Commercial Building Permit in Unincorporated Sevier County, Utah
Required for new commercial building construction in unincorporated Sevier County. The county's Building, Planning and Zoning Department administers commercial permits through the same utah.cityinspect.com portal and the same Building Official (Jason Mackelprang) used for residential permits — the department's own webpages confirm no distinct commercial process, fee schedule, or plan-review commitment is published separately from residential. The department's index page states directly: 'The building official is responsible for overseeing all commercial and residential building permit regulations, fees, and inspections.'
Reviewed 2026-07-20 · Source
When you need this permit
- New commercial construction
- "Building plans for new homes and commercial buildings must be drawn to scale" — quoted from the county's official Building Plans page, which applies a single unified requirements list to both residential and commercial plans
- Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
- Zoning approval obtained PRIOR to applying for a building permit and attached to the permit application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing/Foundation Reinforcement
Inspection of footing reinforcement before pouring concrete footings, and foundation wall reinforcement before pouring concrete walls.
- 2
Under-Slab / Rough Plumbing, Electrical, Mechanical
Under concrete floor (plumbing) inspection, rough framing and sheathing, rough plumbing, rough electrical, and rough mechanical work.
- 3
Insulation / Pre-Cover Notifications
Insulation inspection; notify the building inspector before laying brick, installing siding, or applying other exterior finishes.
- 4
Final
Final inspection — all work complete, per the county's official Required Inspections page.
See the full Unincorporated Sevier County inspection guide — scheduling & re-inspection fees →
Tips
- "The building official is responsible for overseeing all commercial and residential building permit regulations, fees, and inspections" — quoted directly from Sevier County's Building/Planning/Zoning department index page; there is no separate commercial division or process.
- "Building plans for new homes and commercial buildings must be drawn to scale" — the county publishes one unified plans checklist covering both, per its official Building Plans page.
- No dedicated commercial building-permit fee amount or valuation-based fee table could be independently verified: the only public 'Fee Schedule.pdf' linked from the county's Planning and Zoning page covers zoning/land-use fees only (Board of Adjustment appeal, conditional use permit, PUD, subdivision, temporary use, zoning change, etc.), not building-permit fees. County Commission Resolution 2025-3-1 ('Updating the County Fee Schedule,' adopted 3/24/2025) is referenced in the March 24, 2025 Commission Minutes but its itemized exhibit was not independently locatable — the same gap already documented for the residential-building-permit entry in this file.
- 2026-07-23 re-chase (still unrecoverable): the same new avenues documented in this file's residential-building-permit entry were tried for commercial fees specifically — the CityInspect portal (login-gated, no public fee page), a Wayback CDX orphan-PDF scan, the March 24, 2025 Commission agenda packet (no exhibit attached), a fresh visual re-render of Fee Schedule.pdf, and a full read of Sevier County Code Chapter 35 (Fee Schedules), which confirms by its own Editor's Note ('The fees will be published separately') that itemized fees are deliberately kept out of the codified ordinance text and set instead by a separately-published Commission-approved schedule that remains unlocated online. No commercial-specific plan-review turnaround time was found either.
- No standalone Change-of-Use Permit or Certificate-of-Occupancy-verification permit/fee, separate from this Building Permit, is published for unincorporated Sevier County. The county's Fee Schedule (Appendix C, fetched from its Planning and Zoning page) lists Board of Adjustment Appeal ($200), Conditional Use Permit (tiered $35/$100/$175, apparently cell-tower-scoped per a handwritten annotation on the source document), Excavation Bond, PUD ($300), Subdivision, Temporary Use Permit ($75), Youth Home ($450), and Zoning Change ($300) — no 'change of use,' 'occupancy,' or 'land use permit' line item appears. Sevier County's Zoning Ordinance (Chapter 14.28 Nonconforming Uses) only restricts EXTENSION or ENLARGEMENT of a nonconforming use without a special permit from the Board of Adjustment (§ 14.28.010, citing § 14.20.040) — it does not create a distinct fee or application for an ordinary conforming-to-conforming change of use. Sevier County Code § 150.01 (Ord. 2022-2-1, passed 2-28-2022) locally codifies the International Building Code as the '2018 edition, as amended' and contains no locally amended Certificate of Occupancy or change-of-occupancy section (full section text confirmed by live browser render of codelibrary.amlegal.com, 2026-07-23, which previously returned only section titles to automated fetch tools) — but the GOVERNING edition for enforcement is the 2024 IBC, which superseded the 2021 IBC statewide effective July 1, 2026 under Utah Code § 15A-2-103(1)(a); the county has not re-codified § 150.01 to reflect the statewide edition change. Any change-of-occupancy review follows the 2024 IBC's own default provisions administered through the same general Building Permit. Confirm with the Building Official, (435) 893-0420, before assuming no permit is needed for a specific change-of-use project.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Sevier County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Sevier County.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Unincorporated Sevier County
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Sevier County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Sevier County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →