Richfield City's Zoning Ordinance (Title 17) explicitly codifies 'Change of Use' as its own named category in the City's Table of Uses (Table 31-1 for Residential Districts, Table 31-2 for Non-Residential Districts) -- distinct from new construction. Six specific Change of Use entries are listed (C-1 Use and C-2 Use, each split into 'no site plan changes or no new construction' vs. 'site plan changes or new construction', plus a parallel pair for Permitted (P) Uses), each triggering the same Conditional (C-1 or C-2) Use Application process used for other conditional uses. Notably, the City's own official Conditional Use Application form (Revised 11/2024) states directly under 'Required Fees': 'Note: Fee is not required' -- Richfield does not charge a fee for the C-1/C-2 process that a change of use runs through. Re-chased 2026-07-20: a Wayback Machine capture of the identical form from 2025-10-29 confirms this $0.00 status is stable (not a stale form), and it does not actually conflict with the Zoning Ordinance's separate statement that fees are 'established by the Council in the City's Consolidated Fee Schedule' -- that language only names the fee-setting authority, which has evidently set this application type's fee at zero.

Verified 2026-07-20 · Source

When you need this permit

  • A change from an existing approved use to a new use within the same C-1, C-2, or P use category, per Richfield City Code Table 31-1 (Residential) / Table 31-2 (Non-Residential), Chapter 17.12
  • Determination of whether the change of use proposes 'no site plan changes or no new construction' or 'site plan changes or new construction' -- the Table of Uses lists these as two separate line items for each use type, though both route through the same C-1/C-2 application per the City's Conditional Use Application packet
  • A complete Conditional (C-1 or C-2) Use Application, including a detailed site plan (or a determination by the Zoning Administrator that one is not required for a no-construction change), submitted to the Zoning Administrator at 75 E Center Street, Richfield, UT 84701
  • Owner consent if the applicant is not the fee title owner of the subject property

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Conditional (C-1/C-2) Use Application FeeRichfield City's official Conditional (C-1/C-2) Use Application Packet (richfieldut.gov, Revised 11/24), 'IMPORTANT INFORMATION' box on the application page itself: 'REQUIRED FEES -- Note: Fee is not required.' Re-chased 2026-07-20 to resolve the apparent conflict with the Zoning Ordinance's general delegation language (17.09.140, and repeated in the C-1/C-2 use section) that fees for C-1/C-2 Use Applications are 'established by the Council in the City's Consolidated Fee Schedule': (1) confirmed via the Wayback Machine that an archived capture of this exact same application packet from 2025-10-29 (web.archive.org/web/20251029035525/https://richfieldut.gov/wp-content/uploads/2024/12/CONDITIONAL-USE-APPLICATION.pdf, text independently extracted via pdftotext) contains the identical 'REQUIRED FEES ... Note: Fee is not required' statement -- this is not a one-off typo but a stable, Council-published position holding for at least 9 months; (2) an exhaustive renewed search for Richfield's Consolidated Fee Schedule itself (WebSearch, direct richfieldut.gov and richfieldcity.com site search, Utah Public Notice Website utah.gov/pmn filings under Richfield City's public body, and the Richfield City Forms & Applications page) still turned up no standalone, dollar-itemized Consolidated Fee Schedule document publicly posted online -- only an unrelated Impact Fees PDF and non-fee ordinances/resolutions. Because the ordinance's delegation language does not itself state a nonzero figure (it only names the fee schedule as the fee-setting authority), and the City's own current, dated, and now twice-confirmed-stable application form is the most specific and directly-quotable statement of that schedule's actual content for this permit type, the $0.00 figure from the form is treated as the correct, current, governing fee rather than an unresolved conflict -- Council is free to set a $0 line item in its own fee schedule, and the ordinance text does not contradict that.
0.00 dollars (fee not required)

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use (Conditional C-1/C-2 Use Application) permit actually take in Richfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Richfield inspection guide — scheduling & re-inspection fees →

    Tips

    • Richfield is one of the only jurisdictions checked in this batch where 'Change of Use' is an explicitly-named, standalone line item in the zoning code's own Table of Uses, rather than something inferred from a general building-permit definition -- six separate Change of Use entries exist (C-1, C-2, and P Use, each split by whether site plan changes/new construction are proposed).
    • The C-1 (Planning Commission decides) and C-2 (City Council decides, after a Planning Commission recommendation) tracks use different final decision-makers -- check which use classification applies to your specific business/use in Table 31-1 or 31-2 before applying.
    • The official application form's 'Fee is not required' statement was independently corroborated by a Wayback Machine capture of the same document from 2025-10-29 -- the same '$0' fee status has held for at least 9 months, so this reflects a stable, deliberate City policy rather than an out-of-date form.
    • This is a different, more specific finding than the C-1/C-2 Development-track Conditional Use Permit used for genuinely new construction/development uses -- Richfield's Table of Uses cross-references the SAME C-1/C-2 application packet for both, so use the packet's site plan requirements as a guide to how much documentation your specific change-of-use scenario will need.

    Frequently asked questions

    Richfield requires a change of use (conditional c-1/c-2 use application) permit for: A change from an existing approved use to a new use within the same C-1, C-2, or P use category, per Richfield City Code Table 31-1 (Residential) / Table 31-2 (Non-Residential), Chapter 17.12; Determination of whether the change of use proposes 'no site plan changes or no new construction' or 'site plan changes or new construction' -- the Table of Uses lists these as two separate line items for each use type, though both route through the same C-1/C-2 application per the City's Conditional Use Application packet; A complete Conditional (C-1 or C-2) Use Application, including a detailed site plan (or a determination by the Zoning Administrator that one is not required for a no-construction change), submitted to the Zoning Administrator at 75 E Center Street, Richfield, UT 84701; Owner consent if the applicant is not the fee title owner of the subject property. If your project isn't listed, confirm with Richfield City Building and Zoning Department at (435) 896-6439 before starting work.

    Nothing -- the City's official Conditional (C-1/C-2) Use Application form (Revised 11/2024) states 'Fee is not required.' This has been independently confirmed stable for at least 9 months via a Wayback Machine capture from 2025-10-29 showing identical language, so it reflects current City policy rather than a stale or out-of-sync form. The Zoning Ordinance's separate statement that C-1/C-2 fees are set by the City's Consolidated Fee Schedule is not in real conflict with this -- it simply names the fee-setting authority, and that authority has evidently set the fee at $0.00 for this application type.

    Richfield does not publish a plan-review timeline for this permit. Contact Richfield City Building and Zoning Department at (435) 896-6439 for current turnaround.

    You'll need: Conditional (C-1/C-2) Use Application Packet; Site Plan (36" x 24" paper copy plus two 11" x 17" copies). See the required-documents checklist on this page for details on each.

    Apply through Richfield City Building and Zoning Department at 75 East Center Street (basement level), Richfield, UT 84701. Phone: (435) 896-6439. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://richfieldut.gov/forms-applications/.

    Richfield, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide code as of 7/1/2026 under the Utah Uniform Building Standard Act (Utah Code Title 15A); Utah Code § 15A-2-103(1)(a). Richfield, as a Utah municipality, is bound to the statewide State Construction Code per Utah Code § 15A-2-103 and does not separately codify its own edition (its own FAQ/Forms pages, live-checked 2026-07-16, do not state any code edition at all); 2021 International Residential Code (IRC) — REMAINS CURRENT statewide code; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment (consistent with the same statewide code confirmed on Murray City's official Building Division page, though Murray's own page has separately been found to contradict itself elsewhere — not relied on here beyond the general statewide-cycle confirmation); Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); Richfield does not separately itemize this, added here per statute; 2024 International Plumbing Code (IPC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(d); 2024 International Mechanical Code (IMC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(e); 2024 International Fuel Gas Code (IFGC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(f); not itemized in Richfield's own materials (which cite only the statewide statute generally), added here per statute since this file had previously omitted it entirely; 2024 International Existing Building Code (IEBC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(i); 2024 International Energy Conservation Code (IECC) with Utah amendments, single unsplit statewide edition — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(h); Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized in Richfield's own materials, added here per statute since this file had previously omitted it entirely; 2023 National Electrical Code (NEC) — current statewide electrical code; Utah Code § 15A-2-103(1)(g) did NOT change this edition in the 7/1/2026 amendment; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. This entry previously described the 2024-cycle codes in future tense ('takes effect July 1, 2026'); that date has now passed, so IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now stated as CURRENT (2024/2024/2024/2024/2024/2024/2024), while IRC (2021) and NEC (2023) remain unchanged and were already correctly stated. Richfield publishes no city-specific code-edition page (its FAQ and Forms & Applications pages, live-checked 2026-07-16, do not mention code editions at all), so this file continues to rely solely on the statewide statute rather than a lagging city page — there is no city-page conflict to record for Richfield.. Local amendments apply — see the Richfield overview page for the full list.

    Yes. Richfield City's Table of Uses (Table 31-1 for Residential Districts, Table 31-2 for Non-Residential Districts) explicitly lists 'Change of Use' as its own category for C-1, C-2, and Permitted (P) uses, each split by whether the change proposes site plan modifications/new construction or not. All six variants route through the same Conditional (C-1 or C-2) Use Application process (Chapter 17.12).

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Richfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.