This is PermitBase’s published record for Richfield as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Richfield building permits
Richfield, Utah — as published 2026-07-07.
Reviewed 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
Required for new single-family and two-family residential construction and any structural, electrical, plumbing, or mechanical work regulated by the statewide 2021 IRC/IBC. Richfield calls this the 'Large Building Permit Application' (house, garage, commercial, etc.), submitted online via the utah.cityinspect.com portal per the city's official Forms & Applications page.
Reviewed 2026-07-08 · Source
Requirements
- New single-family or two-family residential construction
- Any structural, electrical, plumbing, or mechanical change or addition, per Richfield's official FAQ ('A Building permit is generally needed if any structural, electrical, plumbing or mechanical changes or additions will be made')
- Basement finish work (confirmed permit-required per Richfield's official FAQ: 'Is a Permit required to finish my basement? Yes')
- Retaining walls over 4 feet high require a permit and engineered plans, per Richfield's official FAQ
- Repairs or replacement of existing elements (e.g., drywall refinishing, floor coverings, paint) are generally exempt, per Richfield's official FAQ
Required documents
- RequiredLarge Building Permit Application (CityInspect online portal)Submitted online at utah.cityinspect.com (Richfield's registration link, per the city's official Forms & Applications page) for house, garage, commercial, and other large-scope projects.
- OptionalBuilding Permit Application (paper form, alternate)May also be picked up in person at the Building and Zoning Department, City Offices, 75 East Center (basement level), per Richfield's official FAQ page.
Fee schedule
| Fee type | Amount | Notes |
|---|
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Richfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.