Sign Permit in Richfield, Utah
Richfield City Code Chapter 17.17 (Signs) — live-read via the city's civiclinQ code-hosting platform on 2026-07-22 — establishes a 'Sign Application' as its own distinct land-use application, separate from a Building Permit. Per 17.17.070, the type of Sign Application required (Temporary (T), Seasonal (S), Permitted (P), or Conditional (C-1 or C-2)) depends on the associated use and is decided by the Zoning Administrator (T/S/P) or the Planning Commission/City Council (C-1/C-2), per 17.17.080. Separately, 17.17.040 (Building Permit Required) states that 'no sign shall be erected, moved, reconstructed, enlarged, or structurally altered unless and until a valid Building Permit Application has been reviewed and approved by the City's Building Official' whenever the Building Code applies (e.g., wall-mounted, footed/foundationed, or electrically-connected signs) — so most substantive signs require BOTH a Sign Application (the zoning/use-approval track) and a Building Permit (the construction track), filed via the same 'Large/Small Building Permit' and CityInspect system documented elsewhere in this file.
Reviewed 2026-07-22 · Source
When you need this permit
- A complete Sign Application of the correct type (Temporary (T), Seasonal (S), Permitted (P), or Conditional (C-1/C-2)) matching the underlying use, available from the Zoning Administrator per Richfield City Code 17.17.070
- A valid Building Permit, reviewed and approved by the City's Building Official, for any sign that is erected, moved, reconstructed, enlarged, or structurally altered and is subject to the Building Code (e.g., wall-mounted signs, signs with footings/foundations, or electrically-connected signs), per 17.17.040 — the same Large/Small Building Permit process documented in the residential-building-permit entry of this file
- A valid business license covering the property/use, per Richfield City Code 17.17.050 (Valid Business License Required)
- For a Temporary (T) Use sign: removal within forty-five (45) calendar days of Zoning Administrator approval, per 17.17.080; for a Seasonal (S) Use sign: removal within ninety (90) calendar days
- No permit is required for holiday signs or signs for community-hosted events, provided they are removed within ten (10) days of the holiday/event, per 17.17.080
- Table 20-2 (Table of Exempt Signs), cross-referenced at 17.17.260, exempts specific sign types outright from any Sign Application — including address numbers, real estate/open-house signs meeting size limits, political signs meeting size/timing limits, window signs, vehicle signs, and several others — provided the sign is not otherwise a prohibited sign under 17.17.190
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Inspection (when a Building Permit is triggered)
Per Richfield City Code 17.17.040, the Building Official shall inspect or re-inspect any sign for which a Building Permit has been issued and for which an inspection is required, to ensure conformance with the Land Use Ordinances and the adopted Building Code. No separate inspection is described for signs that only require a Sign Application (i.e., signs not subject to the Building Code).
See the full Richfield inspection guide — scheduling & re-inspection fees →
Tips
- Richfield's Sign chapter (17.17) is unusually detailed for a city this size: it defines a full set of approval tracks (Temporary, Seasonal, Permitted, Conditional) mirroring the same T/S/P/C-1/C-2 use-category framework the Zoning Ordinance uses for land uses generally, rather than treating signs as a single undifferentiated permit.
- Table 20-2 (Table of Exempt Signs), per 17.17.260, exempts many everyday sign types outright — address numbers, one unlighted 'Hours of Operation' sign per entrance (max 1 sq ft), residential nameplates (max 2 sq ft), real estate/open-house signs (max 6 sq ft / 4 ft height, removed within 30 days of sale/lease), political signs (max 12 sq ft / 4 ft height, posted no earlier than 45 days before and removed within 10 days after an election), and window signs no larger than the window itself (not allowed in residential zones) — confirm against this table before assuming a Sign Application is required at all.
- A sign that will be wall-mounted, have footings/a foundation, or have electrical connections still needs a Building Permit under 17.17.040 even if it also qualifies for a Temporary/Seasonal/Permitted Sign Application — the two tracks are not mutually exclusive.
- No dedicated Sign Application fee amount could be independently verified: the city's fee-bearing documents are hosted on DocHub, whose client-rendered viewer blocks unauthenticated automated PDF extraction — the same pre-existing gap documented for the residential-building-permit, ev-charger-permit, and solar-pv-permit entries in this file. Call the Zoning Administrator (435-896-6439) to confirm the current fee before applying.
- Richfield's full Title 17 Zoning Ordinance text (including Chapter 17.17) is hosted on hosting.civiclinq.com/richfield, a client-side-rendered single-page application; a static/automated fetch returns only an empty HTML shell (confirmed 2026-07-22, consistent with the same gap already documented in this file's localAmendments for Title 16). The chapter text cited in this entry was obtained by live-rendering the site in an interactive browser session and reading the rendered DOM directly, not via automated fetch.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Richfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Richfield
Sign Permit in other cities
Compare sign permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Richfield project checklist
Describe your project once and get every permit, document, and fee it triggers in Richfield — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →