Skip to main content
PermitBase

EV Charger / EVSE Permit in Richfield, Utah

Richfield City has not published a fee schedule, distinct EV charger line item, or general electrical permit fee amount anywhere on its official website, forms/applications page, FAQ page, or its 2021 Plan Review and Building Inspection Services RFP. Electrical work, including EV charger installation, still requires a permit from the Richfield City Building Department, but the applicable fee could not be located from a primary source after a real search — it is not on the Forms & Applications page, the FAQ page, or in any publicly posted fee resolution.

Reviewed 2026-07-23 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Richfield City
  • Contact the Richfield City Building and Zoning Department directly to confirm permit requirements and the applicable fee, as no fee schedule is published online

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical/Building Permit feeNo fee schedule, resolution, or ordinance publishing electrical or EV charger permit fee amounts could be located on richfieldut.gov (Forms & Applications, Frequently Asked Questions, Contacts pages) or in the city's 2021 Plan Review and Building Inspection Services RFP. Richfield City's own residential-building-permit entry in this dataset likewise has no published fee figure. Applicants should contact the Building and Zoning Department at 435-896-6439 for the current fee. Re-chased 2026-07-23: DocHub's own download/export/pdf/pages API endpoints for Richfield's fee-bearing PDFs all return the identical blocked document-metadata JSON regardless of path; a Wayback CDX sweep of all 71 distinct PDFs ever captured on richfieldut.gov turns up no fee-schedule document; and a Utah Public Notice Website (utah.gov/pmn) search for a Richfield-specific Consolidated Fee Schedule notice returns none — see the residential-building-permit entry's fully-detailed 2026-07-23 re-chase note for the exhaustive avenue list. Fee gap remains unrecoverable.
Not published

Review timeline

Plan reviewRichfield’s published plan-review target
10–14 business days

How long did your EV Charger / EVSE Permit permit actually take in Richfield?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Inspection by the Richfield City Building Department (or its contracted plan review/inspection provider) of the charger circuit and panel work.

See the full Richfield inspection guide — scheduling & re-inspection fees →

Tips

  • Richfield does not publish a fee schedule online for electrical or EV charger permits — call the Building and Zoning Department (435-896-6439) before applying to confirm the current fee.
  • Permits are submitted through the city's CityInspect online portal referenced on the Forms & Applications page.
  • Closed 2026-07-23: a residential EV charger install uses the same 14-business-day statutory plan-review floor (Utah Code § 10-20-909) as the Residential Building Permit and Solar PV Permit entries in this file, since all three route through the same general Building Permit trigger per Richfield's official FAQ; a commercial EV charger install instead uses the city's 10-business-day commercial plan-review commitment (2021 Plan Review and Building Inspection Services RFP).

Frequently asked questions

Richfield requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Richfield City; Contact the Richfield City Building and Zoning Department directly to confirm permit requirements and the applicable fee, as no fee schedule is published online. If your project isn't listed, confirm with Richfield City Building and Zoning Department at (435) 896-6439 before starting work.

No distinct EV charger fee — or general electrical permit fee — is published on Richfield City's website. Contact the Building and Zoning Department directly for the current amount before applying.

Richfield does not publish an EV-charger-specific timeline, but since EV charger installation is electrical work covered by the general Building Permit, the same governing timelines apply as for that permit: 14 business days (after a 3-business-day completeness screening) for a residential install, under the statewide floor of Utah Code § 10-20-909, or 10 business days for a commercial install, under the city's 2021 Plan Review and Building Inspection Services RFP commitment.

You'll need: Building/Electrical Permit Application. See the required-documents checklist on this page for details on each.

Richfield requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Richfield City Building and Zoning Department ((435) 896-6439).

Apply through Richfield City Building and Zoning Department at 75 East Center Street (basement level), Richfield, UT 84701. Phone: (435) 896-6439. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://richfieldut.gov/forms-applications/.

Richfield, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide code as of 7/1/2026 under the Utah Uniform Building Standard Act (Utah Code Title 15A); Utah Code § 15A-2-103(1)(a). Richfield, as a Utah municipality, is bound to the statewide State Construction Code per Utah Code § 15A-2-103 and does not separately codify its own edition (its own FAQ/Forms pages, live-checked 2026-07-16, do not state any code edition at all); 2021 International Residential Code (IRC) — REMAINS CURRENT statewide code; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment (consistent with the same statewide code confirmed on Murray City's official Building Division page, though Murray's own page has separately been found to contradict itself elsewhere — not relied on here beyond the general statewide-cycle confirmation); Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); Richfield does not separately itemize this, added here per statute; 2024 International Plumbing Code (IPC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(d); 2024 International Mechanical Code (IMC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(e); 2024 International Fuel Gas Code (IFGC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(f); not itemized in Richfield's own materials (which cite only the statewide statute generally), added here per statute since this file had previously omitted it entirely; 2024 International Existing Building Code (IEBC) — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(i); 2024 International Energy Conservation Code (IECC) with Utah amendments, single unsplit statewide edition — CURRENT statewide code as of 7/1/2026; Utah Code § 15A-2-103(1)(h); Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized in Richfield's own materials, added here per statute since this file had previously omitted it entirely; 2023 National Electrical Code (NEC) — current statewide electrical code; Utah Code § 15A-2-103(1)(g) did NOT change this edition in the 7/1/2026 amendment; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. This entry previously described the 2024-cycle codes in future tense ('takes effect July 1, 2026'); that date has now passed, so IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now stated as CURRENT (2024/2024/2024/2024/2024/2024/2024), while IRC (2021) and NEC (2023) remain unchanged and were already correctly stated. Richfield publishes no city-specific code-edition page (its FAQ and Forms & Applications pages, live-checked 2026-07-16, do not mention code editions at all), so this file continues to rely solely on the statewide statute rather than a lagging city page — there is no city-page conflict to record for Richfield.. Local amendments apply — see the Richfield overview page for the full list.