Skip to main content
PermitBase

This is PermitBase’s published record for Monticello as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Monticello building permits

Verified

Monticello, Utah — as published 2026-07-20.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — statewide construction code per Utah Code § 15A-2-103, effective 07/01/2026. Monticello's own Building and Zoning page does not enumerate specific code editions; the city administers the statewide State Construction Code with no locally-published deviation found, so the current statutory statewide editions are cited directly.2021 International Residential Code (IRC), including Appendix AQ — statewide, per Utah Code § 15A-2-103, effective 07/01/2026 (IRC edition unchanged from the prior 2023-2026 cycle).2024 International Plumbing Code (IPC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.2024 International Mechanical Code (IMC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.2024 International Fuel Gas Code (IFGC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.2024 International Energy Conservation Code (IECC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.2024 International Existing Building Code (IEBC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.2023 National Electrical Code (NEC) — statewide, per Utah Code § 15A-2-103, effective 07/01/2026.Residential provisions of the 2024 International Swimming Pool and Spa Code — statewide, per Utah Code § 15A-2-103(1)(n), effective 07/01/2026.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and two-family residential construction, moving a trailer or pre-built home onto a lot, and any addition, remodeling, or demolition in Monticello. Fees are valuation-based per the city's Consolidated Fee Schedule; plan review must be completed within the statutory 14-business-day window (after a 3-business-day completeness screening period) required by Utah Code § 10-20-909 for one- and two-family dwellings and townhomes — Monticello's own New Residential Building Permit Checklist explicitly states this statutory figure to applicants.

Verified 2026-07-19 · Source

Requirements

  • New single-family or two-family residential construction, moving a trailer/pre-built home onto a lot, or any addition, remodel, or demolition
  • Complete set of plans drawn to scale, submitted to the Building Official for review (per the city's Plan Requirements sheet); plans for single-family residences generally need not be architect/engineer-stamped unless the Building Official deems it necessary given project scope/design
  • Legal description and San Juan County property tax parcel number
  • Building permit application filled out completely and signed by the owner or agent, listing all contractors/subcontractors with current Utah Contractor license (name, license number, licensed trades, expiration date), address, phone, and email
  • Property must be deeded in the applicant's name and recorded in the San Juan County Recorder's Office before permit issuance (or a notarized statement from the legal owner granting permission to build)
  • Owner-builders performing their own work on a personal, non-commercial single-family residence must submit the Owner Build Certification and Agreement prior to beginning construction, per the Utah Construction Trades Licensing Act; all commercial project work must be performed by licensed contractors — commercial owners may not act as their own contractor in Utah

Required documents

  • RequiredNew Residential Building Permit ChecklistMonticello's official checklist (monticelloutah.org, 'Building Permit' media folder) covering building address, parcel number, owner contact info, proof of ownership, point of contact, contractor/subcontractor info, easement acknowledgement, utility connection requests, and a detailed project-description list (setbacks, square footage, zone, height, garage size, project cost, floor plan, roof detail, structural calculations, stair sections, utility connections, elevation views). States verbatim: 'The state of Utah allows 14 business days to approve a COMPLETED building permit.'
  • RequiredBuilding Permit Acknowledgement of Easements and EncumbrancesOfficial form (monticelloutah.org, 'Building Permit' media folder) acknowledging easements within the property lines.
  • OptionalOwner Builder Certification and AgreementRequired prior to beginning construction for any owner acting as their own contractor on a personal-use, non-commercial single-family residence, per the Utah Construction Trades Licensing Act as cited on Monticello's Building Permits page.
  • RequiredBuilding Permit Application (iworq Citizen Portal)Monticello's online permitting portal (monticello.portal.iworq.net/portalhome/monticello), linked directly from the city's Building and Zoning department page as 'Building Permits.'

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (Monticello City Consolidated Fee Schedule, as of 04/14/2026)$1–$500: $23.50 flat. $501–$2,000: $23.50 for the first $500 plus $3.05 for each additional $100. $2,001–$25,000: $69.25 for the first $2,000 plus $14.00 for each additional $1,000. $25,001–$50,000: $391.25 for the first $25,000 plus $10.10 for each additional $1,000. $50,001–$100,000: $643.75 for the first $50,000 plus $7.00 for each additional $1,000. $100,001–$500,000: $993.75 for the first $100,000 plus $5.60 for each additional $1,000. $500,001–$1,000,000: $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000. $1,000,000 and up: $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000.Monticello City Consolidated Fee Schedule, 'Building Permit Fees' table, dated as of 04/14/2026 (signed ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf.
Building Inspection Fee$65.00Monticello City Consolidated Fee Schedule, 'Permit Fees' section: 'Building Inspection Fee — $65.00.'
State Fee1% of Permit FeeMonticello City Consolidated Fee Schedule, 'Permit Fees' section: 'State Fee — 1% of Permit Fee' (statewide building-permit surcharge).
Residential Plan Review (valuation $5,001 or more)$130.00Monticello City Consolidated Fee Schedule, 'Permit Fees' section: 'Residential Plan Review (Valuation $5,001 or more) — $130.00.'
Minor Residential Plan Review (valuation $5,000 or less)$50.00Monticello City Consolidated Fee Schedule, 'Permit Fees' section: 'Minor Residential Plan Review (Valuation $5,000 or less) — $50.00.'
6-month Building Permit Extension Fee$50.00Monticello City Consolidated Fee Schedule, 'Permit Fees' section: '6-month Building Permit Extension Fee — $50.00.'

Commercial Building Permit

Verified

Required for new commercial building construction in Monticello. The city bills commercial construction under the same valuation-based Building Permit Fee table used for residential construction — Monticello's Consolidated Fee Schedule (as of 04/14/2026) does not maintain a separate commercial valuation track — but assesses a Commercial Plan Review fee of $65.00 per hour instead of the flat residential plan-review fee. Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures), and all commercial project work must be performed by licensed contractors; commercial owners may not act as their own contractor in Utah.

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction (new construction, addition, remodel, or change of occupancy)
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
  • All commercial project work must be performed by licensed contractors under the Utah Construction Trades Licensing Act — commercial owners may not act as their own contractor
  • Legal description and San Juan County property tax parcel number
  • Building permit application listing all contractors/subcontractors with current Utah Contractor license (name, license number, licensed trades, expiration date)
  • Property must be deeded in the applicant's name and recorded in the San Juan County Recorder's Office before permit issuance (or a notarized statement from the legal owner granting permission to build)

Required documents

  • RequiredComplete Set of Plans and Engineering, Stamped by a Utah Licensed Architect or EngineerRequired for all commercial construction; the one-/two-family dwelling exemption from stamped plans does not apply to commercial structures.
  • RequiredSite Plan (to scale)Per the city's Plan Requirements sheet.
  • RequiredBuilding Permit Application (iworq Citizen Portal)Monticello's online permitting portal (monticello.portal.iworq.net/portalhome/monticello).
  • RequiredLegal Description and San Juan County Property Tax Parcel NumberLocatable on the applicant's tax notice.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (same table as residential)$1–$500: $23.50 flat. $501–$2,000: $23.50 for the first $500 plus $3.05 for each additional $100. $2,001–$25,000: $69.25 for the first $2,000 plus $14.00 for each additional $1,000. $25,001–$50,000: $391.25 for the first $25,000 plus $10.10 for each additional $1,000. $50,001–$100,000: $643.75 for the first $50,000 plus $7.00 for each additional $1,000. $100,001–$500,000: $993.75 for the first $100,000 plus $5.60 for each additional $1,000. $500,001–$1,000,000: $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000. $1,000,000 and up: $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000.
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from… Show full citation

Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — verified directly against the rendered PDF page image (the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track).

Building Inspection Fee$65.00
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from… Show full citation

Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — verified directly against the rendered PDF page image (the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track).

State Fee1% of Permit Fee
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from… Show full citation

Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — verified directly against the rendered PDF page image (the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track).

Commercial Plan Review (per Hour)$65.00Monticello City Consolidated Fee Schedule, 'Permit Fees' section: 'Commercial Plan Review (per Hour) — $65.00' — verified directly against the rendered PDF page image (page 2 of the fee schedule document); billed hourly instead of the flat $130/$50 residential plan-review fee.
6-month Building Permit Extension Fee$50.00
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from… Show full citation

Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — verified directly against the rendered PDF page image (the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track).

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement / tenant finish work inside an existing commercial building in Monticello (e.g., interior build-out following a shell permit, or remodel of existing commercial space). Monticello's Consolidated Fee Schedule maintains no separate tenant-improvement fee tier — tenant improvement work is billed under the same valuation-based Building Permit Fee table and the same $65.00-per-hour Commercial Plan Review fee as new commercial construction.

Verified 2026-07-19 · Source

Requirements

  • Tenant improvement / tenant finish work, remodel, or change of occupancy inside an existing commercial building
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
  • All commercial project work must be performed by licensed contractors — commercial owners may not act as their own contractor
  • Legal description and San Juan County property tax parcel number
  • Building permit application listing all contractors/subcontractors with current Utah Contractor license

Required documents

  • RequiredComplete Set of Plans and Engineering, Stamped by a Utah Licensed Architect or Engineer (where applicable to scope)Required for structural, electrical, mechanical, or plumbing tenant-improvement scope.
  • OptionalSite Plan (to scale)Per the city's Plan Requirements sheet; may be waived by the Building Official for interior-only scopes with no site changes.
  • RequiredBuilding Permit Application (iworq Citizen Portal)Monticello's online permitting portal.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (same table as new commercial construction)$1–$500: $23.50 flat. $501–$2,000: $23.50 for the first $500 plus $3.05 for each additional $100. $2,001–$25,000: $69.25 for the first $2,000 plus $14.00 for each additional $1,000. $25,001–$50,000: $391.25 for the first $25,000 plus $10.10 for each additional $1,000. $50,001–$100,000: $643.75 for the first $50,000 plus $7.00 for each additional $1,000. $100,001–$500,000: $993.75 for the first $100,000 plus $5.60 for each additional $1,000. $500,001–$1,000,000: $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000. $1,000,000 and up: $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000.
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from… Show full citation

Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — verified directly against the rendered PDF page image (the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track). Monticello does not publish a reduced or distinct valuation table for tenant-improvement scope; the improvement's construction valuation is run through the same table.

Building Inspection Fee$65.00
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from… Show full citation

Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — verified directly against the rendered PDF page image (the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track).

State Fee1% of Permit Fee
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from… Show full citation

Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — verified directly against the rendered PDF page image (the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track).

Commercial Plan Review (per Hour)$65.00Monticello City Consolidated Fee Schedule, 'Permit Fees' section — same hourly commercial plan-review rate applies to tenant-improvement scope as to new commercial construction; no separate TI rate is published.
6-month Building Permit Extension Fee$50.00
Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from… Show full citation

Monticello City Consolidated Fee Schedule (signed ordinance dated 04/14/2026, ordinance 2026-06), retrieved from monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf, 'Building Permit Fees' section — verified directly against the rendered PDF page image (the same valuation table used for residential construction; the schedule does not maintain a separate commercial valuation track).

Sign Permit

Verified

A building permit is required in Monticello for the placement, construction, or alteration of most signs, per City Code section 10-2-6 (Signs), unless the sign qualifies as an exempt or temporary sign. The fee is a flat $20.00, set by City Council resolution and published in the city's Consolidated Fee Schedule.

Verified 2026-07-20 · Source

Requirements

  • Placement, construction, or structural alteration of a sign not otherwise exempt or temporary under 10-2-6
  • Detailed scale drawings of all existing and proposed signs on the lot
  • Zoning administrator review within five (5) days of a complete application
  • Post-installation inspection by the zoning administrator

Required documents

  • RequiredSign Permit ApplicationOne application and permit may cover multiple signs on the same lot or parcel
  • RequiredDetailed DrawingsMust show: height of all signs on the lot; square footage of each individual sign; total combined square footage of all signs on the lot; site plan indicating street frontage length, building/parking/driveway/landscape locations, and all existing/proposed signs on site; overall dimensions, design, structure, materials, proposed copy, and illumination specifications; and photographs of the lot
  • OptionalLiability Insurance ProofRequired for projecting signs over public rights of way, before a permit will be issued

Fee schedule

Fee typeAmountNotes
Sign Permit Fee$20.00
City Code 10-2-6(O)(3) states each application shall be accompanied by 'the applicable fee, which shall be established by resolution of the city council.' Re-chased 2026-07-20: found the actual… Show full citation

City Code 10-2-6(O)(3) states each application shall be accompanied by 'the applicable fee, which shall be established by resolution of the city council.' Re-chased 2026-07-20: found the actual dollar figure in the city's own Consolidated Fee Schedule (signed ordinance 2026-06, dated 04/14/2026, monticelloutah.org/media/Consolidated%20fee%20Schedule/signed-ordinance-2026-06-consolidated-fee-schedule-update.pdf), page 13 of the PDF, 'Planning & Zoning Fees' table: 'Sign Permit ... $20.00' — verified by rendering the page to an image and reading the table visually to rule out a column-jumbling misread.

EV Charger / EVSE Permit

Monticello's Consolidated Fee Schedule (as of 04/14/2026, Ordinance 2026-06) does not publish a distinct EV-charger fee line item, and the city has no general electrical-permit category — only a single valuation-based Building Permit Fee and a flat $65.00 Building Inspection Fee. A full-text search of the fee schedule found zero mentions of 'EV,' 'electric vehicle,' 'charging station,' 'EVSE,' or a standalone electrical-trade fee. The city has not published explicit confirmation of how EV charger installs are billed, so this entry is marked partial confidence.

Reviewed 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • Building Permit Application submitted to the Monticello City Building Official
  • Confirm applicable fee category directly with the Building Official before applying, since no EV-specific or general electrical-permit line item is published

Required documents

  • RequiredBuilding Permit ApplicationSubmitted to the Monticello City Building Official; requires a complete set of scaled plans, legal description/parcel number, and licensed contractor information per Monticello's official Building Permits page.

Fee schedule

Fee typeAmountNotes
Building Inspection Fee (closest published flat fee)$65.00
Monticello City Consolidated Fee Schedule (as of 04/14/2026), 'Permit Fees' section: 'Building Inspection Fee — $65.00.' Not confirmed as EV-specific; Show full citation

Monticello City Consolidated Fee Schedule (as of 04/14/2026), 'Permit Fees' section: 'Building Inspection Fee — $65.00.' Not confirmed as EV-specific; Monticello has no standalone electrical-permit or EV-charger line item, so this is the closest published flat inspection fee that would likely apply to a standalone electrical install.

Permit Fee (Based on Valuation) — if applicable$23.50 minimum (valuation $1–$500), scaling per the city's valuation table for higher-value workMonticello City Consolidated Fee Schedule (as of 04/14/2026), 'Building Permit Fees' table. Applies if the city treats an EV charger install as valuation-based new work rather than a flat-fee inspection.
State Fee1% of Permit FeeMonticello City Consolidated Fee Schedule (as of 04/14/2026), 'Permit Fees' section.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Monticello building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-19)Later version (2026-07-21) →View current record →All versions →

Permalink: /utah/san-juan-county-ut/monticello-ut/as-of/2026-07-20/

Snapshot date: 2026-07-20

Commit: 3ce8a2d

Reproducible from PermitBase’s version-controlled dataset, commit 3ce8a2d.