This is PermitBase’s published record for Park City as of 2026-07-08. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Park City building permits
VerifiedPark City, Utah — as published 2026-07-08.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family and multi-family residential construction and any work regulated by the adopted 2021 IRC/IBC that is not exempt under IBC/IRC Sec. 105.2 (e.g., carpeting, painting, wallpapering, cabinets, countertops are exempt; drywall work generally requires a permit). Park City's fee is valuation-based (0.61% of total construction valuation) rather than a tiered table, plus a mandatory plan-check deposit and 65% plan-check fee.
Verified 2026-07-08 · Source
Requirements
- New single-family or multi-family residential construction
- Any work regulated by the adopted 2021 IRC/IBC that is not exempt under Sec. 105.2
- Application submitted through the City Inspect (MCI) online portal
- Compliance with the Wildland-Urban Interface Code (Sec. 11-21-1) where applicable, determined via the WUI worksheet as part of plan review
- Planning Department review for zoning compliance (setbacks, building height, design, building pad limits) per the Land Management Code
- Minimum submittal requirements for new structures, per Park City's official Building Plan Review guidance
Required documents
- RequiredCity Inspect (MCI) Building Permit ApplicationStarted online through City Inspect; new users must first register per Park City's 'How to Register for City Inspect (MCI)' guide. All permit types, scope of work, and project location are entered into the application.
- RequiredCompleteness ChecklistPark City's official checklist used by the Building Department to screen a submittal for completeness before beginning the plan review process, referenced on the Building Department's Forms, Codes & Resources page.
- OptionalWildland Urban Interface (WUI) WorksheetUsed to determine WUI Code (Sec. 11-21-1) applicability and requirements for the project as part of building permit plan review.
- RequiredConstruction Mitigation Plan (CMP)Reviewed by Community Code Compliance as part of the plan review process, per Park City's official Permit FAQs (covers Limits of Disturbance and Erosion Control alongside the CMP).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Single-Family / Multi-Family / Commercial) | 0.61% of total valuation of construction, minimum fee $83.00, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit.' Total valuation is calculated from the actual value of construction, excluding the value of on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water). |
| Plan Check Deposit | $500.00 (residential buildings); $2,000.00 (commercial buildings) | Park City Fee Schedule § 1.2.3(1): non-refundable deposit required at time of building permit application for buildings requiring plan checks; forfeited if permits are not issued. |
| Plan Check Fee | 65.0% of the building permit fee for that building (or $83.00/hour of Community Development staff time for 'identical plans' as defined in the Fee Schedule) | Park City Fee Schedule § 1.2.3(2). |
Electrical Permit
VerifiedRequired for electrical work in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation) rather than a flat per-Utah-municipality rate.
Verified 2026-07-08 · Source
Requirements
- New electrical circuits, wiring installations, or service upgrades not covered under an active building permit
- Application submitted through the City Inspect (MCI) online portal
Required documents
- RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect; new users must register first per Park City's official registration guide.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee | 1.32% of the total valuation of construction, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.5 'Electrical Permit.' |
Plumbing Permit
VerifiedRequired for plumbing installations and alterations in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation).
Verified 2026-07-08 · Source
Requirements
- New plumbing fixture installations, water heater installation/replacement, or water/sewer/gas line work not covered under an active building permit
- Application submitted through the City Inspect (MCI) online portal
Required documents
- RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee | 1.32% of the total valuation of construction, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.6 'Plumbing Permit.' |
Mechanical / HVAC Permit
VerifiedRequired for HVAC installations, replacements, and ductwork modifications in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation).
Verified 2026-07-08 · Source
Requirements
- Furnace, boiler, or air conditioning installation/replacement, or ductwork installation/major modification not covered under an active building permit
- Application submitted through the City Inspect (MCI) online portal
Required documents
- RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee | 1.32% of the total valuation of construction, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.4 'Mechanical Permit.' |
Demolition Permit
VerifiedRequired for demolition of structures in Park City. Fee is valuation-based (1.32% of the value of the demolition work).
Verified 2026-07-08 · Source
Requirements
- Demolition of an existing structure
- Application submitted through the City Inspect (MCI) online portal
Required documents
- RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit Fee | 1.32% of the total valuation of construction, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.10 'Demolition Permit Fee.' |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Park City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.