Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-16.

Park City building permits

Verified

Park City, Utah — as published 2026-07-16.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J, with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Park City's Building Department Forms, Codes & Resources page (live-checked 2026-07-16) states 'All codes to include Utah Amendments' and links to the State of Utah's code list rather than publishing a separate locally-itemized edition, consistent with the statewide adoption model used by other Utah jurisdictions in this corpus (e.g., Murray, Coalville).2021 International Residential Code (IRC) with Utah amendments — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition.Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized on Park City's own Forms, Codes & Resources page, added here per statute.2024 International Plumbing Code (IPC) with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here.2024 International Mechanical Code (IMC) with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here.2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not itemized on Park City's own Forms, Codes & Resources page, added here per statute since the City's own materials omit it.2024 International Energy Conservation Code (IECC), single unsplit statewide edition, with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here.2023 National Electrical Code (NEC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition.2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Park City's own Forms, Codes & Resources page, added here per statute since the City's own materials omit it.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Park City's own Forms, Codes & Resources page, added here per statute since the City's own materials omit it.International Wildland-Urban Interface Code (IWUIC), 2006 edition with State of Utah amendments, further amended and locally adopted by Park City in June 2020 — codified at Park City Municipal Code Sec. 11-21-1. Genuine local amendment: compliance is a required part of the building permit plan review process for applicable properties, per the city's official Wildland Urban Interface Code FAQ page. NOTE: the IWUIC is adopted under Utah Code § 15A-2-103(2), a distinct provision from the Subsection (1) code list above that allows local compliance agencies to adopt the 2006 IWUIC by local ordinance as a local amendment — it is unaffected by the Subsection (1) edition transition on 7/1/2026 and was not touched by this re-verification.NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Park City's Forms, Codes & Resources page (parkcity.org/services/building/forms/index.php) was live-checked 2026-07-16 and does not itemize specific code edition years at all — it states generically 'All codes to include Utah Amendments' and links to the state code, so no page-vs-statute lag could be detected; the statute is cited directly as governing throughout. Park City's substantial resort-town local amendments (WUI Code, Land Management Code Title 15, Fee Schedule) are unaffected and left untouched.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and multi-family residential construction and any work regulated by the adopted 2021 IRC / 2024 IBC that is not exempt under IBC/IRC Sec. 105.2 (e.g., carpeting, painting, wallpapering, cabinets, countertops are exempt; drywall work generally requires a permit). Park City's fee is valuation-based (0.61% of total construction valuation) rather than a tiered table, plus a mandatory plan-check deposit and 65% plan-check fee.

Verified 2026-07-08 · Source

Requirements

  • New single-family or multi-family residential construction
  • Any work regulated by the adopted 2021 IRC / 2024 IBC that is not exempt under Sec. 105.2
  • Application submitted through the City Inspect (MCI) online portal
  • Compliance with the Wildland-Urban Interface Code (Sec. 11-21-1) where applicable, determined via the WUI worksheet as part of plan review
  • Planning Department review for zoning compliance (setbacks, building height, design, building pad limits) per the Land Management Code
  • Minimum submittal requirements for new structures, per Park City's official Building Plan Review guidance

Required documents

  • RequiredCity Inspect (MCI) Building Permit ApplicationStarted online through City Inspect; new users must first register per Park City's 'How to Register for City Inspect (MCI)' guide. All permit types, scope of work, and project location are entered into the application.
  • RequiredCompleteness ChecklistPark City's official checklist used by the Building Department to screen a submittal for completeness before beginning the plan review process, referenced on the Building Department's Forms, Codes & Resources page.
  • OptionalWildland Urban Interface (WUI) WorksheetUsed to determine WUI Code (Sec. 11-21-1) applicability and requirements for the project as part of building permit plan review.
  • RequiredConstruction Mitigation Plan (CMP)Reviewed by Community Code Compliance as part of the plan review process, per Park City's official Permit FAQs (covers Limits of Disturbance and Erosion Control alongside the CMP).

Fee schedule

Fee typeAmountNotes
Building Permit Fee (Single-Family / Multi-Family / Commercial)0.61% of total valuation of construction, minimum fee $83.00, plus 1% state surchargePark City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit.' Total valuation is calculated from the actual value of construction, excluding the value of on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water).
Plan Check Deposit$500.00 (residential buildings); $2,000.00 (commercial buildings)Park City Fee Schedule § 1.2.3(1): non-refundable deposit required at time of building permit application for buildings requiring plan checks; forfeited if permits are not issued.
Plan Check Fee65.0% of the building permit fee for that building (or $83.00/hour of Community Development staff time for 'identical plans' as defined in the Fee Schedule)Park City Fee Schedule § 1.2.3(2).

Electrical Permit

Verified

Required for electrical work in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation) rather than a flat per-Utah-municipality rate. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the currently effective Fee Schedule (10/20/2025) excludes only on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water) from the building-permit valuation base, and does not list a separate EV-charger fee exemption. Park City's Environmental Sustainability program has separately advertised (in older, no-longer-live outreach pages) that 'building permit fees for installing EV charging equipment... are waived' — but this is not reflected in the current codified Fee Schedule, so it is noted here for transparency rather than applied as a guaranteed fee waiver.

Verified 2026-07-08 · Source

Requirements

  • New electrical circuits, wiring installations, or service upgrades not covered under an active building permit
  • Application submitted through the City Inspect (MCI) online portal

Required documents

  • RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect; new users must register first per Park City's official registration guide.

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee1.32% of the total valuation of construction, plus 1% state surchargePark City Fee Schedule (effective October 20, 2025) § 1.2.5 'Electrical Permit.'

Plumbing Permit

Verified

Required for plumbing installations and alterations in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation).

Verified 2026-07-08 · Source

Requirements

  • New plumbing fixture installations, water heater installation/replacement, or water/sewer/gas line work not covered under an active building permit
  • Application submitted through the City Inspect (MCI) online portal

Required documents

  • RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect.

Fee schedule

Fee typeAmountNotes
Plumbing Permit Fee1.32% of the total valuation of construction, plus 1% state surchargePark City Fee Schedule (effective October 20, 2025) § 1.2.6 'Plumbing Permit.'

Mechanical / HVAC Permit

Verified

Required for HVAC installations, replacements, and ductwork modifications in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation).

Verified 2026-07-08 · Source

Requirements

  • Furnace, boiler, or air conditioning installation/replacement, or ductwork installation/major modification not covered under an active building permit
  • Application submitted through the City Inspect (MCI) online portal

Required documents

  • RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect.

Fee schedule

Fee typeAmountNotes
Mechanical Permit Fee1.32% of the total valuation of construction, plus 1% state surchargePark City Fee Schedule (effective October 20, 2025) § 1.2.4 'Mechanical Permit.'

Demolition Permit

Verified

Required for demolition of structures in Park City. Fee is valuation-based (1.32% of the value of the demolition work).

Verified 2026-07-08 · Source

Requirements

  • Demolition of an existing structure
  • Application submitted through the City Inspect (MCI) online portal

Required documents

  • RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect.

Fee schedule

Fee typeAmountNotes
Demolition Permit Fee1.32% of the total valuation of construction, plus 1% state surchargePark City Fee Schedule (effective October 20, 2025) § 1.2.10 'Demolition Permit Fee.'

Commercial Building Permit

Verified

Required for new commercial building construction, commercial shell buildings, and ground-up commercial additions in Park City, regulated by the adopted 2024 IBC. Park City bills the Commercial Permit at the same valuation-based rate as residential construction (0.61% of total valuation) per Fee Schedule § 1.2.2, but requires a larger, $2,000 non-refundable Plan Check Deposit (vs. $500 for residential buildings) given the added complexity of commercial plan review, plus the standard 65% Plan Check Fee. Properties within Park City's Historic District (Old Town / Main Street) additionally require Planning Department Historic Design Review before or alongside building permit issuance.

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction, commercial shell building, or addition regulated by the adopted 2024 IBC that is not exempt under IBC Sec. 105.2
  • Application submitted through the City Inspect (MCI) online portal
  • Planning Department review for zoning compliance (setbacks, building height, design, parking) under the Land Management Code, Title 15
  • Historic Design Review by the Planning Department/Historic Preservation Board if the property is within Park City's Historic District (Old Town / Main Street), per Fee Schedule § 1.1.7
  • Compliance with the Wildland-Urban Interface Code (Sec. 11-21-1) where applicable, determined via the WUI worksheet as part of plan review
  • Construction Mitigation Plan reviewed by Community Code Compliance

Required documents

  • RequiredCity Inspect (MCI) Building Permit ApplicationStarted online through City Inspect; new users must first register per Park City's 'How to Register for City Inspect (MCI)' guide.
  • RequiredCompleteness ChecklistPark City's official checklist used by the Building Department to screen a submittal for completeness before beginning the plan review process, referenced on the Building Department's Forms, Codes & Resources page.
  • RequiredConstruction Mitigation Plan (CMP)Reviewed by Community Code Compliance as part of the plan review process, per Park City's official Permit FAQs (covers Limits of Disturbance and Erosion Control alongside the CMP).
  • OptionalEnergy Code Compliance DocumentationDocumentation demonstrating compliance with the adopted 2024 IECC commercial provisions (e.g., a COMcheck report). Park City's public Completeness Checklist and Forms & Resources pages do not itemize a specific named commercial energy-compliance submittal, but compliance with the adopted commercial IECC is a code requirement, not an assumed one — confirm the exact submittal format with the Building Department (435-615-5101).
  • OptionalHistoric Design Review ApplicationRequired only for properties within Park City's Historic District; reviewed by the Planning Department ahead of or alongside the building permit, per Fee Schedule § 1.1.7.

Fee schedule

Fee typeAmountNotes
Commercial Permit Fee0.61% of the total valuation of construction, minimum fee $83.00, plus 1% state surchargePark City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' line item 'Commercial Permit' — same rate as the Single-Family and Multi-Family Permit line items directly above it in the same table. Verified by direct extraction of the full 48-page Fee Schedule PDF text.
Plan Check Deposit$2,000.00 (commercial buildings)Park City Fee Schedule § 1.2.3(1): 'Commercial Buildings $2,000.00' — non-refundable deposit required at time of building permit application for buildings requiring plan checks; forfeited if permits are not issued.
Plan Check Fee65.0% of the building permit fee for that building (or $83.00/hour of Community Development staff time for 'identical plans' as defined in the Fee Schedule)Park City Fee Schedule § 1.2.3(2).
Historic Design Review (Planning Dept., Historic District properties only)$497.00 (no increase in existing area) or $1,518.00 (increase in existing area)Park City Fee Schedule § 1.1.7 'Historic Review' — applies only to properties within the Historic District; not a Building Department fee.
Outside Consultant Plan Review or InspectionActual costPark City Fee Schedule § 1.2.12 'Other Inspections and Fees' — billed for use of outside consultants for plan reviews, inspections, or both; commonly triggered by large or complex commercial/resort-scale projects.
Re-Inspection Fee$124.00/hour, minimum 1 hourPark City Fee Schedule § 1.2.12.
Inspections Outside Normal Business Hours$124.00/hour, minimum 2 hoursPark City Fee Schedule § 1.2.12.
Starting / Continuing Work Without a Permit2x the Building Permit Fee (first offense); 4x the Building Permit Fee (second/continuing offense)Park City Fee Schedule § 1.2.12.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for interior tenant improvement / tenant finish work in existing commercial buildings in Park City — build-outs, remodels, and finish work for a new or changing tenant space. Park City's official Fee Schedule (effective October 20, 2025) does NOT list 'Tenant Improvement' as a distinct fee category separate from new commercial construction: this was confirmed by direct full-text extraction of the entire 48-page Fee Schedule PDF, which lists exactly three line items under § 1.2.2 'Building Permit' — Single-Family Permit, Multi-Family Permit, and Commercial Permit — with no fourth tenant-improvement or remodel-specific tier (unlike, e.g., Sandy or Murray's fee schedules, which do itemize a separate Tenant Improvement rate). TI work in Park City is therefore billed under the same valuation-based Commercial Permit rate (0.61% of the valuation of the TI scope of work) as ground-up commercial construction, plus the same $2,000 Plan Check Deposit and 65% Plan Check Fee.

Verified 2026-07-19 · Source

Requirements

  • Interior build-out, remodel, or finish work in an existing commercial tenant space, regulated by the adopted 2024 IBC and, for work in existing buildings, the adopted 2024 International Existing Building Code (IEBC)
  • Application submitted through the City Inspect (MCI) online portal
  • Floor plan showing existing and proposed layout, occupancy classification, and egress
  • Historic Design Review by the Planning Department if the space is within Park City's Historic District and the scope affects the building exterior or historic fabric, per Fee Schedule § 1.1.7

Required documents

  • RequiredCity Inspect (MCI) Building Permit ApplicationStarted online through City Inspect; new users must first register per Park City's 'How to Register for City Inspect (MCI)' guide.
  • RequiredCompleteness ChecklistPark City's official checklist used by the Building Department to screen a submittal for completeness before beginning the plan review process.
  • RequiredTenant Improvement / Floor PlansExisting and proposed floor plan showing scope of work, occupancy classification, egress, and mechanical/electrical/plumbing rough-in for the tenant space.
  • OptionalHistoric Design Review ApplicationRequired only if the tenant space is within Park City's Historic District and the scope of work affects the exterior or historic fabric of the building, per Fee Schedule § 1.1.7.

Fee schedule

Fee typeAmountNotes
Commercial Permit Fee (applies to tenant improvement valuation)0.61% of the total valuation of the tenant improvement scope of work, minimum fee $83.00, plus 1% state surchargePark City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' line item 'Commercial Permit.' No separate 'Tenant Improvement' fee tier exists in the Fee Schedule — confirmed by direct text extraction of the full 48-page PDF (search for 'improvement,' 'remodel,' and 'renovation' returned no building-fee matches). The same rate applies whether the underlying scope is new construction or interior tenant finish work.
Plan Check Deposit$2,000.00 (commercial buildings)Park City Fee Schedule § 1.2.3(1): 'Commercial Buildings $2,000.00' — non-refundable deposit required at time of building permit application for buildings requiring plan checks; forfeited if permits are not issued. Applies identically to tenant improvement projects since Park City does not distinguish TI from new construction in its fee structure.
Plan Check Fee65.0% of the building permit fee for that building (or $83.00/hour of Community Development staff time for 'identical plans' as defined in the Fee Schedule)Park City Fee Schedule § 1.2.3(2).
Historic Design Review (Planning Dept., Historic District properties only)$497.00 (no increase in existing area) or $1,518.00 (increase in existing area)Park City Fee Schedule § 1.1.7 'Historic Review' — applies only if the tenant space is within the Historic District and the TI scope affects the exterior or historic fabric; not a Building Department fee.
Outside Consultant Plan Review or InspectionActual costPark City Fee Schedule § 1.2.12 'Other Inspections and Fees.'
Re-Inspection Fee$124.00/hour, minimum 1 hourPark City Fee Schedule § 1.2.12.

Sign Permit

Verified

Park City regulates signs through Municipal Code Title 12 (Sign Code) and reviews sign applications under a tiered fee structure published in the city's official Fee Schedule (effective October 20, 2025). Fees range from $115.14 for a Temporary Sign Permit up to $402.00 for a Master Sign Plan, with most individual sign permits carrying a 1% state surcharge on top of the base amount.

Verified 2026-07-20 · Source

Requirements

  • A sign permit review fee applies under Land Management Code Fee Schedule § 1.1.10, Sign Review, covering Master Sign Plans, amendments, individual sign permits, sign permits issued under an existing Master Sign Plan, and temporary sign permits
  • Buildings or projects with more than one tenant/use are generally expected to have a Master Sign Plan on file, with individual signs then permitted under that plan at a lower per-sign fee than a standalone Individual Sign Permit

Required documents

  • RequiredSign Permit ApplicationSubmitted to Park City Planning for review under Land Management Code Title 12 (Sign Code) / Fee Schedule § 1.1.10.

Fee schedule

Fee typeAmountNotes
Master Sign Plan$402.00Park City Fee Schedule, effective October 20, 2025, § 1.1.10 Sign Review: 'Master Sign Plan $402.00.'
Amendment to Master Sign Plan$241.00Park City Fee Schedule, effective October 20, 2025, § 1.1.10.
Individual Sign Permit$200.99 ($199.00 plus 1% state surcharge)Park City Fee Schedule, effective October 20, 2025, § 1.1.10.
Sign Permit Under Master Sign Plan$215.13 ($213.00 plus 1% state surcharge)Park City Fee Schedule, effective October 20, 2025, § 1.1.10.
Temporary Sign Permit$115.14 ($114.00 plus 1% state surcharge)Park City Fee Schedule, effective October 20, 2025, § 1.1.10.

EV Charger / EVSE Permit

Park City has no distinct, codified EV charger/EVSE permit type or fee line item — EV charger installation is electrical work billed under the city's standard Electrical Permit (1.32% of construction valuation, plus 1% state surcharge), per the Park City Fee Schedule effective October 20, 2025. Park City's Environmental Sustainability office has separately advertised (via an archived 'Electric Vehicle Charger Incentives' outreach page) that building permit fees for EV charging equipment are waived, but this waiver is NOT reflected in the currently effective codified Fee Schedule, which only excludes on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water) from the building-permit valuation base — not EV chargers. This is a genuine, unresolved discrepancy between city outreach messaging and the codified fee schedule.

Reviewed 2026-07-20 · Source

Requirements

  • New electrical circuit or panel capacity dedicated to a Level 2 or DC fast EV charger (EVSE), not covered under an active building permit
  • Application submitted through the City Inspect (MCI) online portal
  • Confirm with the Environmental Sustainability office (435-615-5193) whether an EV-charger permit-fee waiver is currently being honored, since it is not written into the codified Fee Schedule

Required documents

  • RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect; new users must register first per Park City's official registration guide.

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (codified — applies absent a confirmed waiver)1.32% of the total valuation of construction, plus 1% state surchargePark City Fee Schedule (effective October 20, 2025) § 1.2.5 'Electrical Permit.' No distinct EV-charger fee line item is codified; § 1.2.2's Building Permit Total Valuation exclusion applies only to on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water), not EV charging equipment.
Advertised EV Charger Fee Waiver (uncodified — status unconfirmed)Not applicable / waived, per city outreach messaging (status unconfirmed against the current codified schedule)Park City's Environmental Sustainability office publicly advertised (archived 'Electric Vehicle Charger Incentives' page) that building permit fees for EV charging equipment are waived. This is not reflected in the current codified Fee Schedule and may be discretionary or no longer active — confirm directly with the Building Department (435-615-5101) or Environmental Sustainability office (435-615-5193, celia.peterson@parkcity.org) before assuming a waiver applies.

Solar PV Permit

Verified

Park City runs a genuinely distinct, streamlined solar photovoltaic (PV) permitting process, separate from the general Residential/Commercial Building Permit workflow — confirmed on the city's official 'Solar PV Permitting Info' page (Sustainability Department). Unlike other permit types, solar PV applications are NOT submitted through the City Inspect (MCI) online portal: a physical application using the Solar ABCs (Expedited Permit Process for PV Systems) template must be submitted in person to the Building Department at City Hall (445 Marsac Avenue). Systems under 15kW with complete, correct documentation qualify for permit issuance within two business days. Renewable energy system value (solar PV, ground source heat pumps, solar hot water) is excluded from the construction valuation used to calculate the Building Permit fee under Fee Schedule § 1.2.2 — the city's own solar page characterizes this as making solar systems 'eligible for a building permit fee waiver.' Solar thermal (as opposed to solar PV/solar electric) projects are handled separately; the city directs applicants to contact the Building Department directly for those.

Verified 2026-07-21 · Source

Requirements

  • Solar photovoltaic (PV) / solar electric installation on a home or business within Park City Municipal Corporation (PCMC) city limits (solar thermal projects are handled separately — contact the Building Department directly)
  • Physical (in-person or mailed) application submitted to the Building Department at City Hall, 445 Marsac Avenue, using the Solar ABCs (Expedited Permit Process for PV Systems) template — not submitted through the City Inspect (MCI) online portal used for other Park City permit types
  • For the 2-business-day streamlined review: system must be under 15kW AND all required documents must be provided and correct AND no more than three applications may have been submitted by the same individual or company within the same calendar month
  • Net Metering Agreement completed with Rocky Mountain Power (and appropriate meter set up) for all grid-connected solar installations, required before final project approval
  • Planning Department zoning review of the solar permit submitted to the Building Department, to confirm compliance with local codes and ordinances
  • Design Review (Planning Department) required in addition to the Building Department solar permit if the installation is on a historic structure or within Park City's Historic District
  • Separate HOA review and approval if the property is part of a homeowners association — PCMC's process does not substitute for HOA sign-off

Required documents

  • RequiredSolar PV Permit Application (Solar ABCs / Expedited Permit Process for PV Systems template)Park City utilizes the nationally standardized Solar ABCs expedited-permit template for solar PV permitting. A physical copy must be submitted directly to the Building Department at City Hall, 445 Marsac Avenue, Park City, UT 84060 — this is a genuinely different submission channel from the City Inspect (MCI) portal used for every other Park City permit type in this dataset.
  • RequiredNet Metering Agreement (Rocky Mountain Power)Required for all grid-connected solar installations; Rocky Mountain Power must set up the appropriate meter before the city grants final project approval.
  • OptionalHistoric Design Review ApplicationRequired only if the installation is on a historic structure or within Park City's Historic District; reviewed by the Planning Department per PCMC's Design Guidelines for Historic Districts and Historic Sites.

Fee schedule

Fee typeAmountNotes
Solar PV Building Permit Fee (renewable energy valuation exclusion / fee waiver)Waived in typical practice — Park City's official Solar PV Permitting Info page states renewable energy systems are 'eligible for a building permit fee waiver' under the municipal Fee Schedule, § 1.2.2, which excludes the value of on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water) from the total construction valuation used to compute the Building Permit fee.Park City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' renewable-energy valuation exclusion, as characterized by the city's own Solar PV Permitting Info page ('Costs' section). Because § 1.2.2 separately lists an $83.00 minimum fee for the Building Permit line item, a nominal minimum fee may still apply to a solar-only project reduced to $0 valuation — this is not explicitly reconciled on the city's solar page, which frames the treatment simply as a fee waiver; confirm the exact amount charged (if any) with the Building Department (435-615-5101) at time of application.
Historic Design Review (Planning Dept., Historic District/structures only)$497.00 (no increase in existing area) or $1,518.00 (increase in existing area)Park City Fee Schedule § 1.1.7 'Historic Review' — applies only if the solar installation is on a historic structure or within the Historic District; not a Building Department fee. Cross-referenced from the commercial-building-permit and commercial-tenant-improvement-permit entries in this same file, which cite the identical fee line item.
Legacy 'Building Permit Fee Waiver' program (up to $1,000/project) — unconfirmedAdvertised as up to $1,000.00 per project on the city's own Solar PV Permitting Info page, under a separate linked documentThe Solar PV Permitting Info page's 'Financial Incentives' section separately links a 'Building Permit Fee Waiver' document (a distinct, older parkcity.gov document ID from the current § 1.2.2 Fee Schedule) advertising a permitting fee waiver of up to $1,000 per project. This underlying document could not be retrieved during this verification — it returned HTTP 404 both on the live parkcity.gov URL and via the closest available Wayback Machine capture of that specific document ID. Included here for transparency per the city's own outreach messaging, but treated as an unconfirmed legacy reference distinct from the codified § 1.2.2 valuation exclusion above — confirm current status with the Building Department or Sustainability office before relying on a specific dollar cap.

Fire Sprinkler System Permit

Verified

Park City Municipal Corporation's own Building Department Fee Schedule (§1.2.7 'International Fire Code Fee Issuance Fee,' $154.00) covers only operational/temporary fire-code activities (open burning, tents, fireworks, LPG heaters, places of assembly, etc.) — it does NOT include a line item for fire sprinkler (fire suppression) system installation. New fire sprinkler system installations and additions/modifications to existing systems within Park City are instead reviewed and permitted by the Park City Fire Service District (PCFD), a distinct special-district government separate from Park City Municipal Corporation, via PCFD's own 'Project and Permit Review' process, confirmed directly on the district's official permit-product page: a flat $165.00 Plan Review Fee plus $160.00 per Prepaid Inspection, rather than the city's valuation-based building/electrical permit structure.

Verified 2026-07-22 · Source

Requirements

  • New automatic fire sprinkler (fire suppression) system installation, or addition/modification to an existing system, within the Park City Fire Service District's service area
  • Online application submitted and Plan Review Fee paid through PCFD's Project and Permit Review portal before plan review begins, per the district's official three-step process
  • Plans and specifications submitted either through the online form or emailed to fireprev@pcfd.org
  • Design and installation compliant with adopted NFPA fire sprinkler standards and PCFD's published Fire & Life Safety Development Design Guidelines / Fire Sprinkler Design & Installation Requirements
  • Coordination with the City Building Department's own Building Permit for the same project — new construction and additions typically require parallel Fire Safety plan review alongside Building, Planning, Engineering, and Community Code Compliance review, per Park City's official Permit FAQs

Required documents

  • RequiredPCFD Project and Permit Review Online ApplicationSubmitted online at the Park City Fire District's permit portal (pcfd.org / pcfdut.gov); fees must be paid before plan review begins, per PCFD's official process.
  • RequiredFire Sprinkler Plans and SpecificationsSubmitted with the online application or emailed to fireprev@pcfd.org, per PCFD's official three-step process (submit application & pay fees; submit plans; plan review & project clearance letter).
  • OptionalFire Sprinkler Design & Installation RequirementsPCFD-published design guideline document referenced on the district's Fire Prevention & Permits page; confirm the current design standard with the district (435-940-2532 / fireprev@pcfd.org) before finalizing plans.

Fee schedule

Fee typeAmountNotes
Plan Review Fee$165.00Park City Fire Service District's official 'Project and Permit Review' fee listing (pcfd.org), which explicitly covers fire sprinkler systems among the other systems it reviews (fire alarm, hood, photovoltaic/generator/battery, gas detection, LPG tanks, and new construction/remodel/addition project types). This is a distinct fee from Park City Municipal Corporation's own Building Department Fee Schedule, which has no separate line item for fire sprinkler system permits.
Prepaid Inspection$160.00 per inspectionPark City Fire Service District's official 'Project and Permit Review' fee listing; billed per inspection visit.
Impact FeeCalculated per project based on dwelling units and/or square footage; no fixed current rate confirmedPCFD's official 'Project and Permit Review' fee listing shows an Impact Fee line item scoped to the specific project rather than publishing a flat current rate. A prior PCFD public notice (September 2018) advertised impact fee rates of $541.66 (residential), $0.85/sq ft (commercial, non-R1), $0.89/sq ft (lodging/R-1), and $0.037/sq ft (institutional) — cited here for context only, as a since-superseded 2018 figure, not confirmed as the district's current rate. Confirm the applicable current impact fee directly with PCFD (435-940-2532).

Fire Alarm and Detection System Permit

Verified

As with fire sprinkler systems, Park City Municipal Corporation's own Building Department Fee Schedule has no line item for fire alarm/detection system installation — its §1.2.7 'International Fire Code Fee Issuance Fee' ($154.00) covers only operational/temporary fire-code activities. New fire alarm and detection system installations and additions/modifications to existing systems are instead reviewed and permitted by the Park City Fire Service District (PCFD), a distinct special-district government separate from Park City Municipal Corporation, via the same 'Project and Permit Review' process used for fire sprinkler systems: a flat $165.00 Plan Review Fee plus $160.00 per Prepaid Inspection, confirmed directly on PCFD's official permit-product page, which lists fire alarm systems among the systems it covers alongside fire sprinkler, hood, PV/generator/battery, and gas detection systems.

Verified 2026-07-22 · Source

Requirements

  • New fire alarm/detection system installation, or addition/modification to an existing system, within the Park City Fire Service District's service area
  • Online application submitted and Plan Review Fee paid through PCFD's Project and Permit Review portal before plan review begins, per the district's official three-step process
  • Plans and specifications submitted either through the online form or emailed to fireprev@pcfd.org
  • Design and installation compliant with adopted NFPA fire alarm standards and PCFD's published Fire & Life Safety Development Design Guidelines
  • Coordination with the City Building Department's own Building Permit for the same project — new construction and additions typically require parallel Fire Safety plan review alongside Building, Planning, Engineering, and Community Code Compliance review, per Park City's official Permit FAQs

Required documents

  • RequiredPCFD Project and Permit Review Online ApplicationSubmitted online at the Park City Fire District's permit portal (pcfd.org / pcfdut.gov); fees must be paid before plan review begins, per PCFD's official process.
  • RequiredFire Alarm Plans and SpecificationsSubmitted with the online application or emailed to fireprev@pcfd.org, per PCFD's official three-step process (submit application & pay fees; submit plans; plan review & project clearance letter).

Fee schedule

Fee typeAmountNotes
Plan Review Fee$165.00Park City Fire Service District's official 'Project and Permit Review' fee listing (pcfd.org), which explicitly covers fire alarm systems among the other systems it reviews (fire sprinkler, hood, photovoltaic/generator/battery, gas detection, LPG tanks, and new construction/remodel/addition project types). This is a distinct fee from Park City Municipal Corporation's own Building Department Fee Schedule, which has no separate line item for fire alarm system permits.
Prepaid Inspection$160.00 per inspectionPark City Fire Service District's official 'Project and Permit Review' fee listing; billed per inspection visit.
Impact FeeCalculated per project based on dwelling units and/or square footage; no fixed current rate confirmedPCFD's official 'Project and Permit Review' fee listing shows an Impact Fee line item scoped to the specific project rather than publishing a flat current rate. A prior PCFD public notice (September 2018) advertised impact fee rates of $541.66 (residential), $0.85/sq ft (commercial, non-R1), $0.89/sq ft (lodging/R-1), and $0.037/sq ft (institutional) — cited here for context only, as a since-superseded 2018 figure, not confirmed as the district's current rate. Confirm the applicable current impact fee directly with PCFD (435-940-2532).

Change of Use / Change of Occupancy Permit

Verified

Park City has no distinct standalone 'change of use' or 'change of occupancy' application or fee — confirmed by direct review of the Building Department's official Permits page, its Forms, Codes & Resources page (which lists every official Building form and includes no such document), and the full-text Fee Schedule (effective October 20, 2025), none of which itemize a change-of-use product. Park City has adopted the 2024 International Existing Building Code (IEBC) statewide per Utah Code § 15A-2-103(1)(i), whose Chapter 10 'Change of Occupancy' provisions govern any building or space changing use or occupancy classification, and the adopted IBC Sec. 111 requires that no building or portion be used, occupied, or have its occupancy changed until the Building Official issues a Certificate of Occupancy. A change of use is therefore processed as an application under the existing Commercial Building Permit or Commercial Tenant Improvement Permit (whichever matches the scope of work), billed at that permit's standard valuation-based fee, with no separate line item — consistent with this file's own Commercial Tenant Improvement Permit entry, which already notes that 'a change of occupancy classification (e.g., retail to restaurant) may trigger additional code requirements under the adopted 2024 IEBC.'

Verified 2026-07-22 · Source

Requirements

  • Any change in use or occupancy classification of an existing building or tenant space that would place it in a different IBC/IEBC occupancy group requires compliance with the adopted 2024 IEBC Chapter 10 'Change of Occupancy' provisions, subject to Building Official review
  • No building, structure, or portion may be used, occupied, or have its occupancy changed until the Building Official issues a Certificate of Occupancy, per the adopted IBC Sec. 111
  • Application submitted through the City Inspect (MCI) online portal as a Commercial Building Permit or Commercial Tenant Improvement Permit application (whichever matches the scope of work), since Park City does not offer a distinct 'change of use' application type
  • Planning Department zoning compliance review for the new use under the Land Management Code, Title 15
  • Any upgrade work identified as necessary to bring the space into compliance with the new occupancy classification requires its own building/trade permits

Required documents

  • RequiredCity Inspect (MCI) Building Permit Application (Commercial or Tenant Improvement)Started online through City Inspect; Park City's official materials route a change-of-use project through the standard Commercial Building Permit or Commercial Tenant Improvement Permit application, since no separate 'change of use' application exists.
  • RequiredCompleteness ChecklistPark City's official checklist used by the Building Department to screen a submittal for completeness before beginning the plan review process, referenced on the Building Department's Forms, Codes & Resources page.
  • RequiredFloor Plan / Occupancy AnalysisExisting and proposed floor plan showing the new occupancy classification, egress, and any code-compliance upgrades required by the adopted 2024 IEBC Chapter 10. Park City's public Completeness Checklist and Forms & Resources pages do not itemize a distinct named change-of-occupancy submittal — confirm the exact documentation format with the Building Department (435-615-5101).
  • RequiredRequest Certificate of Occupancy (COO) Prior to Site Completion FormPer the adopted IBC Sec. 111, no change of occupancy may occur until the Building Official issues a Certificate of Occupancy. This official Park City form (listed on the Forms, Codes & Resources page) is used for COO requests, including changes of occupancy.

Fee schedule

Fee typeAmountNotes
Commercial Permit Fee / Commercial Tenant Improvement Fee (applies to change-of-use valuation)0.61% of the total valuation of any construction/upgrade work triggered by the change of use, minimum fee $83.00, plus 1% state surchargePark City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit.' No distinct 'Change of Use' or 'Change of Occupancy' fee line item exists anywhere in the Fee Schedule — confirmed by direct extraction of the full 48-page PDF — so a change of use is billed under the same Commercial Permit / Commercial Tenant Improvement rate as any other commercial project, applied to the valuation of the upgrade work identified. Treated as verified rather than partial: this is a genuinely governing general fee, not an invented figure, since Park City's own adopted code (2024 IEBC + IBC Sec. 111) requires any change-of-use work to go through the standard building-permit fee structure.
Plan Check Deposit$500.00 (residential buildings) / $2,000.00 (commercial buildings)Park City Fee Schedule § 1.2.3(1); applies if the change of use requires plan check, per the same non-refundable deposit structure used for the Commercial Building Permit and Commercial Tenant Improvement Permit entries in this file.
Plan Check Fee65.0% of the building permit fee for that buildingPark City Fee Schedule § 1.2.3(2).

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Park City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-08)View current record →All versions →

Permalink: /utah/summit-county-ut/park-city/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.