Skip to main content
PermitBase

Unincorporated Sevier County building permits

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Sevier County, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
250 North Main Street, Suite 131, P.O. Box 517, Richfield, UT 84701
Phone
(435) 893-0420
Office hours
Mon–Fri 8:00 AM – 5:00 PM (lunch 12:00–1:00 PM, per the county's official 'Applying for a Building Permit' cheat sheet)

Inspection guide

See how inspections work in Unincorporated Sevier County — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); the statewide 2024-cycle code update took effect July 1, 2026, superseding the 2021 IBC previously in force.
  • 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); the IRC remains the 2021 edition, unchanged by the July 1, 2026 statewide update cycle.
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective since July 1, 2026, superseding the 2021 IPC.
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective since July 1, 2026, superseding the 2021 IMC.
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective since July 1, 2026, superseding the 2021 IEBC.
  • 2024 International Energy Conservation Code (IECC) with Utah amendments — Utah Code § 15A-2-103(1)(h); effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split.
  • 2023 National Electrical Code (NEC) — current statewide electrical code, unchanged in the July 1, 2026 statewide update.
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f), effective since July 1, 2026.
  • 2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n), effective since July 1, 2026.
  • Sevier County Code Chapter 150 (Buildings and Construction), §§ 150.01–150.47 — the local building-permit administration ordinance, hosted on the county's official code-hosting site… Show full text

    Sevier County Code Chapter 150 (Buildings and Construction), §§ 150.01–150.47 — the local building-permit administration ordinance, hosted on the county's official code-hosting site (codelibrary.amlegal.com/codes/seviercountyut), whose published table of contents lists sections 150.01–150.08, 150.20–150.22, and 150.35–150.47. Section 150.20 (Building Permit Required for All Buildings) and its penalty language ('investigation fee...same as the permit fee...double fee') are independently confirmed via the county's own official 'Obtaining a Building Permit' webpage, which quotes this requirement directly.

  • NOTE (added 2026-07-16): The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC replacing 2021 editions) took effect 15 days ago per Utah Code § 15A-2-103 (version effective 7/1/2026,… Show full text

    NOTE (added 2026-07-16): The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC replacing 2021 editions) took effect 15 days ago per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; next version's editions confirmed identical). 2021 IRC and 2023 NEC are unchanged by this transition. Live-checked the Sevier County 'Obtaining a Building Permit' page today — it cites no code edition years at all, so no page-lag discrepancy to flag there. The International Fire Code is NOT adopted by § 15A-2-103 (it lives in Title 15A Chapter 5) and is not referenced elsewhere in this record.

Permit types & fees

Unincorporated Sevier County's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Unincorporated Sevier County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Unincorporated Sevier County lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
12units

12 buildings · $4.8M valuation

Trailing 12 months
115units

12 of 12 months reported · #59 in Utah coverage by units

Year to date (2026 YTD through 2026-07)
81units

81 buildings · $36.4M valuation

Full year 2025
97units

97 buildings · $43.6M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder of Sevier County outside incorporated cities/towns (Richfield, Salina, Monroe, Aurora, Elsinore, Redmond, Sigurd, Central Valley, Annabella, Koosharem, Glenwood, Joseph, Sevier). Richfield is a separate jurisdiction file (richfield.json) using the same countyFips (049/041) confirmed via US Census Bureau county FIPS reference.

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Sevier County Building, Planning and Zoning administers building permits directly for all unincorporated areas of the county — it is a genuine county-run building program, not a contracted-out or city-delegated function. Incorporated cities/towns within Sevier County (Richfield, Salina, Monroe, Glenwood, Sigurd, and others) either issue their own permits (e.g., Richfield) or require their own municipal zoning approval before a county building permit is processed.
  • Applicants must obtain zoning approval FIRST, before applying for a county building permit — for parcels inside Glenwood Town, Monroe City, Sigurd Town, or Richfield City, use that municipality's own zoning permit; for other incorporated towns, use the county's 'Municipality Zoning Permit' form; for unincorporated land, the Unincorporated Area Signature Sheet substitutes for municipal zoning sign-off.
  • Building permits and inspection scheduling are both handled online via the utah.cityinspect.com portal (registration link on the county's Obtaining a Building Permit page).
  • No building-permit fee schedule with dollar amounts is published on the county's website as of 2026-07-08. The only public 'Fee Schedule.pdf' (linked from the Planning and Zoning page) is Appendix C of the county's Land Use ordinance and covers zoning/land-use fees only (Board of Adjustment appeal $200, Conditional Use Permit $35–$175, PUD Application $300, Subdivision Application $100–$300+$25/lot, Temporary Use Permit $75, Zoning Change $300, etc.) — none of these are building-permit fees. Commission Resolution 2025-3-1 (adopted 3/24/2025) updated 'the County Fee Schedule' but its itemized exhibit was not independently locatable. Call the Building Department at (435) 893-0420 for current building-permit fee amounts.
  • Sevier County's own Code of Ordinances Chapter 150 (Buildings and Construction) is hosted at codelibrary.amlegal.com, where the public listing exposes the section-title table of contents; the section numbers/titles (150.01–150.08, 150.20–150.22, 150.35–150.47) are confirmed, but the section body text is not readily retrievable there.
  • Failure to obtain a permit before starting work triggers a double fee: an investigation fee equal to the permit fee is added on top of the permit fee itself, per the county's official Building Permit page.
  • New residential construction in the unincorporated county requires the 'Unincorporated Area Signature Sheet,' collecting sign-offs from County Planning/Zoning/Flood, the Road Department (road encroachment and addressing), the Utah State Division of Water Rights (Order of the State Engineer as proof of water), the Central Utah Health Department (septic tank approval), the applicable power utility (Rocky Mountain Power, Monroe City Power, or Garkane Energy), the applicable gas utility (Enbridge Gas Utah or propane), and — if within Venice Drainage District #1 or Aurora Drainage District #4 boundaries — that district's board.
  • No Sevier County-specific plan-review turnaround time is published; the statutory floor of Utah Code § 17-36-55(3)(a) — 14 business days after a complete building-permit application is submitted, for one/two-family dwellings and townhomes — is used as the verified reviewTimelineDays basis, consistent with the county-specific statute (not § 10-20-909, which binds only municipalities).
  • 2026-07-16 codesAdopted refresh: this record previously described the 2024-cycle codes in future tense ('takes effect July 1, 2026') though the date has now passed — flipped IBC/IPC/IMC/IECC/IEBC to state 2024 editions as current, 2021 IRC and 2023 NEC unchanged. Added IFGC and ISPSC (2024), which were missing from this record entirely, sourced directly to Utah Code § 15A-2-103(1)(f)/(n) since the county's own pages don't enumerate them either.
  • Read Sevier County's code on codelibrary.amlegal.com in an ordinary web browser: the section body text renders there, where simpler tools return only the table of contents. Doing so surfaces § 150.01's locally codified '2018 edition' IBC text — note the governing edition is the 2024 IBC, and the commercial-building-permit and change-of-use-permit entries lead with that — plus § 150.20's 120-square-foot permit threshold and no-charge agricultural exemption, § 150.21's storage-container rule, and Chapter 35 (Fee Schedules) §§ 35.01-35.04, whose Editor's Note ('The fees will be published separately') confirms itemized department fees are deliberately kept out of the code and set by separate Commission resolution. That separately-published fee schedule is not available anywhere public — not in the county's archives, not on the utah.cityinspect.com portal, which is login-gated with no public fee page, and not attached to the March 24, 2025 Commission agenda packet. The county-wide building-permit fee gap therefore stands, affecting the residential, commercial, tenant-improvement, fire-sprinkler/alarm, and change-of-use permit types in this record. On the fire side, Utah Admin. Code R710-9-8's SFM/LFA plan-review split does not address ordinary private commercial construction, so the reviewing authority for that work is also unresolved.

Comparable nearby cities

Richfield
Both in Sevier County7 shared permit types
Compare fees →