Change of Use (Conditional C-1/C-2 Use Application) — Richfield, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://richfieldut.gov/wp-content/uploads/2024/12/CONDITIONAL-USE-APPLICATION.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use (Conditional C-1/C-2 Use Application) in Richfield, Utah
Richfield City's Zoning Ordinance (Title 17) explicitly codifies 'Change of Use' as its own named category in the City's Table of Uses (Table 31-1 for Residential Districts, Table 31-2 for Non-Residential Districts) -- distinct from new construction. Six specific Change of Use entries are listed (C-1 Use and C-2 Use, each split into 'no site plan changes or no new construction' vs. 'site plan changes or new construction', plus a parallel pair for Permitted (P) Uses), each triggering the same Conditional (C-1 or C-2) Use Application process used for other conditional uses. Notably, the City's own official Conditional Use Application form (Revised 11/2024) states directly under 'Required Fees': 'Note: Fee is not required' -- Richfield does not charge a fee for the C-1/C-2 process that a change of use runs through. Re-chased 2026-07-20: a Wayback Machine capture of the identical form from 2025-10-29 confirms this $0.00 status is stable (not a stale form), and it does not actually conflict with the Zoning Ordinance's separate statement that fees are 'established by the Council in the City's Consolidated Fee Schedule' -- that language only names the fee-setting authority, which has evidently set this application type's fee at zero.
Verified 2026-07-20 · Source
When you need this permit
- A change from an existing approved use to a new use within the same C-1, C-2, or P use category, per Richfield City Code Table 31-1 (Residential) / Table 31-2 (Non-Residential), Chapter 17.12
- Determination of whether the change of use proposes 'no site plan changes or no new construction' or 'site plan changes or new construction' -- the Table of Uses lists these as two separate line items for each use type, though both route through the same C-1/C-2 application per the City's Conditional Use Application packet
- A complete Conditional (C-1 or C-2) Use Application, including a detailed site plan (or a determination by the Zoning Administrator that one is not required for a no-construction change), submitted to the Zoning Administrator at 75 E Center Street, Richfield, UT 84701
- Owner consent if the applicant is not the fee title owner of the subject property
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Richfield inspection guide — scheduling & re-inspection fees →
Tips
- Richfield is one of the only jurisdictions checked in this batch where 'Change of Use' is an explicitly-named, standalone line item in the zoning code's own Table of Uses, rather than something inferred from a general building-permit definition -- six separate Change of Use entries exist (C-1, C-2, and P Use, each split by whether site plan changes/new construction are proposed).
- The C-1 (Planning Commission decides) and C-2 (City Council decides, after a Planning Commission recommendation) tracks use different final decision-makers -- check which use classification applies to your specific business/use in Table 31-1 or 31-2 before applying.
- The official application form's 'Fee is not required' statement was independently corroborated by a Wayback Machine capture of the same document from 2025-10-29 -- the same '$0' fee status has held for at least 9 months, so this reflects a stable, deliberate City policy rather than an out-of-date form.
- This is a different, more specific finding than the C-1/C-2 Development-track Conditional Use Permit used for genuinely new construction/development uses -- Richfield's Table of Uses cross-references the SAME C-1/C-2 application packet for both, so use the packet's site plan requirements as a guide to how much documentation your specific change-of-use scenario will need.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Richfield building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Richfield
Change of Use (Conditional C-1/C-2 Use Application) in other cities
Compare change of use (conditional c-1/c-2 use application) fees across Utah →