Codes adopted

2024 International Building Code (IBC), including Appendices C and J — governs per Utah Code §15A-2-103(1)(a) (https://le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), in force statewide since 7/1/2026 and binding on counties under §15A-1-204. MSD's own Codes and Design Criteria page still lists the 2021 IBC (incl. Appendices C & J) adopted effective July 1, 2023 — live-checked 2026-07-16, MSD's own page has not been updated to the current statewide edition.2021 International Residential Code (IRC), including Appendix AQ (except residential energy Chapter 11) — governs per Utah Code §15A-2-103(1)(b)/(c); this edition is UNCHANGED from the prior code cycle. MSD's own page lists the same 2021 IRC + Appendix AQ exclusion, adopted effective July 1, 2023 — live-checked 2026-07-16, consistent with the current statute on the base edition.2024 International Plumbing Code (IPC) — governs per Utah Code §15A-2-103(1)(d). MSD's own page still lists the 2021 IPC, adopted effective July 1, 2023 — live-checked 2026-07-16, lags the current statewide edition.2024 International Mechanical Code (IMC) — governs per Utah Code §15A-2-103(1)(e). MSD's own page still lists the 2021 IMC, adopted effective July 1, 2023 — live-checked 2026-07-16, lags the current statewide edition.2024 International Fuel Gas Code (IFGC) — governs per Utah Code §15A-2-103(1)(f). MSD's own page still lists the 2021 IFGC, adopted effective July 1, 2023 — live-checked 2026-07-16, lags the current statewide edition.2023 National Electrical Code (NEC) — governs per Utah Code §15A-2-103(1)(g); this edition is UNCHANGED from the prior code cycle. MSD's own Codes and Design Criteria page still displays the 2020 NEC — live-checked 2026-07-16, not updated to the statewide edition; confirm the enforced edition with MSD before starting electrical work.2024 International Energy Conservation Code (IECC) — one code, no residential/commercial split, per Utah Code §15A-2-103(1)(h). MSD's own page still splits it — 2015 IECC residential (IRC Chapter 11 residential energy provisions explicitly excluded from the 2021 IRC adoption) and 2021 IECC commercial — live-checked 2026-07-16, both lag the current statewide edition; the residential/commercial split itself is preserved here as MSD-published history, not carried into the governing statutory citation.2024 International Existing Building Code (IEBC) — governs per Utah Code §15A-2-103(1)(i). MSD's own page still lists the 2021 IEBC, adopted effective July 1, 2023 — live-checked 2026-07-16, lags the current statewide edition.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — governs per Utah Code §15A-2-103(1)(n). MSD's own page still lists the 2021 ISPSC, adopted effective July 1, 2023 — live-checked 2026-07-16, lags the current statewide edition.Modular Building Institute (MBI) Standards 1200 and 1205 — governs statewide per Utah Code §15A-2-103(1)(o). Not listed on MSD's own Codes and Design Criteria page — live-checked 2026-07-16.2006 International Wildland-Urban Interface Code (IWUIC) — adopted per Utah Code Title 65A, Chapter 8

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, and structural alterations in unincorporated Salt Lake County. Permits are issued by the Greater Salt Lake Municipal Services District (MSD), which provides building permit and inspection services under contract with Salt Lake County. Apply through MSD CityWorks portal at msd.utah.gov/portal.

Verified 2026-06-30 · Source

Requirements

  • New single-family residential construction
  • Additions to existing residential structures
  • Structural modifications — load-bearing wall removal, foundation alterations
  • Conversion of unfinished space to habitable space
  • Any construction work with a valuation over $2,000 (minimum permit fee applies regardless)

Required documents

  • RequiredBuilding Permit ApplicationSubmit online through MSD CityWorks portal at msd.utah.gov/portal. Create an account, then apply under Building Permits.
  • RequiredConstruction Plans (full-size, stamped)Complete drawings to scale — site plan, floor plans, elevations, sections, structural details. MSD stamped plans must be on-site printed full size during construction.
  • RequiredSite PlanProperty survey or scaled drawing showing proposed footprint, setbacks from property lines, and existing structures.
  • RequiredEnergy Compliance DocumentationResidential projects must comply with the 2024 IECC (one energy code, no residential/commercial split), governing per Utah Code §15A-2-103(1)(h); MSD's own page still lists the 2015 IECC residential provisions (live-checked 2026-07-16), lagging the current statewide edition.
  • OptionalEngineered Truss PlansSealed truss layouts required for new construction with engineered trusses.

Fee schedule

Fee typeAmountNotes
Building Permit — minimum fee / valuation up to $2,000$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025, effective July 1, 2025. Source: msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule
Building Permit — valuation $2,001 to $25,000$76.50 for the first $2,000 plus $16.50 for each additional $1,000 or fraction thereof, to and including $25,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Example: $3,400 valuation = $76.50 + $33.00 = $109.50.
Building Permit — valuation $25,001 to $50,000$456.00 for the first $25,000 plus $12.00 for each additional $1,000 or fraction thereof, to and including $50,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Building Permit — valuation $50,001 to $100,000$765.00 for the first $50,000 plus $8.50 for each additional $1,000 or fraction thereof, to and including $100,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Building Permit — valuation $100,001 to $500,000$1,181.00 for the first $100,000 plus $6.50 for each additional $1,000 or fraction thereof, to and including $500,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Building Permit — valuation $500,001 to $1,000,000$3,781.00 for the first $500,000 plus $5.50 for each additional $1,000 or fraction thereof, to and including $1,000,000FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Building Permit — valuation over $1,000,001$6,531.00 for the first $1,000,000 plus $4.50 for each additional $1,000 or fraction thereofFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Plan Check Fee — residential construction40% of the building permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Includes up to 4 plan reviews; additional reviews charged at $80/hour.
Plan Check Fee — commercial construction65% of the building permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Applied to building permits and mechanical, plumbing, and electrical permits.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Electrical Permit

Verified

Required for electrical work in unincorporated Salt Lake County including new circuits, panel upgrades, service changes, and new construction wiring. Issued by MSD. The 2023 NEC governs statewide per Utah Code § 15A-2-103(1)(g) (unchanged from the prior code cycle); MSD's own page still lists the 2020 NEC as the adopted edition (live-checked 2026-07-16) — confirm enforced edition with MSD before starting work. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; MSD's FY2025 Fee Schedule and Building Services page do not publish a distinct EV-specific permit category or fee line item (checked 2026-07-19).

Verified 2026-06-30 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout.
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for work not performed by the homeowner.

Fee schedule

Fee typeAmountNotes
Mechanical, Plumbing & Electrical Permit — base fee$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection.
Fee per additional appliance or fixture$20.00 eachFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Applies to each additional appliance or fixture inspected by inspector already on site.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in unincorporated Salt Lake County including water heaters, fixture additions, and gas line work. Issued by MSD. The 2024 IPC governs per Utah Code §15A-2-103(1)(d); MSD's own page still lists the 2021 IPC as adopted (live-checked 2026-07-16), lagging the current statewide edition.

Verified 2026-06-30 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • OptionalPlumbing PlanRequired for larger projects — isometric or plan showing fixture locations, pipe sizes, and drainage.
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by the homeowner.

Fee schedule

Fee typeAmountNotes
Mechanical, Plumbing & Electrical Permit — base fee$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection.
Fee per additional appliance or fixture$20.00 eachFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in unincorporated Salt Lake County. Issued by MSD. The 2024 IMC governs per Utah Code §15A-2-103(1)(e); MSD's own page still lists the 2021 IMC as adopted (live-checked 2026-07-16), lagging the current statewide edition.

Verified 2026-06-30 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood-burning stove installation (may also require a gas permit)

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler.
  • OptionalMechanical PlanRequired for larger projects — equipment location, duct layout, sizing calculations.

Fee schedule

Fee typeAmountNotes
Mechanical, Plumbing & Electrical Permit — base fee$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection.
Fee per additional appliance or fixture$20.00 eachFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in unincorporated Salt Lake County. MSD uses flat fees by project type for re-roofing, not valuation-based fees.

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal; include scope of work, square footage, and material specifications.
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not performed by the homeowner.

Fee schedule

Fee typeAmountNotes
Reroofing — residential roof with sheathing$125.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Includes inspection of sheathing or decking.
Reroofing — residential roof without sheathing (shingles only)$75.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Shingles only; no decking or sheathing replacement.
Reroofing — small commercial (under $10,000 valuation)$150.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Reroofing — medium commercial ($10,000–$49,999 valuation)$175.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Reroofing — large commercial ($50,000+ valuation)$250.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in unincorporated Salt Lake County. MSD uses a base fee plus per-kW charge for residential and small commercial solar up to 20 kW.

Verified 2026-06-30 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways on the roof.
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter.
  • RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels.
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system.
  • OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power).

Fee schedule

Fee typeAmountNotes
Residential/Small Commercial Solar Permit — base fee (up to 20 kW)$100.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Does not include plan check fee.
Solar Permit — fee per kW (residential/small commercial up to 20 kW)$30.00 per kWFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Additional fee based on system size.
Commercial Solar over 20 kWValuation-based per standard building permit fee table (see building permit fee schedule)FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee is based on applicant's declared valuation as determined by Director or designee.
Battery Storage System$2.00 per batteryFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Assumes inspector is already on site.
Plan Check Fee (residential solar)40% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Solar permits typically require plan review.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Fence Permit

Verified

Required for fence installation in unincorporated Salt Lake County. Fence permit fees are valuation-based using the MSD supplemental construction valuation table ($20 per lineal foot for any fence type), applied to the standard building permit fee table.

Verified 2026-07-01 · Source

Requirements

  • New fence construction
  • Replacement of existing fence in a different location or at a different height
  • Fences in public right-of-way or easements require additional approvals

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal; include fence length, height, material, and location relative to property lines.
  • OptionalSite PlanShowing fence location relative to property lines and any easements.

Fee schedule

Fee typeAmountNotes
Fence PermitValuation-based; fence valuation = $20 per lineal foot (any type), applied to standard building permit fee table (minimum $70)Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Supplemental Construction Valuation Table, page 7 (rendered to PNG and read positionally to avoid column-bleed in text extraction): Fence (any type) = $20.00 per lineal foot, applied to the standard building-permit valuation fee table. This is a published, cited valuation-based fee — verified per the assessment rule (valuation-based fee with a published table = verified, not an estimate). Example: 100 lineal foot fence = $2,000 valuation = $70 minimum permit fee.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in unincorporated Salt Lake County. This is a plumbing permit for the most common standalone project type. Issued by MSD.

Verified 2026-06-30 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner.

Fee schedule

Fee typeAmountNotes
Plumbing Permit — base fee (covers water heater)$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Standard water heater replacement = $70 base for one system inspection.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Demolition Permit

Verified

Required for partial or complete demolition of structures in unincorporated Salt Lake County, including utility disconnection coordination and any required asbestos surveys. Issued by MSD; fee is valuation-based on declared demolition cost.

Verified 2026-07-01 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls
  • Demolition of structures with potential asbestos or lead paint (pre-1980 construction)

Required documents

  • RequiredBuilding Permit Application / Demolition ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal; include scope of demolition, structure details, and disposal plan.
  • OptionalAsbestos SurveyNESHAP asbestos inspection required for structures built before approximately 1980 — federal NESHAP regulations apply.
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition.

Fee schedule

Fee typeAmountNotes
Demolition PermitValuation-based per the standard building permit fee table; valuation = applicant's declared demolition cost (minimum $70)Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Building Permit Fees table, page 5 (rendered to PNG and read positionally): Demolition Permit fee is listed as "Varies" with footnote (d): "Permit fees for demolition and window/door replacement are based on declared valuation," applied to the standard building-permit valuation fee table (same schedule as residential-building-permit). This is a published, cited valuation-based fee — verified per the assessment rule.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Deck Permit

Verified

Required for new deck construction or structural modification of existing decks in unincorporated Salt Lake County. Permit fees are valuation-based using MSD's supplemental construction valuation of $22 per square foot for decks (any type).

Verified 2026-07-01 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • RequiredConstruction DrawingsFraming plan, footing details, ledger attachment method, and railing specifications.
  • RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure.

Fee schedule

Fee typeAmountNotes
Deck PermitValuation-based; deck valuation = $22 per square foot (any deck type), applied to standard building permit fee table (minimum $70)Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Supplemental Construction Valuation Table, page 7 (rendered to PNG and read positionally): Decks (any type) = $22.00 per square foot, applied to the standard building-permit valuation fee table. Published, cited valuation-based fee — verified per the assessment rule. Example: 200 sqft deck = $4,400 valuation → $76.50 + (2 × $16.50) = $109.50 permit fee.
Plan Check Fee — residential40% of the building permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in unincorporated Salt Lake County, including framing, electrical, plumbing, and mechanical work. Issued by MSD. Fee is valuation-based using MSD's supplemental valuation for Basement TI ($28 per square foot).

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (requires separate plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations.
  • RequiredElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations.
  • RequiredMechanical PlanHVAC supply/return for new rooms, combustion air for furnace room.
  • OptionalPlumbing PlanRequired if adding bathroom, wet bar, or utility sink.

Fee schedule

Fee typeAmountNotes
Basement Finish Permit (Basement TI)Valuation-based; Basement TI valuation = $28 per square foot, applied to standard building permit fee table (minimum $70)Grounded and re-confirmed 2026-07-01 against the current MSD FY2025/FY2026 Fee Schedule PDF (msd.utah.gov/DocumentCenter/View/1471/FY-2026-SLCo-Fee-Schedule), Supplemental Construction Valuation Table, page 7 (rendered to PNG and read positionally — the table separately lists "Basements – Finished" at $41.00/sqft and "Basement TI" at $28.00/sqft as distinct line items; this permit correctly cites the Basement TI figure for interior-finish/remodel work of an existing basement shell). Published, cited valuation-based fee — verified per the assessment rule. Example: 800 sqft basement = $22,400 valuation → $76.50 + (20 × $16.50) = $406.50 permit fee.
Plan Check Fee — residential40% of the building permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
Trade Sub-Permits (electrical, plumbing, mechanical as applicable)$70 base per trade, plus $20 per additional appliance/fixtureFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Each trade (electrical, plumbing, mechanical) requires its own separate permit.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Commercial Building Permit

Verified

Required for new commercial building construction in unincorporated Salt Lake County. The Greater Salt Lake Municipal Services District (MSD), which provides building permit services on the county's behalf, uses the same valuation-based "Building and Inspection Fee Calculation" table for commercial as for residential permits — the difference is entirely in the Plan Check Fee rate (65% for commercial vs. 40% for residential) and in how valuation itself is calculated (ICC Square Foot Construction Costs table by occupancy group and construction type, with a 20% deduction for shell-only buildings).

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction on a permitted, properly zoned lot in unincorporated Salt Lake County
  • Complete architectural and structural drawings
  • Site Plan Review or applicable Land Use approval from MSD Planning prior to building permit issuance
  • SWPPP (Stormwater Pollution Prevention Plan) review for qualifying sites
  • Energy code compliance documentation for the adopted commercial IECC

Required documents

  • RequiredBuilding Permit ApplicationSubmit to MSD Building Services, 860 W. Levoy Drive, Suite 300, Taylorsville
  • RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, and structural details
  • RequiredSite Plan Review ApprovalSite Plan Review (under $990 for sites less than 3 acres, $1,640 for sites 3+ acres) is generally required from MSD Planning before or alongside the building permit
  • OptionalSWPPP (Stormwater Pollution Prevention Plan)Required for qualifying commercial sites; MSD charges a $200 base Stormwater Review fee plus $30/acre after the first acre
  • OptionalEnergy Code Compliance DocumentationCOMcheck or equivalent documentation demonstrating compliance with the adopted commercial IECC

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $100,001 to $500,000$1,181.00 for the first $100,000 plus $6.50 for each additional $1,000 or fraction thereofFY2025 Fee Schedule for Salt Lake County (adopted June 17, 2025, eff. July 1, 2025), "Building and Inspection Fee Calculation" table — same formula applies to commercial and residential; no separate commercial valuation table exists
Building Permit — valuation $500,001 to $1,000,000$3,781.00 for the first $500,000 plus $5.50 for each additional $1,000 or fraction thereofFY2025 Fee Schedule for Salt Lake County, "Building and Inspection Fee Calculation" table
Building Permit — valuation over $1,000,001$6,531.00 for the first $1,000,000 plus $4.50 for each additional $1,000 or fraction thereofFY2025 Fee Schedule for Salt Lake County, "Building and Inspection Fee Calculation" table
Plan Check Fee — commercial construction65% of the building permit feeFY2025 Fee Schedule for Salt Lake County, Plan Check Fees section — explicitly distinct from the 40% residential rate. Includes up to 4 plan reviews; additional reviews billed at $80/hour
Shell Only construction valuation adjustment80% of the valuation for new construction (calculated from the ICC Square Foot Construction Costs table)FY2025 Fee Schedule for Salt Lake County, Supplemental Construction Valuation Tables — a shell-only commercial building's fee-determining valuation is discounted to 80% of the full new-construction valuation for its occupancy group and construction type
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County — applied to building permits and mechanical, plumbing, and electrical permits
Fire Sprinklers (supplemental valuation)$6.00 per square footFY2025 Fee Schedule for Salt Lake County, Supplemental Construction Valuation Tables — used to calculate the fee-determining valuation for fire sprinkler scope within a commercial project
Site Plan Review — less than 3 acres$990.00FY2025 Fee Schedule for Salt Lake County, Land Use Fees section — includes agency review meeting and technical review; a Planning prerequisite separate from the Building Permit fee ($1,640 for sites 3+ acres)
Stormwater Review — base fee$200.00FY2025 Fee Schedule for Salt Lake County — base fee per project, plus $30.00 per acre after the first acre when SWPPP is required
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County
Multi-unit Inspection$100.00FY2025 Fee Schedule for Salt Lake County, Additional Inspection Fees section

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement (tenant finish) work in existing commercial buildings in unincorporated Salt Lake County. MSD's fee schedule explicitly defines a Tenant Improvement valuation formula — the fee-determining valuation is calculated as 35% of what the same building would cost as full new construction (per the ICC Square Foot Construction Costs table for its occupancy group and construction type) — which is then run through the same valuation-based Building and Inspection Fee Calculation table as new construction, at the 65% commercial Plan Check Fee rate.

Verified 2026-07-19 · Source

Requirements

  • Interior build-out, remodel, or finish work in an existing commercial tenant space
  • Floor plan showing existing and proposed layout, occupancy classification, and egress
  • Mechanical, electrical, and plumbing plans for the scope of work
  • Fire sprinkler modification plans where the scope affects existing systems

Required documents

  • RequiredBuilding Permit ApplicationSubmit to MSD Building Services, 860 W. Levoy Drive, Suite 300, Taylorsville
  • RequiredConstruction PlansFloor plan showing scope of work, occupancy classification, and egress; structural details if load-bearing elements are affected

Fee schedule

Fee typeAmountNotes
Tenant Improvements — valuation basis35% of the valuation for new construction (calculated from the ICC Square Foot Construction Costs table for the applicable occupancy group and construction type)FY2025 Fee Schedule for Salt Lake County, Supplemental Construction Valuation Tables — this valuation is then run through the standard "Building and Inspection Fee Calculation" table below to determine the actual permit fee
Basement TI (supplemental valuation)$28.00 per square footFY2025 Fee Schedule for Salt Lake County, Supplemental Construction Valuation Tables — used specifically for basement tenant-improvement scope
Remodel/Alteration (supplemental valuation)$39.00 per square footFY2025 Fee Schedule for Salt Lake County, Supplemental Construction Valuation Tables
Building Permit — valuation $25,001 to $50,000 (illustrative tier)$456.00 for the first $25,000 plus $12.00 for each additional $1,000 or fraction thereofFY2025 Fee Schedule for Salt Lake County, "Building and Inspection Fee Calculation" table — the fee tier that applies once the 35%-of-new-construction TI valuation is calculated; higher-valuation tenant improvements use the corresponding higher tier of the same table
Plan Check Fee — commercial construction65% of the building permit feeFY2025 Fee Schedule for Salt Lake County, Plan Check Fees section — applies to commercial tenant improvements at the same rate as new commercial construction
Fire Sprinklers (supplemental valuation, where TI affects existing system)$6.00 per square footFY2025 Fee Schedule for Salt Lake County, Supplemental Construction Valuation Tables
Plan Check Fee — smaller projects$100.00FY2025 Fee Schedule for Salt Lake County — flat alternative for smaller-scope tenant improvement projects
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County

Sign Permit

Verified

Required for erecting, installing, or modifying a sign in unincorporated Salt Lake County. Signs are regulated under Salt Lake County Zoning Ordinance Title 19, Chapter 19.82 (Signs), and the permit is processed and fee'd by MSD Planning as a distinct land-use fee category, separate from the general building permit fee table.

Verified 2026-07-20 · Source

Requirements

  • A sign shall not be erected, raised, moved, placed, reconstructed, extended, enlarged, or altered unless in conformity with Zoning Ordinance Chapter 19.82, and a building permit is required for the sign except as specifically exempted (§ 19.82.040, § 19.82.070)
  • Exempt from the building-permit requirement: property signs, political signs, and nameplates conforming to the chapter's provisions (§ 19.82.070; see also § 19.82.050(B)) — all other on-premises sign types listed in Table 19.82.190 require a permit
  • Most signs are approved through over-the-counter staff review; signs requiring conditional use approval (per the chapter's own review-type classification) additionally require Planning Commission review as an 'Other Conditional Use Permit' — MSD's fee schedule explicitly lists 'signs needing conditional use approval' as triggering this higher review tier
  • On-premises sign allowances vary by zoning district under Table 19.82.190 — representative examples: in the residential zones (S-1-G, R-4-8.5, R-M, RMH), a ground/projecting sign is capped at 32 sq ft plus 1 sq ft per 10 ft of frontage over 30 ft (max 64 sq ft), 20 ft max height, 15 ft setback; in C-1/C-1-L/C-V commercial zones, 48 sq ft plus 1 sq ft per 4 ft of frontage over 30 ft (max 128 sq ft), 25 ft max height, 15 ft setback; in C-2, 48 sq ft plus 1 sq ft per ft of frontage over 30 ft (max 256 sq ft), 30 ft max height; in C-3, 48 sq ft plus 1.5 sq ft per ft of frontage over 30 ft (max 300 sq ft), 30 ft max height; in M-1/M-2 industrial zones, 48 sq ft plus 1 sq ft per ft of frontage over 30 ft (max 256 sq ft), 35 ft max height, 15 ft setback
  • A monument sign (most zones) is limited to one per lot, 32 sq ft plus 1 sq ft per 4-10 ft of frontage over 30 ft (max 64 sq ft depending on zone), 6 ft max height, with an 18-inch to 6-ft setback depending on zone (Table 19.82.190)
  • Political signs are capped at 16 sq ft, 6 ft max height, must sit at least 10 ft from a driveway, and must be removed within 15 days of the final voting day (Table 19.82.190)
  • Nameplates are capped at 3 sq ft and must be attached to the main structure; property on-premises signs are capped at 6 sq ft (Table 19.82.190)
  • The applicable zone's full sign allowance (including awning, roof, window, and flat/wall sign standards, which vary further by zone) should be confirmed with MSD Planning before applying

Required documents

  • RequiredSign Permit ApplicationSubmitted to MSD Planning; site plan and sign details required for staff review.
  • OptionalConditional Use Permit ApplicationRequired in addition to the sign permit only for signs that need conditional use approval under Chapter 19.82 — triggers Planning Commission review rather than staff-only review.

Fee schedule

Fee typeAmountNotes
Sign Permit — over-the-counter staff review$110.00FY2025 Fee Schedule for Salt Lake County (adopted June 17, 2025, eff. July 1, 2025), 'Land Use Fees' / 'Permitted and Conditional Uses' table — page 9 of the fee schedule PDF, rendered to PNG and read visually to avoid the column-jumbling this table produces in plain-text extraction. Listed as 'Sign Permit — Over-the-counter staff review — $110.00.'
Other Conditional Use Permit (signs needing conditional use approval)$1,640.00FY2025 Fee Schedule for Salt Lake County, same 'Permitted and Conditional Uses' table. Listed as 'Other Conditional Use Permits — Commercial uses, residential uses, or signs needing conditional use approval. Includes agency review, technical review and Planning Commission meeting — $1,640.00.' Applies only to the subset of signs whose type/location requires conditional use review under Chapter 19.82, not to standard staff-reviewed signs.

EV Charger / EVSE Permit

Verified

Unincorporated Salt Lake County does not publish a distinct EV charger, EVSE, or electric vehicle charging station permit or fee. EV charger/EVSE installation is electrical work and falls under the general Electrical Permit issued by the Greater Salt Lake Municipal Services District (MSD), which provides building permit and inspection services under contract with Salt Lake County. MSD's FY2025 Fee Schedule for Salt Lake County (adopted June 17, 2025) and Building Services page do not publish a distinct EV-specific permit category or fee line item (checked 2026-07-19).

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel capacity to serve the charger, covered under the general Electrical Permit
  • Compliance with the 2023 NEC per Utah Code § 15A-2-103(1)(g); MSD's own page still lists the 2020 NEC (live-checked 2026-07-16) — confirm enforced edition with MSD before starting electrical work

Required documents

  • RequiredBuilding Permit ApplicationSubmit through MSD CityWorks portal at msd.utah.gov/portal.
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout.
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for work not performed by the homeowner.

Fee schedule

Fee typeAmountNotes
Mechanical, Plumbing & Electrical Permit — base fee$70.00FY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Fee covers one system/appliance inspection; same line item covers EV charger circuit installation — no distinct EV-specific fee is published.
Fee per additional appliance or fixture$20.00 eachFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.
State Surcharge1% of the permit feeFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025.

Fire Sprinkler / Fire Alarm Permit

Required for installation, modification, or removal of an automatic fire sprinkler system, fire alarm/detection system, fire pump, fuel tank, or standpipe system in unincorporated Salt Lake County. Unlike the trade permits above, this permit is issued by the Unified Fire Authority (UFA) Fire Prevention Bureau, not by MSD — UFA is the fire code official for unincorporated Salt Lake County and enforces the International Fire Code under Salt Lake County Code Title 9, Chapter 9.77, consistent with the State Fire Code adopted under Utah Code §15A-1-403.

Reviewed 2026-07-22 · Source

Requirements

  • Any property owner or authorized agent who intends to install or modify a fire protection or fire alarm/detection system shall first make application to UFA as fire code official and obtain the required permit before work begins (International Fire Code §105.1.1)
  • A third-party peer review of plans is required for automatic fire protection system installation/modification, fire alarm and detection systems, fire pumps and related fuel tanks, jockey pumps and controllers, and standpipe system installation, modification, or removal (International Fire Code §104.7.2)
  • Peer review is not required for: fire hydrants and underground supply lines; pre-engineered kitchen hood suppression systems; installation or relocation of fewer than 20 sprinkler heads; or installation or relocation of fewer than 5 alarm/notification appliances — a permit is still required for this smaller-scope work
  • Except for R-3 occupancies, where a fire alarm system is installed, actuation of the automatic sprinkler system shall also actuate the building fire alarm system
  • Beginning work on a fire protection system before permit issuance and plan approval is done at the contractor's own risk — UFA states no special allowances or accommodations will be granted

Required documents

  • RequiredFire Protection System Permit ApplicationSubmitted to UFA's Fire Prevention Bureau, not through MSD's CityWorks portal used for building/electrical/plumbing/mechanical permits.
  • OptionalFire Sprinkler Plan (per UFA's Fire Sprinkler Plan Submittal Guide)Required when the scope includes automatic fire sprinkler system work.
  • OptionalFire Alarm Plan (per UFA's Fire Alarm Plan Submittal Guide)Required when the scope includes fire alarm or detection system work.
  • OptionalThird-Party Peer Review ReportRequired for scopes exceeding the 20-sprinkler-head / 5-alarm-device threshold, per International Fire Code §104.7.2. Peer reviewer is a third party engaged by the applicant, not UFA staff.
  • OptionalMaterial and Test Certificate (Aboveground/Underground Piping)Submitted at system test/completion for sprinkler systems, per UFA's published form.
  • OptionalRecord of Completion – Fire Alarm SystemSubmitted at system test/completion for fire alarm systems, per UFA's published form.

Fee schedule

Fee typeAmountNotes
Fire Sprinklers (MSD supplemental construction valuation, when sprinkler work is part of an MSD building permit scope)$6.00 per square footFY2025 Fee Schedule for Salt Lake County (adopted June 17, 2025, eff. July 1, 2025), Supplemental Construction Valuation Tables, verified 2026-07-22 by direct PDF page read. This valuation is run through the standard MSD Building and Inspection Fee Calculation table (minimum $70) to determine the building-permit-fee portion attributable to sprinkler scope within a larger commercial or tenant-improvement permit — it is not a standalone UFA permit fee.
UFA standalone fire sprinkler/fire alarm permit or plan-review feeNot publishedChecked 2026-07-22: UFA's Plan Reviews page and Make a Payment page (which lists specific payable line items such as Blasting Permit Fee, Fireworks Permit Fee, and HazMat Operational/Tank Installation Permit Fees) do not list a fire sprinkler or fire alarm permit/plan-review fee. UFA is a joint fire authority serving unincorporated Salt Lake County and multiple member cities; no distinct published fee schedule for these permits was found on UFA's own site. Genuine gap, not an omission — confirm current cost directly with UFA Fire Prevention Bureau, (801) 743-7200.
Third-Party Peer Review (when required)Not published — paid directly to the peer reviewer, not to UFAInternational Fire Code §104.7.2 requires the peer review to be performed by a third party engaged by the applicant; UFA does not publish a fee for this since it is not a UFA charge.

Change of Use Permit

Verified

Required for tenant changes and changes in the use of a room, area, or building in unincorporated Salt Lake County. MSD Planning processes the Change of Use Permit as a distinct Land Use fee category — over-the-counter staff review covering tenant changes and uses subordinate to an existing Conditional Use Permit — separate from the trade-permit fee table used for building/electrical/plumbing/mechanical permits. A change of use that also alters a room or area additionally requires a Building Permit, and a Certificate of Occupancy reflecting the new use is issued through MSD's CityWorks portal once compliance is confirmed.

Verified 2026-07-22 · Source

Requirements

  • A tenant change or a change in the use of a room, area, or building in unincorporated Salt Lake County requires a Change of Use Permit review from MSD Planning
  • Uses subordinate to an existing Conditional Use Permit are processed under this same Change of Use Permit category rather than requiring separate new Conditional Use Permit approval
  • If the new use itself requires Conditional Use Permit approval under Zoning Ordinance Title 19 (rather than being merely subordinate to an existing one), the higher 'Other Conditional Use Permits' review track applies instead, including agency review, technical review, and Planning Commission meeting
  • Changing the use of a room or area within an existing building (e.g., converting unfinished or storage space to habitable/office space) also requires a separate Building Permit per MSD's published building-permit guidance, in addition to the Change of Use Permit
  • A Certificate of Occupancy reflecting the new use classification must be obtained before occupying the space under its new use

Required documents

  • RequiredChange of Use Permit ApplicationSubmit through the MSD CityWorks portal at msd.utah.gov/portal, or in person at 860 W. Levoy Drive, Suite 300, Taylorsville.
  • RequiredSite/Floor PlanShowing existing and proposed use, occupancy classification, and tenant space boundaries.
  • OptionalConditional Use Permit ApplicationRequired only if the new use itself requires conditional use approval under Zoning Ordinance Title 19, rather than being subordinate to an existing Conditional Use Permit.
  • OptionalBuilding Permit ApplicationRequired in addition to the Change of Use Permit when the change also involves altering a room or area (framing, MEP work).

Fee schedule

Fee typeAmountNotes
Change of Use Permit — over-the-counter staff review$110.00FY2025 Fee Schedule for Salt Lake County (adopted June 17, 2025, eff. July 1, 2025), Land Use Fees / Permitted and Conditional Uses table, verified 2026-07-22 by direct PDF page read. Listed as: 'Change of Use Permit — Over-the-counter staff review. Includes tenant changes and uses subordinate to an existing Conditional Use Permit. — $110.00.'
Other Conditional Use Permit (only if the new use itself requires conditional use approval)$1,640.00FY2025 Fee Schedule for Salt Lake County, same Land Use Fees / Permitted and Conditional Uses table. Listed as 'Other Conditional Use Permits — Commercial uses, residential uses, or signs needing conditional use approval. Includes agency review, technical review and Planning Commission meeting — $1,640.00.' Applies only when the new use is not merely subordinate to an existing Conditional Use Permit.
Building Permit (only if the change of use also involves construction/alteration)Valuation-based per the standard Building and Inspection Fee Calculation table (minimum $70)FY2025 Fee Schedule for Salt Lake County — same valuation-based table used for the residential-building-permit and other trade permits in this file; applies only when the change of use includes framing, MEP, or other construction work.
Re-Inspection Fee$50.00 per occurrenceFY2025 Fee Schedule for Salt Lake County, adopted June 17, 2025. Applies only if the change of use triggers a building-permit inspection.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Salt Lake County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-30)View current record →All versions →

Permalink: /utah/salt-lake-county/unincorporated-salt-lake/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.