This is PermitBase’s published record for Unincorporated Salt Lake County as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Salt Lake County building permits

Verified

Unincorporated Salt Lake County, Utah — as published 2026-06-30.

Verified 2026-07-01 · Source

Codes adopted

2021 International Building Code (IBC), including Appendices C and J — adopted by MSD effective July 1, 2023; source: msd.utah.gov/316/Codes-and-Design-Criteria2021 International Residential Code (IRC), including Appendix AQ (except residential energy Chapter 11) — adopted by MSD effective July 1, 20232021 International Plumbing Code (IPC) — adopted by MSD effective July 1, 20232021 International Mechanical Code (IMC) — adopted by MSD effective July 1, 20232021 International Fuel Gas Code (IFGC) — adopted by MSD effective July 1, 20232023 National Electrical Code (NEC) — adopted statewide and in force under Utah Code § 15A-2-103(1)(g); NOTE: MSD's own Codes and Design Criteria page still displays the 2020 NEC (not updated to the statewide edition) — the statewide 2023 NEC controls; confirm the enforced edition with MSD before starting electrical work2015 International Energy Conservation Code (IECC) — residential provisions only, as stated by MSD (IRC Chapter 11 residential energy provisions explicitly excluded from 2021 IRC adoption)2021 International Energy Conservation Code (IECC) — commercial provisions, as stated by MSD2021 International Existing Building Code (IEBC) — adopted by MSD effective July 1, 20232021 International Swimming Pool and Spa Code (ISPSC) — adopted by MSD effective July 1, 20232006 International Wildland-Urban Interface Code (IWUIC) — adopted per Utah Code Title 65A, Chapter 8

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, and structural alterations in unincorporated Salt Lake County. Permits are issued by the Greater Salt Lake Municipal Services District (MSD), which provides building permit and inspection services under contract with Salt Lake County. Apply through MSD CityWorks portal at msd.utah.gov/portal.

Verified 2026-06-30 · Source

Requirements

  • New single-family residential construction
  • Additions to existing residential structures
  • Structural modifications — load-bearing wall removal, foundation alterations
  • Conversion of unfinished space to habitable space
  • Any construction work with a valuation over $2,000 (minimum permit fee applies regardless)

Required documents

  • RequiredBuilding Permit ApplicationSubmit online through MSD CityWorks portal at msd.utah.gov/portal. Create an account, then apply under Building Permits.
  • RequiredConstruction Plans (full-size, stamped)Complete drawings to scale — site plan, floor plans, elevations, sections, structural details. MSD stamped plans must be on-site printed full size during construction.
  • RequiredSite PlanProperty survey or scaled drawing showing proposed footprint, setbacks from property lines, and existing structures.
  • RequiredEnergy Compliance DocumentationResidential projects must comply with the 2015 IECC residential provisions as adopted by MSD.
  • OptionalEngineered Truss PlansSealed truss layouts required for new construction with engineered trusses.

Fee schedule

Fee typeAmountNotes
Building Permit — minimum fee / valuation up to $2,000$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025, effective July 1, 2025. Source: msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule
Building Permit — valuation $2,001 to $25,000$76.50 for the first $2,000 plus $16.50 for each additional $1,000 or fraction thereof, to and including $25,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Example: $3,400 valuation = $76.50 + $33.00 = $109.50.
Building Permit — valuation $25,001 to $50,000$456.00 for the first $25,000 plus $12.00 for each additional $1,000 or fraction thereof, to and including $50,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Building Permit — valuation $50,001 to $100,000$765.00 for the first $50,000 plus $8.50 for each additional $1,000 or fraction thereof, to and including $100,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Building Permit — valuation $100,001 to $500,000$1,181.00 for the first $100,000 plus $6.50 for each additional $1,000 or fraction thereof, to and including $500,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Building Permit — valuation $500,001 to $1,000,000$3,781.00 for the first $500,000 plus $5.50 for each additional $1,000 or fraction thereof, to and including $1,000,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Building Permit — valuation over $1,000,001$6,531.00 for the first $1,000,000 plus $4.50 for each additional $1,000 or fraction thereofFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Plan Check Fee — residential construction40% of the building permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Includes up to 4 plan reviews; additional reviews charged at $80/hour.
Plan Check Fee — commercial construction65% of the building permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Applied to building permits and mechanical, plumbing, and electrical permits.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Electrical Permit

Verified

Required for electrical work in unincorporated Salt Lake County including new circuits, panel upgrades, service changes, and new construction wiring. Issued by MSD. MSD lists the 2020 NEC as the adopted edition; note that Utah Code § 15A-2-103(1)(g) adopts the 2023 NEC statewide — confirm enforced edition with MSD before starting work.

Verified 2026-06-30 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout.
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for work not performed by the homeowner.

Fee schedule

Fee typeAmountNotes
Mechanical, Plumbing & Electrical Permit — base fee$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection.
Fee per additional appliance or fixture$20.00 eachFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Applies to each additional appliance or fixture inspected by inspector already on site.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in unincorporated Salt Lake County including water heaters, fixture additions, and gas line work. Issued by MSD. Governed by the 2021 International Plumbing Code as adopted by MSD.

Verified 2026-06-30 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • OptionalPlumbing PlanRequired for larger projects — isometric or plan showing fixture locations, pipe sizes, and drainage.
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by the homeowner.

Fee schedule

Fee typeAmountNotes
Mechanical, Plumbing & Electrical Permit — base fee$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection.
Fee per additional appliance or fixture$20.00 eachFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in unincorporated Salt Lake County. Issued by MSD. Governed by the 2021 International Mechanical Code as adopted by MSD.

Verified 2026-06-30 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood-burning stove installation (may also require a gas permit)

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler.
  • OptionalMechanical PlanRequired for larger projects — equipment location, duct layout, sizing calculations.

Fee schedule

Fee typeAmountNotes
Mechanical, Plumbing & Electrical Permit — base fee$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection.
Fee per additional appliance or fixture$20.00 eachFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in unincorporated Salt Lake County. MSD uses flat fees by project type for re-roofing, not valuation-based fees.

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal; include scope of work, square footage, and material specifications.
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not performed by the homeowner.

Fee schedule

Fee typeAmountNotes
Reroofing — residential roof with sheathing$125.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Includes inspection of sheathing or decking.
Reroofing — residential roof without sheathing (shingles only)$75.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Shingles only; no decking or sheathing replacement.
Reroofing — small commercial (under $10,000 valuation)$150.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Reroofing — medium commercial ($10,000–$49,999 valuation)$175.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Reroofing — large commercial ($50,000+ valuation)$250.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in unincorporated Salt Lake County. MSD uses a base fee plus per-kW charge for residential and small commercial solar up to 20 kW.

Verified 2026-06-30 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways on the roof.
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter.
  • RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels.
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system.
  • OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power).

Fee schedule

Fee typeAmountNotes
Residential/Small Commercial Solar Permit — base fee (up to 20 kW)$100.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Does not include plan check fee.
Solar Permit — fee per kW (residential/small commercial up to 20 kW)$30.00 per kWFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Additional fee based on system size.
Commercial Solar over 20 kWValuation-based per standard building permit fee table (see building permit fee schedule)FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee is based on applicant's declared valuation as determined by Director or designee.
Battery Storage System$2.00 per batteryFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Assumes inspector is already on site.
Plan Check Fee (residential solar)40% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Solar permits typically require plan review.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Fence Permit

Verified

Required for fence installation in unincorporated Salt Lake County. Fence permit fees are valuation-based using the MSD supplemental construction valuation table ($20 per lineal foot for any fence type), applied to the standard building permit fee table.

Verified 2026-07-01 · Source

Requirements

  • New fence construction
  • Replacement of existing fence in a different location or at a different height
  • Fences in public right-of-way or easements require additional approvals

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal; include fence length, height, material, and location relative to property lines.
  • OptionalSite PlanShowing fence location relative to property lines and any easements.

Fee schedule

Fee typeAmountNotes
Fence PermitValuation-based; fence valuation = $20 per lineal foot (any type), applied to standard building permit fee table (minimum $70)Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Supplemental Construction Valuation Table, page 7 (rendered to PNG and read positionally to avoid column-bleed in text extraction): Fence (any type) = $20.00 per lineal foot, applied to the standard building-permit valuation fee table. This is a published, cited valuation-based fee — verified per the assessment rule (valuation-based fee with a published table = verified, not an estimate). Example: 100 lineal foot fence = $2,000 valuation = $70 minimum permit fee.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in unincorporated Salt Lake County. This is a plumbing permit for the most common standalone project type. Issued by MSD.

Verified 2026-06-30 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner.

Fee schedule

Fee typeAmountNotes
Plumbing Permit — base fee (covers water heater)$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Standard water heater replacement = $70 base for one system inspection.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Demolition Permit

Verified

Required for partial or complete demolition of structures in unincorporated Salt Lake County, including utility disconnection coordination and any required asbestos surveys. Issued by MSD; fee is valuation-based on declared demolition cost.

Verified 2026-07-01 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls
  • Demolition of structures with potential asbestos or lead paint (pre-1980 construction)

Required documents

  • RequiredBuilding Permit Application / Demolition ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal; include scope of demolition, structure details, and disposal plan.
  • OptionalAsbestos SurveyNESHAP asbestos inspection required for structures built before approximately 1980 — federal NESHAP regulations apply.
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition.

Fee schedule

Fee typeAmountNotes
Demolition PermitValuation-based per the standard building permit fee table; valuation = applicant's declared demolition cost (minimum $70)Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Building Permit Fees table, page 5 (rendered to PNG and read positionally): Demolition Permit fee is listed as "Varies" with footnote (d): "Permit fees for demolition and window/door replacement are based on declared valuation," applied to the standard building-permit valuation fee table (same schedule as residential-building-permit). This is a published, cited valuation-based fee — verified per the assessment rule.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Deck Permit

Verified

Required for new deck construction or structural modification of existing decks in unincorporated Salt Lake County. Permit fees are valuation-based using MSD's supplemental construction valuation of $22 per square foot for decks (any type).

Verified 2026-07-01 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • RequiredConstruction DrawingsFraming plan, footing details, ledger attachment method, and railing specifications.
  • RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure.

Fee schedule

Fee typeAmountNotes
Deck PermitValuation-based; deck valuation = $22 per square foot (any deck type), applied to standard building permit fee table (minimum $70)Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Supplemental Construction Valuation Table, page 7 (rendered to PNG and read positionally): Decks (any type) = $22.00 per square foot, applied to the standard building-permit valuation fee table. Published, cited valuation-based fee — verified per the assessment rule. Example: 200 sqft deck = $4,400 valuation → $76.50 + (2 × $16.50) = $109.50 permit fee.
Plan Check Fee — residential40% of the building permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in unincorporated Salt Lake County, including framing, electrical, plumbing, and mechanical work. Issued by MSD. Fee is valuation-based using MSD's supplemental valuation for Basement TI ($28 per square foot).

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (requires separate plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations.
  • RequiredElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations.
  • RequiredMechanical PlanHVAC supply/return for new rooms, combustion air for furnace room.
  • OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink.

Fee schedule

Fee typeAmountNotes
Basement Finish Permit (Basement TI)Valuation-based; Basement TI valuation = $28 per square foot, applied to standard building permit fee table (minimum $70)Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Supplemental Construction Valuation Table, page 7 (rendered to PNG and read positionally — the table separately lists "Basements – Finished" at $41.00/sqft and "Basement TI" at $28.00/sqft as distinct line items; this permit correctly cites the Basement TI figure for interior-finish/remodel work of an existing basement shell). Published, cited valuation-based fee — verified per the assessment rule. Example: 800 sqft basement = $22,400 valuation → $76.50 + (20 × $16.50) = $406.50 permit fee.
Plan Check Fee — residential40% of the building permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Trade Sub-Permits (electrical, plumbing, mechanical as applicable)$70 base per trade, plus $20 per additional appliance/fixtureFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Each trade (electrical, plumbing, mechanical) requires its own separate permit.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Salt Lake County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-27)Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/salt-lake-county/unincorporated-salt-lake/as-of/2026-06-30/

Snapshot date: 2026-06-30

Commit: 9e5cbba

Reproducible from PermitBase’s version-controlled dataset, commit 9e5cbba.