This is PermitBase’s published record for Unincorporated Summit County as of 2026-07-08. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Unincorporated Summit County building permits
Unincorporated Summit County, Utah — as published 2026-07-08.
Reviewed 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
Required for new single-family dwellings, duplexes, townhouses, manufactured homes, additions with living space, and other IRC-governed residential construction in unincorporated Summit County, including the Snyderville Basin (Silver Creek, Pinebrook, Jeremy Ranch, Summit Park) and the East Side/3-Mile/Henefer-area unincorporated communities. All applications are submitted and reviewed through the EPROCESS360 online portal — no paper or over-the-counter submissions are accepted.
Reviewed 2026-07-08 · Source
Requirements
- New Single Family Detached (IRC), New Single Family Attached (Duplex) (IRC), or New Townhouses (IRC) — per the County's official 2025 scope-of-work classification list
- Construction or removal of any building/structure may not commence until a valid building permit is obtained from the County Building Official (Summit County Development Code § 10-3-20)
- A source of water must be verified prior to issuance of a building permit for a dwelling — either a statement from an existing water system representative confirming hookup capacity, or evidence of water rights/state engineer filing number for a private source
- A site plan (11"x17" minimum to 36"x48" maximum) must be submitted with the application; must be prepared and wet-stamped by a Utah-licensed surveyor, architect, landscape architect, or engineer if the parcel has a platted building pad, average grade over 5%, proposed structure height over 28 feet, or setbacks closer than 3 feet to the required line
- Financial security (bond or escrow) may be required prior to permit issuance to cover site debris/material abatement costs
- Planning approval may be required prior to building permit submittal for certain projects — contact the Planning Department at (435) 336-3124 to confirm
- Projects on slopes 15% or greater require a geotechnical report
Required documents
- RequiredConstruction Plans (single PDF)Must include floor plan (with dimensions), elevations, electrical plan, mechanical plan (if applicable), plumbing plan (if applicable), framing plan, footing/foundation plan, stamped structural pages, and architect/engineer stamp as required. Per the County's Single Family Dwelling Checklist (current as of 4/2026).
- RequiredSite Plan (separate from Construction Plans)Must show scale, north arrow, property lines, topography, lot size & dimensions, easements, proposed and existing buildings, utility locations, building setbacks, retaining walls, driveway location, curb & gutter elevations, street name/location, hard surface areas, and defensible space for fire (if required)
- RequiredCompliance StatementStatement (can be added as notes on construction plans) that the applicant will comply with local ordinances during construction and will obtain a stormwater permit before land disturbance, if applicable
- RequiredStructural CalculationsRequired for all new dwelling construction
- OptionalREScheck / Energy Code Compliance DocumentRequired if space will be conditioned/heated, demonstrating compliance with the adopted Utah energy code
- RequiredMechanical System DesignManual J, D & S (or other approved HVAC system design method)
- OptionalGeneral Contractor InformationName, address, phone number, and Utah DOPL license number, added to the EPROCESS360 application page under additional contacts
- OptionalOwner Builder Certification FormRequired if the owner is acting as the general contractor; name must match the owner's name in County records
- OptionalHOA Approval Letter and Plan StampNot required at initial submittal but requested during plan review if applicable — contact your HOA to verify
- OptionalFire Approval LetterRequested during plan review from the applicable local fire district
- OptionalWater Commitment of Service Letter / Well LogRequested during plan review; required for Certificate of Occupancy
- OptionalSnyderville Basin Water Reclamation District Fee Receipt / Septic PermitRequested during plan review if applicable to the project location
- OptionalGeotechnical ReportRequired for parcels with slopes of 15% or greater; must be provided by the time of footing inspection
Fee schedule
| Fee type | Amount | Notes |
|---|
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Summit County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.