This is PermitBase’s published record for Unincorporated Salt Lake County as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Unincorporated Salt Lake County building permits
VerifiedUnincorporated Salt Lake County, Utah — as published 2026-06-30.
Verified 2026-07-01 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new residential construction, additions, and structural alterations in unincorporated Salt Lake County. Permits are issued by the Greater Salt Lake Municipal Services District (MSD), which provides building permit and inspection services under contract with Salt Lake County. Apply through MSD CityWorks portal at msd.utah.gov/portal.
Verified 2026-06-30 · Source
Requirements
- New single-family residential construction
- Additions to existing residential structures
- Structural modifications — load-bearing wall removal, foundation alterations
- Conversion of unfinished space to habitable space
- Any construction work with a valuation over $2,000 (minimum permit fee applies regardless)
Required documents
- RequiredBuilding Permit ApplicationSubmit online through MSD CityWorks portal at msd.utah.gov/portal. Create an account, then apply under Building Permits.
- RequiredConstruction Plans (full-size, stamped)Complete drawings to scale — site plan, floor plans, elevations, sections, structural details. MSD stamped plans must be on-site printed full size during construction.
- RequiredSite PlanProperty survey or scaled drawing showing proposed footprint, setbacks from property lines, and existing structures.
- RequiredEnergy Compliance DocumentationResidential projects must comply with the 2015 IECC residential provisions as adopted by MSD.
- OptionalEngineered Truss PlansSealed truss layouts required for new construction with engineered trusses.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit — minimum fee / valuation up to $2,000 | $70.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025, effective July 1, 2025. Source: msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule |
| Building Permit — valuation $2,001 to $25,000 | $76.50 for the first $2,000 plus $16.50 for each additional $1,000 or fraction thereof, to and including $25,000 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Example: $3,400 valuation = $76.50 + $33.00 = $109.50. |
| Building Permit — valuation $25,001 to $50,000 | $456.00 for the first $25,000 plus $12.00 for each additional $1,000 or fraction thereof, to and including $50,000 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Building Permit — valuation $50,001 to $100,000 | $765.00 for the first $50,000 plus $8.50 for each additional $1,000 or fraction thereof, to and including $100,000 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Building Permit — valuation $100,001 to $500,000 | $1,181.00 for the first $100,000 plus $6.50 for each additional $1,000 or fraction thereof, to and including $500,000 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Building Permit — valuation $500,001 to $1,000,000 | $3,781.00 for the first $500,000 plus $5.50 for each additional $1,000 or fraction thereof, to and including $1,000,000 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Building Permit — valuation over $1,000,001 | $6,531.00 for the first $1,000,000 plus $4.50 for each additional $1,000 or fraction thereof | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Plan Check Fee — residential construction | 40% of the building permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Includes up to 4 plan reviews; additional reviews charged at $80/hour. |
| Plan Check Fee — commercial construction | 65% of the building permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| State Surcharge | 1% of the permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Applied to building permits and mechanical, plumbing, and electrical permits. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Electrical Permit
VerifiedRequired for electrical work in unincorporated Salt Lake County including new circuits, panel upgrades, service changes, and new construction wiring. Issued by MSD. MSD lists the 2020 NEC as the adopted edition; note that Utah Code § 15A-2-103(1)(g) adopts the 2023 NEC statewide — confirm enforced edition with MSD before starting work.
Verified 2026-06-30 · Source
Requirements
- New electrical circuits or wiring installations
- Electrical panel upgrades or replacements
- Service entrance changes
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
- RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
- OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout.
- OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for work not performed by the homeowner.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical, Plumbing & Electrical Permit — base fee | $70.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection. |
| Fee per additional appliance or fixture | $20.00 each | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Applies to each additional appliance or fixture inspected by inspector already on site. |
| State Surcharge | 1% of the permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in unincorporated Salt Lake County including water heaters, fixture additions, and gas line work. Issued by MSD. Governed by the 2021 International Plumbing Code as adopted by MSD.
Verified 2026-06-30 · Source
Requirements
- New plumbing fixture installations (sinks, toilets, showers)
- Water heater installation or replacement
- Water line or sewer line replacement or extension
- Gas line installation or modification
- Backflow prevention device installation
Required documents
- RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
- OptionalPlumbing PlanRequired for larger projects — isometric or plan showing fixture locations, pipe sizes, and drainage.
- OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by the homeowner.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical, Plumbing & Electrical Permit — base fee | $70.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection. |
| Fee per additional appliance or fixture | $20.00 each | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| State Surcharge | 1% of the permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in unincorporated Salt Lake County. Issued by MSD. Governed by the 2021 International Mechanical Code as adopted by MSD.
Verified 2026-06-30 · Source
Requirements
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace or wood-burning stove installation (may also require a gas permit)
Required documents
- RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
- OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler.
- OptionalMechanical PlanRequired for larger projects — equipment location, duct layout, sizing calculations.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical, Plumbing & Electrical Permit — base fee | $70.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection. |
| Fee per additional appliance or fixture | $20.00 each | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| State Surcharge | 1% of the permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Roofing Permit
VerifiedRequired for roof replacement, re-roofing, and structural roof repairs in unincorporated Salt Lake County. MSD uses flat fees by project type for re-roofing, not valuation-based fees.
Verified 2026-06-30 · Source
Requirements
- Complete roof replacement (tear-off and re-roof)
- Overlay of new roofing over existing (where code allows)
- Structural roof repairs or modifications
- Changes to roofing material type
Required documents
- RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal; include scope of work, square footage, and material specifications.
- OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not performed by the homeowner.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Reroofing — residential roof with sheathing | $125.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Includes inspection of sheathing or decking. |
| Reroofing — residential roof without sheathing (shingles only) | $75.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Shingles only; no decking or sheathing replacement. |
| Reroofing — small commercial (under $10,000 valuation) | $150.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Reroofing — medium commercial ($10,000–$49,999 valuation) | $175.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Reroofing — large commercial ($50,000+ valuation) | $250.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Solar Panel Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems in unincorporated Salt Lake County. MSD uses a base fee plus per-kW charge for residential and small commercial solar up to 20 kW.
Verified 2026-06-30 · Source
Requirements
- Rooftop solar panel installation
- Ground-mounted solar array installation
- Battery storage system installation
- Electrical service upgrade for solar interconnection
Required documents
- RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
- RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways on the roof.
- RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter.
- RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels.
- RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system.
- OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential/Small Commercial Solar Permit — base fee (up to 20 kW) | $100.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Does not include plan check fee. |
| Solar Permit — fee per kW (residential/small commercial up to 20 kW) | $30.00 per kW | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Additional fee based on system size. |
| Commercial Solar over 20 kW | Valuation-based per standard building permit fee table (see building permit fee schedule) | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee is based on applicant's declared valuation as determined by Director or designee. |
| Battery Storage System | $2.00 per battery | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Assumes inspector is already on site. |
| Plan Check Fee (residential solar) | 40% of the permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Solar permits typically require plan review. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Fence Permit
VerifiedRequired for fence installation in unincorporated Salt Lake County. Fence permit fees are valuation-based using the MSD supplemental construction valuation table ($20 per lineal foot for any fence type), applied to the standard building permit fee table.
Verified 2026-07-01 · Source
Requirements
- New fence construction
- Replacement of existing fence in a different location or at a different height
- Fences in public right-of-way or easements require additional approvals
Required documents
- RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal; include fence length, height, material, and location relative to property lines.
- OptionalSite PlanShowing fence location relative to property lines and any easements.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence Permit | Valuation-based; fence valuation = $20 per lineal foot (any type), applied to standard building permit fee table (minimum $70) | Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Supplemental Construction Valuation Table, page 7 (rendered to PNG and read positionally to avoid column-bleed in text extraction): Fence (any type) = $20.00 per lineal foot, applied to the standard building-permit valuation fee table. This is a published, cited valuation-based fee — verified per the assessment rule (valuation-based fee with a published table = verified, not an estimate). Example: 100 lineal foot fence = $2,000 valuation = $70 minimum permit fee. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Water Heater Permit
VerifiedRequired for water heater installation, replacement, or conversion in unincorporated Salt Lake County. This is a plumbing permit for the most common standalone project type. Issued by MSD.
Verified 2026-06-30 · Source
Requirements
- Water heater replacement (including like-for-like swaps)
- New water heater installation
- Conversion from tank to tankless water heater
- Gas line modification for water heater
Required documents
- RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
- OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit — base fee (covers water heater) | $70.00 | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Standard water heater replacement = $70 base for one system inspection. |
| State Surcharge | 1% of the permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Demolition Permit
VerifiedRequired for partial or complete demolition of structures in unincorporated Salt Lake County, including utility disconnection coordination and any required asbestos surveys. Issued by MSD; fee is valuation-based on declared demolition cost.
Verified 2026-07-01 · Source
Requirements
- Complete demolition of any structure
- Partial demolition involving structural elements
- Removal of load-bearing walls
- Demolition of structures with potential asbestos or lead paint (pre-1980 construction)
Required documents
- RequiredBuilding Permit Application / Demolition ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal; include scope of demolition, structure details, and disposal plan.
- OptionalAsbestos SurveyNESHAP asbestos inspection required for structures built before approximately 1980 — federal NESHAP regulations apply.
- RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | Valuation-based per the standard building permit fee table; valuation = applicant's declared demolition cost (minimum $70) | Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Building Permit Fees table, page 5 (rendered to PNG and read positionally): Demolition Permit fee is listed as "Varies" with footnote (d): "Permit fees for demolition and window/door replacement are based on declared valuation," applied to the standard building-permit valuation fee table (same schedule as residential-building-permit). This is a published, cited valuation-based fee — verified per the assessment rule. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Deck Permit
VerifiedRequired for new deck construction or structural modification of existing decks in unincorporated Salt Lake County. Permit fees are valuation-based using MSD's supplemental construction valuation of $22 per square foot for decks (any type).
Verified 2026-07-01 · Source
Requirements
- New deck construction attached to or detached from the house
- Decks higher than 30 inches above grade
- Structural modifications to existing decks
- Adding or replacing a deck ledger
Required documents
- RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
- RequiredConstruction DrawingsFraming plan, footing details, ledger attachment method, and railing specifications.
- RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Deck Permit | Valuation-based; deck valuation = $22 per square foot (any deck type), applied to standard building permit fee table (minimum $70) | Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Supplemental Construction Valuation Table, page 7 (rendered to PNG and read positionally): Decks (any type) = $22.00 per square foot, applied to the standard building-permit valuation fee table. Published, cited valuation-based fee — verified per the assessment rule. Example: 200 sqft deck = $4,400 valuation → $76.50 + (2 × $16.50) = $109.50 permit fee. |
| Plan Check Fee — residential | 40% of the building permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Basement Finish Permit
VerifiedRequired for finishing or remodeling an unfinished basement in unincorporated Salt Lake County, including framing, electrical, plumbing, and mechanical work. Issued by MSD. Fee is valuation-based using MSD's supplemental valuation for Basement TI ($28 per square foot).
Verified 2026-07-01 · Source
Requirements
- Framing walls in an unfinished basement
- Adding a bedroom (requires egress window)
- Adding a bathroom (requires separate plumbing permit)
- Electrical wiring for new rooms
- Any structural modifications
Required documents
- RequiredFloor PlanLayout showing room sizes, egress windows, and door locations.
- RequiredElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations.
- RequiredMechanical PlanHVAC supply/return for new rooms, combustion air for furnace room.
- OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Basement Finish Permit (Basement TI) | Valuation-based; Basement TI valuation = $28 per square foot, applied to standard building permit fee table (minimum $70) | Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Supplemental Construction Valuation Table, page 7 (rendered to PNG and read positionally — the table separately lists "Basements – Finished" at $41.00/sqft and "Basement TI" at $28.00/sqft as distinct line items; this permit correctly cites the Basement TI figure for interior-finish/remodel work of an existing basement shell). Published, cited valuation-based fee — verified per the assessment rule. Example: 800 sqft basement = $22,400 valuation → $76.50 + (20 × $16.50) = $406.50 permit fee. |
| Plan Check Fee — residential | 40% of the building permit fee | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
| Trade Sub-Permits (electrical, plumbing, mechanical as applicable) | $70 base per trade, plus $20 per additional appliance/fixture | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Each trade (electrical, plumbing, mechanical) requires its own separate permit. |
| Re-Inspection Fee | $50.00 per occurrence | FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Salt Lake County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.