This is PermitBase’s published record for Monticello as of 2026-07-08. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Monticello building permits
VerifiedMonticello, Utah — as published 2026-07-08.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family and two-family residential construction, moving a trailer or pre-built home onto a lot, and any addition, remodeling, or demolition in Monticello. Fees are valuation-based per the city's Consolidated Fee Schedule; plan review must be completed within the statutory 14-business-day window (after a 3-business-day completeness screening period) required by Utah Code § 10-20-909 for one- and two-family dwellings and townhomes — Monticello's own New Residential Building Permit Checklist explicitly states this statutory figure to applicants.
Verified 2026-07-08 · Source
Requirements
- New single-family or two-family residential construction, moving a trailer/pre-built home onto a lot, or any addition, remodel, or demolition
- Complete set of plans drawn to scale, submitted to the Building Official for review (per the city's Plan Requirements sheet); plans for single-family residences generally need not be architect/engineer-stamped unless the Building Official deems it necessary given project scope/design
- Legal description and San Juan County property tax parcel number
- Building permit application filled out completely and signed by the owner or agent, listing all contractors/subcontractors with current Utah Contractor license (name, license number, licensed trades, expiration date), address, phone, and email
- Property must be deeded in the applicant's name and recorded in the San Juan County Recorder's Office before permit issuance (or a notarized statement from the legal owner granting permission to build)
- Owner-builders performing their own work on a personal, non-commercial single-family residence must submit the Owner Build Certification and Agreement prior to beginning construction, per the Utah Construction Trades Licensing Act; all commercial project work must be performed by licensed contractors — commercial owners may not act as their own contractor in Utah
Required documents
- RequiredNew Residential Building Permit ChecklistMonticello's official checklist (monticelloutah.org, 'Building Permit' media folder) covering building address, parcel number, owner contact info, proof of ownership, point of contact, contractor/subcontractor info, easement acknowledgement, utility connection requests, and a detailed project-description list (setbacks, square footage, zone, height, garage size, project cost, floor plan, roof detail, structural calculations, stair sections, utility connections, elevation views). States verbatim: 'The state of Utah allows 14 business days to approve a COMPLETED building permit.'
- RequiredBuilding Permit Acknowledgement of Easements and EncumbrancesOfficial form (monticelloutah.org, 'Building Permit' media folder) acknowledging easements within the property lines.
- OptionalOwner Builder Certification and AgreementRequired prior to beginning construction for any owner acting as their own contractor on a personal-use, non-commercial single-family residence, per the Utah Construction Trades Licensing Act as cited on Monticello's Building Permits page.
- RequiredBuilding Permit Application (iworq Citizen Portal)Monticello's online permitting portal (monticello.portal.iworq.net/portalhome/monticello), linked directly from the city's Building and Zoning department page as 'Building Permits.'
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (Monticello City Consolidated Fee Schedule, as of 04/14/2026) | $1–$500: $23.50 flat. $501–$2,000: $23.50 for the first $500 plus $3.05 for each additional $100. $2,001–$25,000: $69.25 for the first $2,000 plus $14.00 for each additional $1,000. $25,001–$50,000: $391.25 for the first $25,000 plus $10.10 for each additional $1,000. $50,001–$100,000: $643.75 for the first $50,000 plus $7.00 for each additional $1,000. $100,001–$500,000: $993.75 for the first $100,000 plus $5.60 for each additional $1,000. $500,001–$1,000,000: $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000. $1,000,000 and up: $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000. | Monticello City Consolidated Fee Schedule, 'Building Permit Fees' table, dated as of 04/14/2026 (signed ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf. |
| Building Inspection Fee | $65.00 | Monticello City Consolidated Fee Schedule, 'Permit Fees' section: 'Building Inspection Fee — $65.00.' |
| State Fee | 1% of Permit Fee | Monticello City Consolidated Fee Schedule, 'Permit Fees' section: 'State Fee — 1% of Permit Fee' (statewide building-permit surcharge). |
| Residential Plan Review (valuation $5,001 or more) | $130.00 | Monticello City Consolidated Fee Schedule, 'Permit Fees' section: 'Residential Plan Review (Valuation $5,001 or more) — $130.00.' |
| Minor Residential Plan Review (valuation $5,000 or less) | $50.00 | Monticello City Consolidated Fee Schedule, 'Permit Fees' section: 'Minor Residential Plan Review (Valuation $5,000 or less) — $50.00.' |
| 6-month Building Permit Extension Fee | $50.00 | Monticello City Consolidated Fee Schedule, 'Permit Fees' section: '6-month Building Permit Extension Fee — $50.00.' |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Monticello building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.