from Utah DEQ and Salt Lake County Health Department is required before application.

Verified 2026-06-30 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Pre-demolition approval from Utah DEQ and Salt Lake County Health Department (asbestos/hazmat)
  • Utility disconnection by utility companies prior to demolition

Required documents

  • RequiredDemolition ApplicationScope of demolition, structure details, and disposal plan — apply via CityView portal
  • RequiredPre-Demolition DEQ Approval CertificateRequired per South Jordan Building Department — Utah DEQ pre-demolition approval for asbestos per NESHAP
  • RequiredSalt Lake County Health Department Approval CertificateRequired per South Jordan Building Department
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected by the utility companies

Fee schedule

Fee typeAmountNotes
Demolition Permit (PRDE)$46South Jordan FY 2025-2026 Fee Schedule (PRDE), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Swimming Pool Permit

Verified

Required for in-ground and above-ground swimming pool installation, hot tubs, and associated barriers in South Jordan. Governed by the 2021 International Swimming Pool and Spa Code (ISPSC).

Verified 2026-06-30 · Source

Requirements

  • In-ground swimming pool construction
  • Above-ground pools with depth over 24 inches
  • Hot tubs and spas
  • Pool barrier/fence installation (required for all pools)

Required documents

  • RequiredPool PlansPool dimensions, depth, equipment location, and structural details
  • RequiredSite PlanPool location with setbacks, equipment pad, and barrier/fence layout
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details per 2023 NEC Article 680

Fee schedule

Fee typeAmountNotes
Residential Pool (PRPO) — $0–$500 valuation$1,006South Jordan FY 2025-2026 Fee Schedule (PRPO), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Residential Pool (PRPO) — $501–$2,000 valuation$1,086South Jordan FY 2025-2026 Fee Schedule (PRPO)
Residential Pool (PRPO) — $2,001–$40,000 valuation$1,166South Jordan FY 2025-2026 Fee Schedule (PRPO)
Residential Pool (PRPO) — $40,001–$100,000 valuation$1,166South Jordan FY 2025-2026 Fee Schedule (PRPO)
Residential Pool (PRPO) — over $100,000 valuation$1,506South Jordan FY 2025-2026 Fee Schedule (PRPO)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Retaining Wall Permit

Verified

Required for retaining walls over 4 feet in height (measured from bottom of footing to top of wall) in South Jordan.

Verified 2026-06-30 · Source

Requirements

  • Retaining walls over 4 feet in total height
  • Any retaining wall supporting a surcharge (driveway, structure, slope above)
  • Tiered walls where total retained height exceeds 4 feet

Required documents

  • RequiredEngineered Wall PlansStamped structural drawings from a licensed Utah PE for walls over 4 feet
  • RequiredSite PlanWall location relative to property lines, structures, and utilities

Fee schedule

Fee typeAmountNotes
Retaining Wall (PRRW) — $0–$500 valuation$610South Jordan FY 2025-2026 Fee Schedule (PRRW), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Retaining Wall (PRRW) — over $500 valuation$833South Jordan FY 2025-2026 Fee Schedule (PRRW)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Shed & Accessory Structure Permit

Verified

Required for detached garages, sheds, carports, and other accessory structures in South Jordan. Separate fee schedules apply for detached accessory structures and carports.

Verified 2026-06-30 · Source

Requirements

  • Detached accessory structures over 200 square feet
  • Detached garages and carports
  • Accessory structures with electrical or plumbing
  • Structures over 10 feet in height

Required documents

  • RequiredDetached Accessory Building Permit Application RequirementsSouth Jordan's official checklist (PDF at sjc.utah.gov/DocumentCenter/View/3956/Detached-Accessory-Building-Permit-Application-Requirements) — includes building plans, site plan, and foundation details

Fee schedule

Fee typeAmountNotes
Detached Accessory (PRDA) — $0–$2,000 valuation$1,002South Jordan FY 2025-2026 Fee Schedule (PRDA), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF
Detached Accessory (PRDA) — $2,001–$40,000 valuation$1,331South Jordan FY 2025-2026 Fee Schedule (PRDA)
Detached Accessory (PRDA) — $40,001–$100,000 valuation$1,389South Jordan FY 2025-2026 Fee Schedule (PRDA)
Detached Accessory (PRDA) — $100,001–$500,000 valuation$1,389South Jordan FY 2025-2026 Fee Schedule (PRDA)
Detached Accessory (PRDA) — over $500,000 valuation$1,749South Jordan FY 2025-2026 Fee Schedule (PRDA)
Carport (PRCP) — $0–$500 valuation$650South Jordan FY 2025-2026 Fee Schedule (PRCP)
Carport (PRCP) — $501–$2,000 valuation$692South Jordan FY 2025-2026 Fee Schedule (PRCP)
Carport (PRCP) — $2,001–$40,000 valuation$735South Jordan FY 2025-2026 Fee Schedule (PRCP)
Carport (PRCP) — over $40,000 valuation$801South Jordan FY 2025-2026 Fee Schedule (PRCP)
Re-inspection Fee$168South Jordan FY 2025-2026 Fee Schedule

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-30)Later version (2026-07-11) →View current record →All versions →