Unincorporated Sevier County building inspections
Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Sevier County, Utah.
Reviewed 2026-07-08 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 250 North Main Street, Suite 131, P.O. Box 517, Richfield, UT 84701
- Phone
- (435) 893-0420
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM (lunch 12:00–1:00 PM, per the county's official 'Applying for a Building Permit' cheat sheet)
- Website
- Official site
Published scheduling rules
- Building permits and inspection scheduling are both handled online via the utah.cityinspect.com portal (registration link on the county's Obtaining a Building Permit page). (General)
Inspection sequence
Applies to: Residential Building Permit
- 1
Footing/Foundation Reinforcement
Inspection of footing reinforcement before pouring concrete footings, and foundation wall reinforcement before pouring concrete walls (or any other rebar inspection), per the county's official Required Inspections page.
- 2
Under-Slab / Rough Plumbing, Electrical, Mechanical
Under concrete floor (plumbing) inspection, intermediate inspection, rough framing and sheathing, rough plumbing, rough electrical, and rough mechanical work, per the county's official Required Inspections page.
- 3
Insulation / Pre-Cover Notifications
Insulation inspection; notify the building inspector before laying brick, installing siding, or applying other exterior finishes; notify before applying roofing; notify when work starts on any fireplace or chimney.
- 4
Rough Drywall / Utility Lines
Inspection of rough drywall before taping/mudding; inspection of water line, sewer line, and gas line before backfilling.
- 5
Masonry / Bond Beam
4-foot masonry wall inspection, bond beam inspection, and general masonry inspection where applicable.
- 6
Final
Final inspection — all work complete, per the county's official Required Inspections page.
Applies to: Commercial Building Permit
- 1
Footing/Foundation Reinforcement
Inspection of footing reinforcement before pouring concrete footings, and foundation wall reinforcement before pouring concrete walls.
- 2
Under-Slab / Rough Plumbing, Electrical, Mechanical
Under concrete floor (plumbing) inspection, rough framing and sheathing, rough plumbing, rough electrical, and rough mechanical work.
- 3
Insulation / Pre-Cover Notifications
Insulation inspection; notify the building inspector before laying brick, installing siding, or applying other exterior finishes.
- 4
Final
Final inspection — all work complete, per the county's official Required Inspections page.
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Rough-In (Framing/Electrical/Plumbing/Mechanical)
Scope-dependent rough-in inspection before any work is concealed.
- 2
Final
Final inspection — all work complete, per the county's official Required Inspections page.
Applies to: Fire Sprinkler & Fire Alarm Permit
- 1
Rough-In (Sprinkler Piping / Alarm Wiring)
Not separately published by the county; follows the standard rough-in inspection step documented for this jurisdiction's commercial-building-permit entry before piping or wiring is concealed.
- 2
Final / Acceptance Test
Final inspection and system acceptance test (hydrostatic test for sprinkler piping, functional test for alarm devices) — not separately documented by the county beyond the standard Final inspection step used across this file's other commercial permit-type entries.
Final inspection only: Change of Use / Certificate of Occupancy, EV Charger / EVSE Permit, Solar PV Installation Permit
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Sevier County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Sevier County building permits
Get alerts for Unincorporated Sevier County