Version history — Taylorsville, Utah
This is PermitBase’s own verified record for Taylorsville, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Taylorsville’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-07-16Current record
- 2026-07-01Superseded
- Taylorsville, Utah — Solar Panel Permit fee record updated: Valuation-based — see residential building permit fee schedule; valuation calculated from project cost or square-footage rates → Valuation-based — see residential building permit fee schedule; valuation is based on the proposal/bid/contract value of the P.V. installation, per the required 'Valuation' submittal document
- 2026-06-30Superseded
- Taylorsville, Utah — fee schedule re-verified across 9 permit types
- Taylorsville, Utah — permit-type records re-verified (26 updates)
- 2026-06-27Initial record — coverage of Taylorsville began