Taylorsville building permits

Verified

Taylorsville, Utah — as published 2026-07-16.

Verified 2026-06-30 · Source

Codes adopted

2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026. Confirmed live on the Taylorsville Building Department page (taylorsvilleut.gov/government/building-department, re-fetched 2026-07-16), which itself now states the current statewide code table verbatim: '2024 I.B.C., 2021 I.R.C., 2024 I.P.C., 2024 I.M.C., 2024 I.F.G.C., 2024 I.E.C.C., 2023 N.E.C.' Supersedes the 2021 IBC, which governed through 6/30/2026.2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle — confirmed both by the live statute and by Taylorsville's own building page (re-fetched 2026-07-16, listing '2021 I.R.C.').2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). Supersedes the 2021 IPC, which governed through 6/30/2026.2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). Supersedes the 2021 IMC, which governed through 6/30/2026.2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). Supersedes the 2021 IFGC, which governed through 6/30/2026.2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026, confirmed live on the Taylorsville Building Department page (re-fetched 2026-07-16). ONE statewide edition — the statute does not split residential/commercial IECC editions. Supersedes the 2021 IECC, which governed through 6/30/2026.2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle statewide. CORRECTION (2026-07-20, supersedes the 2026-07-16 note below): the 07-16 edit claimed Taylorsville's page had been updated to 'correctly' list 2023 N.E.C. and that the prior 2020-NEC lag was resolved — that was wrong. The page genuinely contradicts itself and still does as of this re-check: a summary table near the top states the statewide-adopted codes verbatim ('2024 I.B.C., 2021 I.R.C., 2024 I.P.C., 2024 I.M.C., 2024 I.F.G.C., 2024 I.E.C.C., 2023 N.E.C.'), but the page's own FAQ section separately answers 'What codes and standards does the building department use?' with: 'Currently we are using the 2021 I-codes with 2017 A.N.S.I. 117.1 as the accessibility standard, and the 2020 National Electrical Code.' Confirmed via a 2026-07-08 Wayback snapshot (predating the 07-16 edit) already showing that exact FAQ text, and independently re-confirmed live 2026-07-20 — the page has not changed; the 07-16 edit simply picked one side of an internal contradiction and declared it resolved. Reported here as-is rather than guessing which statement the department actually enforces in practice.NOTE (2026-07-20, supersedes the 2026-07-16 corpus-staleness note below): the IBC/IRC/IPC/IMC/IFGC/IECC lines above match the page's top summary table verbatim, independently re-confirmed 2026-07-20. But that table is not the whole story — see the NEC line's correction above for the page's separate, contradicting FAQ answer, which claims the department is 'currently using' the 2021 I-codes generally (not just for NEC). Treat every 'current as of 7/1/2026' framing above as citing the summary table specifically, not as a claim that Taylorsville's practice has been independently confirmed to match it. The International Fire Code (IFC) is not adopted anywhere in §15A-2-103 and is not listed on Taylorsville's page either — that part of the original 07-16 note still holds.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and work requiring plan review in Taylorsville. Permit fees are valuation-based per the Taylorsville City Consolidated Fee Schedule. Valuation for new construction and additions is calculated using Taylorsville's published per-square-foot rates.

Verified 2026-06-30 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions or structural modifications to existing structures
  • Conversion of non-habitable space to habitable space
  • Any work requiring plan review under the adopted building codes

Required documents

  • RequiredBuilding Permit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, and structural details. See the Residential Plan Submittal Requirements form on the Information Forms page.
  • RequiredEnergy Code Compliance DocumentationREScheck or equivalent documentation demonstrating compliance with the adopted IECC
  • OptionalEngineered Truss PlansSealed truss layouts for new construction

Fee schedule

Fee typeAmountNotes
Building Permit — valuation under $2,000$24.00 for the first $500, plus $3.50 for each additional $100 or fraction thereof, to and including $2,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939)
Building Permit — valuation $2,000 to $25,000$76.50 for the first $2,000, plus $16.50 for each additional $1,000 or fraction thereof, to and including $25,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $25,000 to $50,000$456.00 for the first $25,000, plus $12.00 for each additional $1,000 or fraction thereof, to and including $50,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $50,000 to $100,000$765.00 for the first $50,000, plus $8.50 for each additional $1,000 or fraction thereof, to and including $100,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $100,000 to $500,000$1,181.00 for the first $100,000, plus $6.50 for each additional $1,000 or fraction thereof, to and including $500,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $500,000 to $1,000,000$3,781.00 for the first $500,000, plus $5.50 for each additional $1,000 or fraction thereof, to and including $1,000,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation over $1,000,000$6,531.00 for the first $1,000,000, plus $4.50 for each additional $1,000 or fraction thereofTaylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Residential Valuation Rate — Main Floor / Second Floor$88.03 per sq. ft.Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 — used to calculate project valuation before applying the permit fee tiers above
Residential Valuation Rate — Rough Basement$36.50 per sq. ft.Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Residential Valuation Rate — Finished Basement$15.00 per sq. ft.Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Residential Valuation Rate — Garage / Shed$34.18 per sq. ft.Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Residential Valuation Rate — Carport / Covered Deck$25.00 per sq. ft.Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Residential Valuation Rate — Deck$20.00 per sq. ft.Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Residential Valuation Rate — Converted Garage/Carport to Living Space$45.00 per sq. ft.Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026

Water Heater Permit

Verified

Required for water heater installation or replacement (standard tank and tankless) in Taylorsville. A flat-fee permit per the Taylorsville Consolidated Fee Schedule.

Verified 2026-06-30 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater

Required documents

  • RequiredPermit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice
  • OptionalEquipment SpecificationsManufacturer data sheet for the water heater (recommended for tankless or non-standard units)

Fee schedule

Fee typeAmountNotes
Hot Water Heater (Standard and Tankless) — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed under 'Flat Fee Permits per Residential Location'

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations and replacements in Taylorsville, including furnaces and air conditioners. A flat-fee permit per the Taylorsville Consolidated Fee Schedule.

Verified 2026-06-30 · Source

Requirements

  • Furnace or air conditioner installation or replacement
  • Heat pump installation
  • Evaporative cooler installation
  • Ductwork installation or major modification

Required documents

  • RequiredPermit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump

Fee schedule

Fee typeAmountNotes
HVAC (Furnace/Air Conditioner) — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed under 'Flat Fee Permits per Residential Location'

Electrical Service Permit

Verified

Required for electrical service changes, panel upgrades, and new electrical service installations in Taylorsville. The Consolidated Fee Schedule lists 'Electrical Service Charge' as a standalone flat-fee category and 'Temporary Power' separately. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the city's Consolidated Fee Schedule does not publish an EV-specific line item.

Verified 2026-06-30 · Source

Requirements

  • Electrical service entrance change or upgrade
  • Main panel replacement or upgrade
  • New electrical service installation
  • Temporary power installation during construction

Required documents

  • RequiredPermit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice
  • OptionalSingle-Line DiagramPanel schedule and service entrance diagram for upgrades

Fee schedule

Fee typeAmountNotes
Electrical Service Charge — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed under 'Flat Fee Permits per Residential Location'
Temporary Power — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026

Roofing Permit

Verified

Required for roof replacement and re-roofing in Taylorsville. A flat-fee permit per the Taylorsville Consolidated Fee Schedule. The fee schedule also lists 'Exterior Coverings' as a separate $60 flat-fee category (siding, stucco, and similar re-cladding projects).

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing
  • Structural roof repairs or modifications

Required documents

  • RequiredPermit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice; include scope of work, square footage, and material specifications
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Roofing — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed under 'Flat Fee Permits per Residential Location'

Fence Permit

Verified

Required for new fence installation and fence replacement in Taylorsville. A flat-fee permit per the Taylorsville Consolidated Fee Schedule.

Verified 2026-06-30 · Source

Requirements

  • New fence construction
  • Fence replacement that changes height, location, or material
  • Fences over 6 feet in height in any zone

Required documents

  • RequiredPermit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice
  • OptionalSite PlanPlot plan showing fence location relative to property lines and structures

Fee schedule

Fee typeAmountNotes
Fences — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed under 'Flat Fee Permits per Residential Location'

Demolition Permit

Verified

Required for partial or complete demolition of structures in Taylorsville. A flat-fee permit per the Taylorsville Consolidated Fee Schedule.

Verified 2026-06-30 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls

Required documents

  • RequiredPermit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice; include scope of demolition, structure details, and disposal plan
  • OptionalAsbestos / DAQ ClearanceUtah DAQ involvement required for structures that may contain asbestos-containing materials — contact Utah DEQ/DAQ before demolition
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition

Fee schedule

Fee typeAmountNotes
Demolition (Residential and Commercial) — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed as 'Demolition (Residential and Commercial)' under the Flat Fee Permits table. Note: the section heading reads 'Flat Fee Permits per Residential Location (Except Demolition)' — the demolition line applies to both residential and commercial regardless.

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Taylorsville. Per Taylorsville's official 'Solar P.V. Systems' submittal form (B-7), a P.V. array requires a standard Building Permit, and applicants must submit a valuation document (proposal/bid/contract) showing the value of the work — confirming the structural/PV installation is assessed the standard valuation-based building permit fee under the Taylorsville City Consolidated Fee Schedule. The electrical interconnection is a separate Electrical Service permit ($60 flat fee). No standalone solar/PV line item exists in the Consolidated Fee Schedule.

Verified 2026-07-01 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Electrical service change or upgrade for solar interconnection (Electrical Service permit required)

Required documents

  • RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways — download the Solar P.V. information form from taylorsvilleut.gov/government/community-development/information-forms
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • RequiredStructural AnalysisRoof load calculation confirming structure can support panels
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
  • OptionalInterconnection AgreementRocky Mountain Power utility approval for grid-tied systems

Fee schedule

Fee typeAmountNotes
Building Permit (structural/valuation-based)Valuation-based — see residential building permit fee schedule; valuation is based on the proposal/bid/contract value of the P.V. installation, per the required 'Valuation' submittal documentGrounded: Taylorsville 'Solar P.V. Systems' submittal form B-7 (Rev 7/9/20, taylorsvilleut.gov/home/showpublisheddocument/4610/637299084140100000) requires a standard Building Permit and a Valuation document (proposal/bid/contract) for the P.V. array; fee then applies per the Taylorsville City Consolidated Fee Schedule (Revised & Approved March 19, 2026) Valuation Based Building Permit Fees table. Confirmed by full-text search of the fee schedule: no standalone solar/PV line item exists — solar structural work is charged via the standard valuation-based building permit, which is a published, cited table (verified per grounding rule for valuation-based fees).
Electrical Service Charge — Flat Fee (for electrical interconnection)$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 — separate permit required for electrical service change or interconnection

Window & Door Replacement Permit

Verified

Required for replacement of windows and exterior doors in Taylorsville. A flat-fee permit per the Taylorsville Consolidated Fee Schedule.

Verified 2026-06-30 · Source

Requirements

  • Replacement of one or more windows or exterior doors
  • Structural modification associated with window or door opening (may also require a valuation-based building permit)

Required documents

  • RequiredPermit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice

Fee schedule

Fee typeAmountNotes
Replacing Windows & Doors — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed under 'Flat Fee Permits per Residential Location'

Gas Line Permit

Verified

Required for installation, modification, or extension of natural gas or propane piping in Taylorsville. A flat-fee permit per the Taylorsville Consolidated Fee Schedule.

Verified 2026-06-30 · Source

Requirements

  • New gas line installation to an appliance
  • Extending or relocating existing gas piping
  • Adding a gas stub for future appliance (BBQ, fire pit, etc.)

Required documents

  • RequiredPermit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice
  • OptionalGas Piping PlanPipe routing, sizing based on BTU load, and material specifications

Fee schedule

Fee typeAmountNotes
Gas Line — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed as 'Gas Line' under 'Flat Fee Permits per Residential Location'

Commercial Building Permit

Verified

Required for new commercial construction in Taylorsville. The building permit fee uses the same valuation-based table applied to all building permits; commercial project valuation is separately computed via the IBC 2008 Building Valuation Table (Square Foot Construction Costs) by occupancy group and construction type, per the city's Consolidated Fee Schedule (Revised & Approved March 19, 2026).

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction
  • Design professional (architect) stamp required for spaces 3,000 sq ft or larger, per state law; engineer stamp for structural changes
  • Commercial Site Plan Checklist items: grading/drainage, utility plan, elevations, lighting/photometrics, landscape/irrigation; SWPPP required for disturbance of 1 acre or more
  • Compliance with the state-adopted IBC per Utah Code § 15A-2-103

Required documents

  • RequiredCode AnalysisPer Taylorsville Building Department form B-8, 'Commercial Plan Submittal Requirements for Existing Buildings.'
  • RequiredDimensioned Floor PlanPer form B-8.
  • RequiredDoor SchedulePer form B-8.
  • RequiredFire-Rated Separation DetailsPer form B-8.
  • RequiredDimensioned Restroom Plans (ADA / ANSI 117.1 Compliance)Per form B-8.
  • RequiredElectrical and Mechanical/Energy Compliance DetailsPer form B-8.
  • RequiredCommercial Site PlanDetailed site plan with grading/drainage, utility plan, elevations, lighting/photometrics, and landscape/irrigation; SWPPP required for disturbance of 1 acre or more, per the Commercial Site Plan Checklist.
  • OptionalDesign Professional Stamp (Architect/Engineer)Required for spaces 3,000 sq ft or larger per state law, or for structural changes.

Fee schedule

Fee typeAmountNotes
Building Permit — valuation under $2,000$24.00 for the first $500, plus $3.50 for each additional $100 or fraction thereof, to and including $2,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939). Same table used for all building permits, including commercial.
Building Permit — valuation $2,000 to $25,000$76.50 for the first $2,000, plus $16.50 for each additional $1,000 or fraction thereof, to and including $25,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $25,000 to $50,000$456.00 for the first $25,000, plus $12.00 for each additional $1,000 or fraction thereof, to and including $50,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $50,000 to $100,000$765.00 for the first $50,000, plus $8.50 for each additional $1,000 or fraction thereof, to and including $100,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $100,000 to $500,000$1,181.00 for the first $100,000, plus $6.50 for each additional $1,000 or fraction thereof, to and including $500,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $500,000 to $1,000,000$3,781.00 for the first $500,000, plus $5.50 for each additional $1,000 or fraction thereof, to and including $1,000,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation over $1,000,000$6,531.00 for the first $1,000,000, plus $4.50 for each additional $1,000 or fraction thereofTaylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Commercial Project Valuation MethodDetermined via the IBC 2008 Building Valuation Table (Square Foot Construction Costs) by occupancy group and construction type; shell-only buildings deduct 20%Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026, p.4 & p.16 Appendix: 'Valuation of New Construction/Additions for Commercial Projects — See Appendix (IBC 2008 Building Valuation Table).' Footnote: 'For shell only buildings deduct 20 percent.' No separate plan-review percentage fee is published for building permits (unlike neighboring West Jordan's 65% Non-Residential plan-review fee) — the valuation-based table above is the only published charge.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for commercial remodel and tenant-improvement work in existing buildings in Taylorsville, per Building Department form B-8, 'Commercial Plan Submittal Requirements for Existing Buildings.' The same valuation-based building-permit fee table used for new commercial construction applies — no separate tenant-improvement fee tier is published.

Verified 2026-07-19 · Source

Requirements

  • Commercial remodel or tenant-improvement scope in an existing building
  • Design professional (architect) stamp required for spaces 3,000 sq ft or larger per state law; engineer stamp for structural changes
  • Compliance with the state-adopted IBC per Utah Code § 15A-2-103

Required documents

  • RequiredCode AnalysisPer Taylorsville Building Department form B-8.
  • RequiredDimensioned Floor PlanPer form B-8.
  • RequiredDoor SchedulePer form B-8.
  • RequiredFire-Rated Separation DetailsPer form B-8.
  • RequiredDimensioned Restroom Plans (ADA / ANSI 117.1 Compliance)Per form B-8.
  • RequiredElectrical and Mechanical/Energy Compliance DetailsPer form B-8.
  • OptionalDesign Professional Stamp (Architect/Engineer)Required for spaces 3,000 sq ft or larger per state law, or for structural changes.

Fee schedule

Fee typeAmountNotes
Building Permit — valuation under $2,000$24.00 for the first $500, plus $3.50 for each additional $100 or fraction thereof, to and including $2,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939). Same table used for all building permits, including commercial.
Building Permit — valuation $2,000 to $25,000$76.50 for the first $2,000, plus $16.50 for each additional $1,000 or fraction thereof, to and including $25,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $25,000 to $50,000$456.00 for the first $25,000, plus $12.00 for each additional $1,000 or fraction thereof, to and including $50,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $50,000 to $100,000$765.00 for the first $50,000, plus $8.50 for each additional $1,000 or fraction thereof, to and including $100,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $100,000 to $500,000$1,181.00 for the first $100,000, plus $6.50 for each additional $1,000 or fraction thereof, to and including $500,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation $500,000 to $1,000,000$3,781.00 for the first $500,000, plus $5.50 for each additional $1,000 or fraction thereof, to and including $1,000,000Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026
Building Permit — valuation over $1,000,000$6,531.00 for the first $1,000,000, plus $4.50 for each additional $1,000 or fraction thereofTaylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026

Sign Permit

Verified

Required in Taylorsville for permanent and temporary signs per Taylorsville Municipal Code Chapter 13.26 (Signage and Outdoor Advertising), § 13.26.110 (Sign Permit Process). The Planning Department's Sign Review fee is $40.00; a separate flat Temporary Sign Permit fee is $25.00, per the Taylorsville City Consolidated Fee Schedule. A valuation-based Building Permit may additionally be required for signs with structural or electrical components.

Verified 2026-07-19 · Source

Requirements

  • Temporary signs: submit a plot plan showing the sign's relationship to buildings, property lines, setback from public rights of way, intersections, easements, and driveways
  • Temporary signs: state the length of the display period and the type of request (e.g., grand opening, special promotion)
  • Permanent signs containing electrical components, footings, engineering, or as otherwise required by the chief building official must receive a final inspection by an authorized building official confirming placement and construction conform to the permit application and applicable codes
  • New or existing signs installed or maintained without a required permit or required inspections must be removed or are subject to a penalty fee established by the city

Required documents

  • RequiredSign Permit ApplicationSubmitted to the Taylorsville Community Development Department per Municipal Code § 13.26.110
  • OptionalPlot Plan (temporary signs)Shows sign relationship to buildings, property lines, right-of-way setbacks, intersections, easements, and driveways, per § 13.26.110(A)

Fee schedule

Fee typeAmountNotes
Planning Department Sign Review$40.00Taylorsville City Consolidated Fee Schedule, 'Other Fees' under Planning — directly confirmed by live document fetch 2026-07-19 (taylorsvilleut.gov/home/showdocument?id=10939)
Temporary Sign Permit$25.00Taylorsville City Consolidated Fee Schedule — directly confirmed by live document fetch 2026-07-19 (taylorsvilleut.gov/home/showdocument?id=10939)

EV Charger / EVSE Permit

Verified

Taylorsville does not publish a distinct EV-charger/EVSE fee category. Installing electric vehicle charging equipment (a Level 2 EVSE circuit or, for a larger install, a service/panel change) is electrical work and falls under the city's Electrical Service Permit, billed at the same flat fee as other electrical service work on the Consolidated Fee Schedule. This is confirmed directly by Taylorsville's own electrical-permit entry, which explicitly states installing a Level 2 home EV charger requires this same Electrical Permit at the flat fee and that the city does not publish a separate EV-charger permit type or fee.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel capacity to serve the charger
  • Electrical work must comply with the National Electrical Code as adopted by Taylorsville

Required documents

  • RequiredPermit ApplicationSubmit via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice.
  • OptionalSingle-Line DiagramPanel schedule and circuit diagram for the EVSE circuit, required for service upgrades.

Fee schedule

Fee typeAmountNotes
Electrical Service Charge — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939) — listed under 'Flat Fee Permits per Residential Location.' No separate EV Charger line item exists in this schedule; EV/EVSE circuit work is billed under this same flat electrical service fee.
Temporary Power — Flat Fee$60.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026. Applies only if temporary power is needed during installation.

Fire Sprinkler & Fire Alarm Permit

Taylorsville does not have its own fire prevention bureau — fire protection system plan review and permitting is handled entirely by Unified Fire Authority (UFA), which is confirmed to serve the City of Taylorsville (unifiedfireut.gov/city/taylorsville-city/). Per International Fire Code § 105.1.1 as enforced by UFA, installing or modifying an automatic fire sprinkler system or a fire alarm/detection system requires a permit from the fire code official before work begins. UFA publishes separate submittal guides for sprinkler and alarm systems but processes both under the same Plan Reviews program and permit-required framework, so they are combined here as one permit category.

Reviewed 2026-07-22 · Source

Requirements

  • Installation or modification of an automatic fire sprinkler system (fire protection system) in a Taylorsville building
  • Installation or modification of a fire alarm and detection system and related equipment
  • Projects with 20 or more sprinkler heads, or 5 or more alarm/notification appliances, additionally require a third-party 'technical opinion and report' (peer review) of the plans per International Fire Code § 104.7.2, as enforced by UFA
  • Work must not begin before permit issuance and plan approval — per UFA, starting work early is at the contractor's own risk and no special allowances are granted

Required documents

  • RequiredFire Sprinkler Plan Submittal GuideUFA's official submittal guide for fire sprinkler system plans (unifiedfireut.gov/wp-content/uploads/Fire-Sprinkler-Plan-Submittal-Guide-1.pdf)
  • RequiredFire Alarm Plan Submittal GuideUFA's official submittal guide for fire alarm system plans (unifiedfireut.gov/wp-content/uploads/Fire-Alarm-Plan-Submittal-Guide-2.pdf)
  • OptionalThird-Party Peer Review ReportA 'technical opinion and report' from a qualified third-party reviewer, required for projects at or above the 20-sprinkler-head / 5-alarm-device thresholds; see UFA's 'Peer Review for Fire Protection Systems' guidance sheet
  • OptionalMaterial and Test Certificate — Aboveground/Underground PipingRequired for sprinkler system piping per UFA's published certificate forms
  • OptionalRecord of Completion — Fire Alarm SystemUFA's standard closeout form documenting the completed, tested fire alarm installation

Fee schedule

Fee typeAmountNotes
Fire Sprinkler / Fire Alarm Plan Review & PermitNot publicly publishedExhausted chase: UFA's Plan Reviews page (unifiedfireut.gov/prevention/plan-reviews/, fetched 2026-07-22) describes the permit and peer-review requirements but publishes no fee amount or fee-schedule table. UFA's '/prevention/fees/' path returns a 404, and UFA's 'Make a Payment' page (unifiedfireut.gov/make-a-payment/) lists no itemized fees. Taylorsville's own Consolidated Fee Schedule (Revised & Approved March 19, 2026, fetched 2026-07-22) — which covers city-issued permits — contains no fire-sprinkler or fire-alarm line item either, consistent with fire prevention permitting being handled entirely by UFA, a separate agency from the city. This matches the known corpus pattern for UFA-member jurisdictions: no public sprinkler/alarm fee schedule. A similarly-formatted fee table found via web search (utah.gov/pmn/files/600467.pdf, listing Fire Alarm/Sprinkler plan-review and permit fees) was deliberately NOT used here — that document's later pages are headed 'WEBER FIRE DISTRICT,' a different fire agency serving Weber County, not Salt Lake County/Taylorsville, so it would misattribute another agency's fees to UFA.

Change of Use Permit

Verified

Taylorsville does not publish a standalone 'change of use' permit product or fee. A change of use — a new or replacement business, or a different use type, occupying an existing commercial space — is processed through the city's standard Business License application (submitted via the EnerGov Self-Service portal), which routes to the Planning and Zoning Division for a land-use/zoning fit review, plus the Building Division, Police Department, Unified Fire Authority, and Salt Lake Valley Health Department for their respective sign-offs. If the new use requires physical tenant improvements, a separate valuation-based Building Permit and a Certificate of Occupancy are additionally required before business operations may begin — see the Commercial Tenant Improvement / Tenant Finish Permit entry.

Verified 2026-07-22 · Source

Requirements

  • A new business, or a business changing use type, occupying a previously different-use commercial space in Taylorsville
  • Planning and Zoning Division confirmation that the proposed use is permitted at the specific location and zone — contact (801) 963-5400 before signing a lease
  • Passing a Unified Fire Authority onsite inspection, required for all commercial businesses
  • If tenant improvements are involved: a separate Building Permit and Certificate of Occupancy prior to commencing business operations (see Commercial Tenant Improvement / Tenant Finish Permit)

Required documents

  • RequiredBusiness License ApplicationSubmitted online via the EnerGov Self-Service portal at portal.taylorsvilleut.gov/EnerGov_Prod/selfservice — this is the vehicle Taylorsville uses to process a change of use; there is no separate change-of-use application form.
  • OptionalZoning/Land-Use Pre-CheckRecommended contact with the Planning and Zoning Division (801-963-5400) before applying, to confirm the proposed use is permitted at the location and avoid delays.
  • OptionalBuilding Permit / Certificate of Occupancy DocumentationRequired only if tenant improvements are needed for the new use — see the Commercial Tenant Improvement / Tenant Finish Permit and Commercial Building Permit entries.

Fee schedule

Fee typeAmountNotes
Business License Administrative Fee (New)$100.00Taylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026 (taylorsvilleut.gov/home/showdocument?id=10939), fetched live 2026-07-22 — 'All new business license applications have a one-time $100.00 administration fee.' Taylorsville has no separate change-of-use fee line; a change of use is processed through this same business license application.
General Commercial Business License — New / Renewal$137.00 new / $78.00 renewalTaylorsville City Consolidated Fee Schedule, Revised & Approved March 19, 2026, Business Licensing table, fetched live 2026-07-22. Category-specific 'Disproportionate Fees' also apply on top of this base fee depending on business type (e.g., Restaurant $225.00, Retail under 7,000 sq ft $50.00) — see the full Business Licensing fee table.
Building Permit / Certificate of Occupancy (only if tenant improvements are required)Valuation-based — see the Commercial Tenant Improvement / Tenant Finish Permit and Commercial Building Permit fee tablesPer Taylorsville's Business Licensing guidance (taylorsvilleut.gov/government/business-licensing, 'Avoiding Common Problems' section): 'Tenant improvements to commercial spaces often require a building permit and certificate of occupancy prior to the commencement of business operations.' No change-of-use-specific fee tier exists beyond the standard valuation-based building-permit table already documented for tenant improvement.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Taylorsville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-01)View current record →All versions →

Permalink: /utah/salt-lake-county/taylorsville/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.