Skip to main content
PermitBase

Richfield building permits

Department contacts, adopted codes, permit types, fees, and gotchas for Richfield, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
75 East Center Street (basement level), Richfield, UT 84701
Phone
(435) 896-6439
Email
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Inspection guide

See how inspections work in Richfield — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide code as of 7/1/2026 under the Utah Uniform Building Standard Act (Utah Code Title 15A); Utah Code § 15A-2-103(1)(a). Richfield, as a Utah municipality, is bound to the statewide State Construction Code per Utah Code § 15A-2-103 and does not separately codify its own edition (its own FAQ/Forms pages, live-checked 2026-07-16, do not state any code edition at all)
  • 2021 International Residential Code (IRC) — REMAINS CURRENT statewide code; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment (consistent with the same statewide code confirmed on Murray City's official Building Division page, though Murray's own page has separately been found to contradict itself elsewhere — not relied on here beyond the general statewide-cycle confirmation)
  • Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); Richfield does not separately itemize this, added here per statute
  • 2024 International Plumbing Code (IPC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(d)
  • 2024 International Mechanical Code (IMC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(e)
  • 2024 International Fuel Gas Code (IFGC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(f); not itemized in Richfield's own materials (which cite only the statewide statute generally), added here per statute since this file had previously omitted it entirely
  • 2024 International Existing Building Code (IEBC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(i)
  • 2024 International Energy Conservation Code (IECC) with Utah amendments, single unsplit statewide edition — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(h)
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized in Richfield's own materials, added here per statute since this file had previously omitted it entirely
  • 2023 National Electrical Code (NEC) — current statewide electrical code; Utah Code § 15A-2-103(1)(g) did NOT change this edition in the 7/1/2026 amendment
  • NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. This entry previously described the 2024-cycle codes in future tense ('takes effect July 1, 2026'); that date has now passed, so IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now stated as CURRENT (2024/2024/2024/2024/2024/2024/2024), while IRC (2021) and NEC (2023) remain unchanged and were already correctly stated. Richfield publishes no city-specific code-edition page (its FAQ and Forms & Applications pages, live-checked 2026-07-16, do not mention code editions at all), so this file continues to rely solely on the statewide statute rather than a lagging city page — there is no city-page conflict to record for Richfield.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date
No data reported
Latest full year
No data reported

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Richfield's Building and Zoning Department is fully independent of Sevier County — it has its own Building Inspector and Zoning Administrator on the city payroll, its own permit application system, and its own office at 75 East Center Street (basement). It is not contracted to Sevier County for permitting.
  • Richfield uses a two-track permit intake: the utah.cityinspect.com online portal for 'Large Building Permit' applications (house, garage, commercial) and a separate DocHub-hosted PDF for 'Small Building Permit' applications (fence, shed). Confirm the current link on richfieldut.gov/forms-applications before applying.
  • A permit is required for a fence of any height in Richfield; setbacks are front 1 foot off the sidewalk (max 36 inches high), side/rear along the property line (max 6 feet high), per the city's official FAQ.
  • Accessory buildings (sheds, barns, detached garages) under 120 sq ft with no electrical or plumbing do not require a permit; any size accessory building with electrical or plumbing does require one, per Richfield's official FAQ.
  • No dedicated building-permit fee schedule could be independently verified as of 2026-07-08: the city's fee-bearing PDFs ('Small Building Permit' and 'Impact Fees', both linked from richfieldut.gov/forms-applications) are hosted on DocHub, whose client-rendered viewer blocks unauthenticated automated PDF extraction, and no fee schedule or budget document was found elsewhere on richfieldut.gov or in Wayback Machine history for the domain. The residential-building-permit entry is therefore marked confidence:"partial" with fees left empty rather than fabricated.
  • Richfield's own municipal code (Title 16, Buildings and Construction) is hosted on a client-side-rendered SPA (hosting.civiclinq.com/richfield) that returns no server-side text to automated fetch tools; only the section index (starting at 16.01.010) was confirmed via the city's official City Ordinances page.
  • No Richfield-specific plan-review turnaround time is published; the statutory floor of Utah Code § 10-20-909 (14 business days after a 3-business-day completeness screening period, for one/two-family dwellings and townhomes) is used as the verified reviewTimelineDays basis, consistent with the escalation path specified for this corpus.

Comparable nearby cities

Unincorporated Sevier County
Both in Sevier County7 shared permit types
Compare fees →
Ephraim
9 shared permit types~49 mi away
Compare fees →