Unincorporated Summit County building permits

Unincorporated Summit County, Utah — as published 2026-07-16.

Reviewed 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — current statewide-adopted edition per Utah Code § 15A-2-103(1)(a), in force since July 1, 2026 (superseded the 2021 IBC).2021 International Residential Code (IRC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(b), unchanged by the July 1, 2026 code cycle flip; Summit County's official 'Effective 7/1/2026 IRC Project Design Criteria' table (R301.2(1)) confirms structures governed by the IRC are designed to the 2021 IRC baseline per current adoption.2024 International Plumbing Code (IPC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(d), in force since July 1, 2026 (superseded the 2021 IPC).2024 International Mechanical Code (IMC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(e), in force since July 1, 2026 (superseded the 2021 IMC).2024 International Fuel Gas Code (IFGC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(f), in force since July 1, 2026 (superseded the 2021 IFGC).2024 International Energy Conservation Code (IECC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(h), in force since July 1, 2026 (superseded the 2021 IECC; one edition applies statewide, no separate residential/commercial split).Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(n), in force since July 1, 2026 (superseded the 2021 ISPSC); applicable to Summit County pool/hot tub permits (APSP-15/APSP-7 compliance documentation required).2023 National Electrical Code (NEC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(g), unchanged by the July 1, 2026 code cycle flip.2024 International Existing Building Code (IEBC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(i), in force since July 1, 2026; not separately itemized on Summit County's own published materials, added here as it applies statewide.NOTE: The July 1, 2026 statewide code cycle flip (Utah Code § 15A-2-103, amended by Ch. 47, 2026 General Session) is now in effect — the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and (residential provisions of) ISPSC are the current statewide-adopted codes, while the IRC (2021) and NEC (2023) did not change in this cycle.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family dwellings, duplexes, townhouses, manufactured homes, additions with living space, and other IRC-governed residential construction in unincorporated Summit County, including the Snyderville Basin (Silver Creek, Pinebrook, Jeremy Ranch, Summit Park) and the East Side/3-Mile/Henefer-area unincorporated communities. All applications are submitted and reviewed through the EPROCESS360 online portal — no paper or over-the-counter submissions are accepted.

Verified 2026-07-23 · Source

Requirements

  • New Single Family Detached (IRC), New Single Family Attached (Duplex) (IRC), or New Townhouses (IRC) — per the County's official 2025 scope-of-work classification list
  • Construction or removal of any building/structure may not commence until a valid building permit is obtained from the County Building Official (Summit County Development Code § 10-3-20)
  • A source of water must be verified prior to issuance of a building permit for a dwelling — either a statement from an existing water system representative confirming hookup capacity, or evidence of water rights/state engineer filing number for a private source
  • A site plan (11"x17" minimum to 36"x48" maximum) must be submitted with the application; must be prepared and wet-stamped by a Utah-licensed surveyor, architect, landscape architect, or engineer if the parcel has a platted building pad, average grade over 5%, proposed structure height over 28 feet, or setbacks closer than 3 feet to the required line
  • Financial security (bond or escrow) may be required prior to permit issuance to cover site debris/material abatement costs
  • Planning approval may be required prior to building permit submittal for certain projects — contact the Planning Department at (435) 336-3124 to confirm
  • Projects on slopes 15% or greater require a geotechnical report

Required documents

  • RequiredConstruction Plans (single PDF)Must include floor plan (with dimensions), elevations, electrical plan, mechanical plan (if applicable), plumbing plan (if applicable), framing plan, footing/foundation plan, stamped structural pages, and architect/engineer stamp as required. Per the County's Single Family Dwelling Checklist (current as of 4/2026).
  • RequiredSite Plan (separate from Construction Plans)Must show scale, north arrow, property lines, topography, lot size & dimensions, easements, proposed and existing buildings, utility locations, building setbacks, retaining walls, driveway location, curb & gutter elevations, street name/location, hard surface areas, and defensible space for fire (if required)
  • RequiredCompliance StatementStatement (can be added as notes on construction plans) that the applicant will comply with local ordinances during construction and will obtain a stormwater permit before land disturbance, if applicable
  • RequiredStructural CalculationsRequired for all new dwelling construction
  • OptionalREScheck / Energy Code Compliance DocumentRequired if space will be conditioned/heated, demonstrating compliance with the adopted Utah energy code
  • RequiredMechanical System DesignManual J, D & S (or other approved HVAC system design method)
  • OptionalGeneral Contractor InformationName, address, phone number, and Utah DOPL license number, added to the EPROCESS360 application page under additional contacts
  • OptionalOwner Builder Certification FormRequired if the owner is acting as the general contractor; name must match the owner's name in County records
  • OptionalHOA Approval Letter and Plan StampNot required at initial submittal but requested during plan review if applicable — contact your HOA to verify
  • OptionalFire Approval LetterRequested during plan review from the applicable local fire district
  • OptionalWater Commitment of Service Letter / Well LogRequested during plan review; required for Certificate of Occupancy
  • OptionalSnyderville Basin Water Reclamation District Fee Receipt / Septic PermitRequested during plan review if applicable to the project location
  • OptionalGeotechnical ReportRequired for parcels with slopes of 15% or greater; must be provided by the time of footing inspection

Fee schedule

Fee typeAmountNotes
Building Permit Fee (both commercial and residential)0.0075 (3/4 of 1%) of construction valuation; $100 minimum fee (covers the cost of one inspection)Summit County Building Department Fee Schedule, Ordinance 834-P (amended May 2026, effective 6/2026), item 2: 'Building Permit Fees (both commercial and residential) — a. Fees are calculated at a rate of 0.0075 (3/4 of 1%) of the construction valuation. i. Minimum fee: $100 (fee covers the costs of one inspection).' Construction valuation itself is set using the ICC Building Safety Journal valuation tables adopted by item 1 of the same schedule (reproduced in the County's own 'Building Valuation Data' document, February 2026). This closes the previously-undocumented 'Permit Fee Multiplier': re-chased 2026-07-23 by downloading Ordinance 834-P directly and rendering page 33 to an image (the source PDF is scanned, non-machine-readable) — there is no separate confidential multiplier; the rate is simply a flat 0.0075 of the ICC-table valuation.
Plan Review Fee65% of the applicable building permit fee (may be waived if plan review is not necessary, per the Building Official)Summit County Building Department Fee Schedule, Ordinance 834-P, item 3. Read directly from the rendered ordinance page image, 2026-07-23.
Plan Review Deposit (new structures)$200 deposit, credited toward the building plan review fee once approved (may be modified by the Building Official if no plan review is required, or reduced for structures that will be assessed a plan review fee under $200)Summit County Building Department Fee Schedule, Ordinance 834-P, item 12.a: 'Plan Review Deposit (commercial, residential and agricultural) — New structures: $200 deposit...' Read directly from the ordinance PDF (page 34, rendered to an image), 2026-07-23.
Utah State Surcharge1% of all permitsSummit County Building Department Fee Schedule, Ordinance 834-P, item 9, collected and remitted to the State of Utah per UCA 15A-1-209.

Commercial Building Permit

Verified

Required for new commercial building construction in unincorporated Summit County, including the Snyderville Basin (Silver Creek, Pinebrook, Jeremy Ranch, Summit Park) and the East Side/3-Mile/Henefer-area unincorporated communities. Construction and structural plans must be drafted by an architect licensed in the state of Utah. All applications are submitted and reviewed through the EPROCESS360 online portal, per the County's 'New Commercial Checklist' (current as of 6/2026).

Verified 2026-07-23 · Source

Requirements

  • New commercial building construction on a permitted, properly zoned lot in unincorporated Summit County
  • Construction may not commence until a valid building permit is obtained from the County Building Official (Summit County Development Code § 10-3-20)
  • Architectural and Structural Plans must be combined into one PDF and drafted by an Architect licensed in the state of Utah — per the County's New Commercial Checklist (6/2026), unlike the residential owner-builder allowance
  • Site Plan showing scale, north arrow, property lines, topography, defensible space for fire (if required), proposed and existing buildings, driveway location, building setbacks, street name/location, easements, utility locations, retaining walls, and hard surface areas
  • COMcheck (lighting and mechanical) energy code compliance documentation
  • Geotechnical Report required prior to any boring/trenching/digging; a separate County engineering permit must be obtained before this work begins
  • Commercial Project Engineering Review Checklist compliance for site civil elements — roadway/parking design, utility design, grading design, drainage design (per Summit County Code § 9-3-11), and erosion control/SWPPP — reviewed by the Summit County Engineering Division
  • A separate right-of-way permit (via the County's online portal) is required for any work — closures, excavations, structures — within County rights-of-way
  • A Long-Term Stormwater Management Plan may be required if the project disturbs more than 1 acre; a Noxious Weed Plan is required if the project disturbs more than a quarter acre (10,890 sq ft) and imports soil and/or exports more than 10 cubic yards of soil

Required documents

  • RequiredConstruction Plans (single PDF, Architectural + Structural)Must be drafted by an Architect licensed in the state of Utah and include: HOA approval stamp (if applicable), footing/foundation plan, floorplan (with dimensions), elevations, electrical plan (n/a if shell only), plumbing plan (n/a if shell only), framing plans, stamped structural pages, code analysis, and governing codes. Per the County's New Commercial Checklist (current as of 6/2026).
  • RequiredSite Plan (separate from Construction Plans)Must show scale, north arrow, property lines, topography, defensible space for fire (if required), proposed and existing buildings, driveway location, building setbacks from property lines, name and location of street(s), easements, utility locations, retaining walls, and hard surface areas
  • RequiredCompliance StatementStatement (can be added as notes on construction plans) that the applicant will comply with local ordinances during construction and will obtain a stormwater permit before land disturbance, if applicable
  • RequiredStructural CalculationsRequired for all new commercial construction
  • RequiredCOMcheckLighting and mechanical energy code compliance documentation
  • RequiredFire Approval LetterRequired from the applicable local fire district
  • RequiredWater Commitment of Service Letter / Well LogRequired documentation of water availability
  • RequiredGeotechnical ReportRequired; an engineering permit must be obtained prior to any boring, trenching, or digging
  • RequiredBid ContractList of proposed work and associated cost
  • OptionalHOA Approval Letter and Plan StampContact your HOA to verify if approval is needed
  • OptionalSnyderville Basin Water Reclamation District Fee Receipt / Septic PermitApplicable depending on project location
  • OptionalRecreation District ApprovalOnly required in the Snyderville Basin, and only if the structure contains living space
  • OptionalService Area 3 ApprovalOnly required for projects within the Service Area 3 boundaries
  • RequiredGeneral & Subcontractor InformationName, address, phone number, and license number, added to the EPROCESS360 application page under additional contacts
  • RequiredCommercial Project Engineering Review Checklist materialsTitle Report or ALTA Survey Map, roadway/parking design, utility design, grading design, drainage design (per County Code § 9-3-11), erosion control/SWPPP plan, Construction Mitigation Plan (per County template), and a civil construction cost estimate based on County unit rates — reviewed by the Summit County Engineering Division per its Commercial Project Engineering Review Checklist

Fee schedule

Fee typeAmountNotes
Building Permit Fee (both commercial and residential)0.0075 (3/4 of 1%) of construction valuation; $100 minimum fee (covers the cost of one inspection)Re-chased 2026-07-23: Summit County Building Department Fee Schedule, Ordinance 834-P (amended May 2026, effective 6/2026), item 2: 'Building Permit Fees (both commercial and residential) — a. Fees are calculated at a rate of 0.0075 (3/4 of 1%) of the construction valuation. i. Minimum fee: $100.' Downloaded the ordinance PDF directly and rendered page 33 to an image (the source PDF is scanned/non-machine-readable) and read it visually. This directly resolves the previously-undocumented 'Permit Fee Multiplier' mentioned in the County's BVD document — there is no separate confidential multiplier; the rate is a flat 0.0075 applied to the ICC BVD-table valuation.
Plan Review Fee65% of the applicable building permit fee (may be waived if plan review is not necessary, per the Building Official)Summit County Building Department Fee Schedule, Ordinance 834-P, item 3. Read directly from the rendered ordinance page image, 2026-07-23.
Plan Review Deposit (new structures)$200 deposit, credited toward the building plan review fee once approved (may be modified by the Building Official if no plan review is required, or reduced for structures that will be assessed a plan review fee under $200)Summit County Building Department Fee Schedule, Ordinance 834-P, item 12.a. Read directly from the ordinance PDF (page 34, rendered to an image), 2026-07-23.
Utah State Surcharge1% of all permitsSummit County Building Department Fee Schedule, Ordinance 834-P, item 9, collected and remitted to the State of Utah per UCA 15A-1-209.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement (tenant finish) work in existing commercial buildings in unincorporated Summit County — interior build-outs, remodels, and finish work for a new or changing tenant space. Plans for tenant improvements of a finished shell and change-of-use remodels must be designed by an architect licensed in the state of Utah. All applications are submitted and reviewed through the EPROCESS360 online portal, per the County's 'Commercial Remodel/Tenant Improvement Checklist' (current as of 6/2026).

Verified 2026-07-23 · Source

Requirements

  • Interior build-out, remodel, or finish work in an existing commercial tenant space in unincorporated Summit County
  • Tenant improvements of a finished shell and change-of-use remodels require plans to be designed by an architect licensed in the state of Utah — per the County's Commercial Remodel/Tenant Improvement Checklist (6/2026)
  • Property owner approval letter for the proposed project
  • COMcheck (lighting and mechanical) energy code compliance documentation
  • Construction Mitigation Plan required per Summit County Code § 7-7-11 if exterior work is proposed
  • Site Plan required only if the exterior is being redone or there is a change of use — must show existing buildings, name/location of street(s), parking (including accessible parking), and (if exterior/change of use) scale, north arrow, property lines, topography, and building setbacks
  • Additional information may be requested depending on the scope of the project

Required documents

  • RequiredConstruction Plans (single PDF)Must include HOA approval stamp (if applicable), stamped structural pages (if structural work done), existing and proposed floorplans, mechanical plan, plumbing plan, electrical plan, elevations (n/a if no exterior work), code analysis, and governing codes. Per the County's Commercial Remodel/Tenant Improvement Checklist (current as of 6/2026).
  • RequiredCompliance StatementStatement (can be added as notes on construction plans) that the applicant will comply with local ordinances during construction and will obtain a stormwater permit before land disturbance, if applicable
  • RequiredProperty Owner Approval LetterLetter approving the proposed tenant improvement project
  • RequiredCOMcheckLighting and mechanical energy code compliance documentation
  • RequiredBid ContractList of proposed work and associated cost
  • RequiredGeneral & Subcontractor InformationName, address, phone number, and license number, added to the EPROCESS360 application page under additional contacts
  • OptionalSite Plan (separate from Construction Plans)Must show existing buildings, name and location of street(s), and parking (including accessible parking); scale/north arrow/property lines/topography and building setbacks are required only if the exterior is being redone or there is a change of use
  • OptionalHOA Approval LetterContact your HOA to verify if approval is needed
  • OptionalStructural CalculationsRequired if structural work is part of the scope
  • OptionalFire Approval LetterRequired if applicable to the scope of work
  • OptionalWater Commitment of Service Letter / Well LogDocumentation of water availability
  • OptionalSnyderville Basin Water Reclamation District Fee Receipt / Septic PermitApplicable depending on project location
  • OptionalConstruction Mitigation PlanRequired per Summit County Code § 7-7-11 if exterior work is proposed
  • OptionalRecreation District ApprovalOnly required in the Snyderville Basin, and only if the structure contains living space
  • OptionalService Area 3 ApprovalOnly required for projects within the Service Area 3 boundaries

Fee schedule

Fee typeAmountNotes
Building Permit Fee (both commercial and residential; applies to tenant improvements)0.0075 (3/4 of 1%) of construction valuation; $100 minimum feeRe-chased 2026-07-23 by downloading Ordinance 834-P directly and rendering page 33 to an image (the source PDF is scanned/non-machine-readable). Item 2, 'Building Permit Fees (both commercial and residential),' sets a flat 0.0075 rate with no carve-out for alterations/tenant-improvement work, and this file's Bid Contract document requirement exists specifically to establish a project's construction valuation for fee purposes. The County's posted 'Building Valuation Data – FEBRUARY 2026' (ICC BVD) document separately notes the BVD table itself 'is not intended to apply to alterations or repairs to existing buildings' — so for a tenant improvement, the 'construction valuation' the 0.0075 rate is applied against is based on the submitted Bid Contract cost rather than the ICC BVD square-footage table (which only prices new whole structures). Contact the Building Department at (435) 336-3124 or buildingquestions@summitcountyutah.gov to confirm the exact valuation figure that will be used for a specific project before applying.
Plan Review Deposit (tenant improvement / 'all other permits')$65 deposit, credited toward the plan review fee once approved (may be modified by the Building Official if no plan review is required)Summit County Building Department Fee Schedule, Ordinance 834-P, item 12.b: 'Plan Review Deposit (commercial, residential and agricultural) — All other permits: $65 deposit...' — this $65 tier (vs. the $200 new-structure tier at item 12.a) applies to tenant improvement/remodel permits since they are not new structures. Read directly from the ordinance PDF (page 34, rendered to an image), 2026-07-23.
Plan Review Fee65% of the applicable building permit fee (may be waived if plan review is not necessary, per the Building Official)Summit County Building Department Fee Schedule, Ordinance 834-P, item 3.
Utah State Surcharge1% of all permitsSummit County Building Department Fee Schedule, Ordinance 834-P, item 9, collected and remitted to the State of Utah per UCA 15A-1-209.

EV Charger / EVSE Permit

Verified

Summit County does not publish a distinct EV charger / EVSE permit type or fee line item. Directly read in full (2026-07-20, rendered page-by-page as images since the source PDF is scanned/non-machine-readable) the complete 'Summit County Building Department Fee Schedule' section of the County-Wide Fee Schedule (Ordinance 834-P, amended May 2026, effective 6/2026) — it lists a general Building Permit Fee (0.0075, i.e. 3/4 of 1%, of construction valuation, $100 minimum, both commercial and residential), a separate 'Alternative Energy Permits' category explicitly limited to 'solar, hot water, photovoltaic, geo-thermal, and wind generated power' ($700 photovoltaic / $500 geo-thermal / $250 solar hot water / $250 wind generator), and separate flat $100 fees for 'Electrical utility meter upgrade or replacement,' 'Mechanical utility meter upgrade or replacement,' and 'Plumbing utility meter upgrade or replacement.' No 'EV,' 'electric vehicle,' or 'charging station' line item appears anywhere in this fee schedule. Because EV/EVSE installation is not one of the enumerated Alternative Energy Permit categories and is not a utility-meter upgrade, it is billed as ordinary electrical work under the general Building Permit Fee (0.0075 x construction valuation, $100 minimum), the same mechanism used for standard building/electrical/mechanical/plumbing work in unincorporated Summit County.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Summit County — billed as ordinary electrical work under the general Building Permit, not the county's separate 'Alternative Energy Permit' category (which is limited to solar, hot water, photovoltaic, geo-thermal, and wind generated power)
  • All submissions, reviews, and permit issuance processed exclusively through the EPROCESS360 online portal (summit.co.ut.eprocess360.com) — the County does not accept paper plans or perform over-the-counter reviews
  • Compliance with the 2023 NEC, adopted statewide per Utah Code § 15A-2-103(1)(g)

Required documents

  • RequiredBuilding Permit Application (EPROCESS360 online portal)Submitted online at summit.co.ut.eprocess360.com, the same portal used for all other Summit County building permit types; no distinct EV-charger application form or checklist is published.
  • OptionalElectrical Plan / Single-Line DiagramCharger manufacturer specifications and circuit/panel capacity information — standard supporting documentation for the electrical-work component of a building permit.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (general, applies to EV charger/EVSE installation)0.0075 (3/4 of 1%) of construction valuation; $100 minimum fee (covers cost of one inspection)Summit County Building Department Fee Schedule, Ordinance 834-P (amended May 2026, effective 6/2026), item 2: 'Building Permit Fees (both commercial and residential) — Fees are calculated at a rate of 0.0075 (3/4 of 1%) of the construction valuation. Minimum fee: $100 (fee covers the costs of one inspection).' Directly read from the ordinance PDF (page 33) on 2026-07-20; no distinct EV-charger line item exists, so this general Building Permit fee mechanism governs EV/EVSE installation valuation.
Plan Review Fee65% of the applicable building permit fee (may be waived if plan review is not necessary, per the Building Official)Summit County Building Department Fee Schedule, Ordinance 834-P, item 3.
Utah State Surcharge1% of all permitsSummit County Building Department Fee Schedule, Ordinance 834-P, item 9, collected and remitted to the State of Utah per UCA 15A-1-209.

Fire Sprinkler & Fire Alarm System Permit

Unincorporated Summit County's Community Development/Building Division does not itself operate a fire marshal's office or issue fire sprinkler/alarm permits. Instead, new installation, alteration, or extension of a fire sprinkler system (NFPA 13/13R/13D) or fire alarm system (NFPA 72) is permitted and plan-reviewed directly by whichever independent local fire protection district serves the property's location -- separate from, and in addition to, the County building permit issued through EPROCESS360. This jurisdiction's own commercial-building-permit entry already lists a 'Fire Approval Letter' from the applicable fire district as a required document and a 'Fire District Inspection' as a required step before Certificate of Occupancy; this entry documents that separate fire-district-run process itself. Two districts covering unincorporated Summit County were independently verified with live fee/process data: Park City Fire District (covers the Snyderville Basin west side -- Kimball Junction, Jeremy Ranch, Pinebrook, Trailside, Silver Summit, and similar subdivisions) and North Summit Fire District (covers the Coalville/eastern county area). A third district, South Summit Fire District, also reviews fire sprinkler installations in its own coverage area (the Kamas Valley/eastern county) per NFPA 13-D. Its current live site (southsummitfd.gov) is a JavaScript single-page application whose Permits section submits directly to a Stripe-backed payment API (react-with-backend.onrender.com/api/sprinkler) that calculates a fee dynamically from submitted square footage rather than publishing a static rate, so no current flat or per-square-foot sprinkler fee is publicly readable on the live site. A historical figure was recovered via Wayback Machine from the district's former official domain (ssfd.us, since retired in favor of southsummitfd.gov): a 2023-labeled fee schedule page (last archived with full content 2024-06-07) listed 'Sprinkler/Fire Suppression Fees $250.00*'. This figure is over two years old and cannot be confirmed as still current given the site's redesign to a dynamic calculator -- treat it as historical context only and confirm the actual current amount directly with South Summit Fire District at (435) 783-2375 before relying on it.

Reviewed 2026-07-20 · Source

Requirements

  • New installation, alteration, or extension of a fire sprinkler system or fire alarm system on a property in unincorporated Summit County
  • Plan review and permitting is performed by the fire protection district with jurisdiction over the property's location, not by the County Building Division
  • Park City Fire District: online application and fee payment required before plan review begins, per the district's official 'Permits for Fire Prevention' page -- 'Fees must be paid before your plan review can begin.'
  • North Summit Fire District: 'Summit County requires a district representative's signature on building and lot permits' -- quoted from the district's official Building Regulations page
  • North Summit Fire District's Residential Sprinkler System Review Form requires: 'Information/plans shall be uploaded by a professional sprinkler engineer with a NICET 3 level stamp of approval' -- quoted from the district's official Building Regulations page

Required documents

  • RequiredFire Sprinkler/Alarm Plan Review Application (district-specific online form)Park City Fire District's 'Project and Permit Review' online form requires selecting 'Fire Sprinkler System' or 'Fire Alarm System' as the construction type, along with project location, parcel number, and applicant information, before fees are calculated and plan review begins.
  • RequiredShop Drawings, Hydraulic Calculations, and Cut Sheets (sprinkler systems)Per Park City Fire District's online application, a fire sprinkler system submittal requires shop drawings, hydraulic calculations, cut sheets for all components required to be listed, and seismic calculations for commercial projects.
  • RequiredShop Drawings, Battery Calculations, and Input/Output Matrix (alarm systems)Per Park City Fire District's online application, a fire alarm system submittal requires shop drawings, battery calculations, cut sheets for all listed components, and an input/output matrix.
  • RequiredNICET 3-Stamped Sprinkler Plans (North Summit Fire District residential sprinkler review)North Summit Fire District's Residential Sprinkler System Review Form requires plans uploaded by a professional sprinkler engineer bearing a NICET Level 3 stamp of approval, submitted by a Utah-licensed sprinkler contractor.

Fee schedule

Fee typeAmountNotes
North Summit Fire District -- Residential Fire Sprinkler Plan Review$0.40 per square footNorth Summit Fire District Fee Schedule, Resolution 2026-02 (adopted 3/13/2026, effective 3/14/2026), 'IV. Fire Marshal & Plan Review Fees' -- 'Residential Plan Review $0.40/sq ft.' This is the district's general residential plan review line; the schedule does not break out a sprinkler-only sub-rate separate from the general residential plan review.
North Summit Fire District -- Residential Site/Sprinkler Inspection$165.00 per inspectionNorth Summit Fire District Fee Schedule, Resolution 2026-02 -- 'Residential Site Inspection $165.00/inspection'; the same fee schedule separately lists 'Sprinkler Inspection $165.00' and 'Alarm Inspection $165.00' as line items.
North Summit Fire District -- Commercial/Multifamily Plan Review$125.00 (1-20,000 sq ft), $225.00 (20,001-50,000 sq ft), or $325.00 (50,001+ sq ft)North Summit Fire District Fee Schedule, Resolution 2026-02 -- tiered by total commercial/multifamily square footage.
North Summit Fire District -- Commercial/Multifamily Fire Sprinkler Inspection$165.00 per inspectionNorth Summit Fire District Fee Schedule, Resolution 2026-02, 'Commercial/Multifamily Fire Sprinkler Insp. $165.00/inspection.'
Park City Fire District -- Plan Review Fee (base, fire sprinkler/alarm project types)$165.00 (base figure shown by the district's online calculator before dwelling-unit/square-footage inputs are applied)Fetched directly from Park City Fire District's live 'Project and Permit Review' online application form (pcfd.org/product/project-and-permit-review/) on 2026-07-20, which lists 'Fire Sprinkler System' and 'Fire Alarm System' as selectable construction types. The form is a Gravity Forms fee calculator; $165.00 was the Plan Review Fee value rendered in the static page before any dwelling-unit or square-footage figures were entered, so it may be a default/base value rather than a fixed flat fee -- confirm the final calculated total directly with PCFD at (435) 940-2532.
Park City Fire District -- Prepaid Inspection Fee$160.00 per prepaid inspection (base figure shown by the district's online calculator)Fetched from the same live PCFD online application form on 2026-07-20; same base-value caveat as the Plan Review Fee above applies.
South Summit Fire District -- Sprinkler/Fire Suppression Fee (HISTORICAL, unconfirmed current)$250.00 flat fee (as of a 2023-labeled fee schedule, last confirmed live 2024-06-07)NOT independently confirmed as currently accurate. Recovered via Wayback Machine snapshot (2024-06-07) of the district's former official site, ssfd.us/fee-schedule-2/ (labeled '2023 Sprinkler/Fire Suppression Fees $250.00*'), which no longer resolves live. The district's current live site, southsummitfd.gov, is a JavaScript SPA whose sprinkler permit form submits to a Stripe-backed API (react-with-backend.onrender.com/api/sprinkler) that computes a fee dynamically from submitted square footage rather than publishing a static rate -- the compiled JS bundle was fetched and inspected directly on 2026-07-20 and contains no visible rate table. This $250 figure may be outdated. Confirm the current fee directly with South Summit Fire District, (435) 783-2375, before relying on it.

Solar Photovoltaic (PV) Installation Permit

Verified

Unincorporated Summit County requires a Building Permit for solar PV installations, per the County Building Department's official page: 'Permits are also required for solar PV installations.' Unlike the general residential/commercial Building Permit (which is priced off the ICC Building Valuation Data table and a non-public multiplier), the County's own Building Department Fee Schedule (Ordinance 834-P) prices solar PV under a distinct 'Alternative Energy Permits' category — explicitly described in the ordinance as 'separate from the permits issued for new construction' — with a flat $700 Photovoltaic System fee. Applications are still submitted through the same EPROCESS360 online portal as all other County building permits; no standalone solar-only application form, checklist, or fee schedule document is currently published (the County's historical 'Solar ABCs' expedited-permitting checklist, once posted at DocumentCenter View 272, is now a dead link with no Wayback capture, confirmed by this verification).

Verified 2026-07-21 · Source

Requirements

  • A County Building Permit is required for solar PV installations (residential or commercial) in unincorporated Summit County, per the Building Department's official page
  • Application is submitted through the EPROCESS360 online portal (summit.co.ut.eprocess360.com) — the County does not accept paper plans or perform over-the-counter reviews, and no distinct solar-only application form is published
  • Electrical interconnection work must comply with the 2023 National Electrical Code (NEC), adopted statewide per Utah Code § 15A-2-103(1)(g)
  • For roof-mounted arrays, standard structural attachment/point-load documentation may be requested during plan review, consistent with the County's general Construction Plans requirements for structural elements (no solar-specific structural checklist is separately published)
  • Confirm with the Building Department at (435) 336-3124 whether a given project (e.g., ground-mounted array, battery storage addition) needs additional planning/zoning review beyond the building permit

Required documents

  • RequiredBuilding Permit Application (EPROCESS360 online portal)Submitted online at summit.co.ut.eprocess360.com, the same portal used for all other Summit County building permit types; no distinct solar-PV application form or checklist is currently published by the County.
  • RequiredPV System Plans / Single-Line Electrical DiagramModule layout, inverter/equipment specifications, and interconnection single-line diagram documenting compliance with the 2023 NEC.
  • OptionalStructural Attachment Details (roof-mounted arrays)Racking/attachment method and point-load information for the roof structure; no solar-specific structural checklist is separately published, so this follows the general structural-documentation expectations described in this file's residential/commercial building-permit entries.

Fee schedule

Fee typeAmountNotes
Alternative Energy Permit — Photovoltaic System$700 flat feeSummit County Building Department Fee Schedule, Ordinance 834-P (amended May 2026, effective 6/2026), item 4: 'Alternative Energy Permits: These permits are separate from the permits issued for new construction. These permits include, but are not limited to, solar, hot water, photovoltaic, geo-thermal, and wind generated power. a. Photovoltaic System: $700.' Confirmed directly by this verification: the document is a scanned (non-machine-readable) PDF, so it was downloaded and page 33 was rendered to an image and read visually on 2026-07-21 — the $700 Photovoltaic System line is explicitly distinct from the general 0.0075-of-valuation Building Permit Fee used for new construction.
Plan Review Fee65% of the applicable building permit fee (may be waived if plan review is not necessary, per the Building Official)Summit County Building Department Fee Schedule, Ordinance 834-P, item 3. The ordinance does not clarify whether this 65% add-on applies on top of the flat $700 Alternative Energy Permit fee or only to the valuation-based Building Permit Fee in item 2 — confirm with the Building Department before budgeting.
Utah State Surcharge1% of all permitsSummit County Building Department Fee Schedule, Ordinance 834-P, item 9, collected and remitted to the State of Utah per UCA 15A-1-209 — stated to apply to 'all permits,' so this applies to the Alternative Energy Permit fee as well.

Sign Permit

Verified

Unincorporated Summit County requires a sign permit before any sign is erected, relocated, or enlarged, administered by the Community Development Department's Planning Division -- a separate process from the Building Division's EPROCESS360 portal used for this file's other permit types. Sign design standards are set at the Title/Chapter level and differ by planning district: the Snyderville Basin (Silver Creek, Pinebrook, Jeremy Ranch, Summit Park, and the resort-adjacent area surrounding Park City) is governed by Snyderville Basin Development Code Section 10-8-2, most recently amended by Ordinance No. 1010 (adopted by the Summit County Council on/around April 22-23, 2026); the East Side/3-Mile/Henefer-area communities are governed by the parallel Eastern Summit County Development Code Section 11-6-4, whose full standards were read directly from the County's own published code PDF on 2026-07-22. The County-Wide Fee Schedule (Ordinance 834-P, as amended, Community Development Department Fee Schedule, item 20) sets a flat fee of $100 per sign, confirmed live 2026-07-22.

Verified 2026-07-23 · Source

Requirements

  • "No sign shall be erected, relocated or enlarged until the plan for such sign has been approved and a permit issued by the CDD or designated planning staff member" -- quoted directly from Eastern Summit County Development Code Section 11-6-4
  • Nameplates, property signs, service signs, and temporary signs conforming to the applicable title's provisions may be erected without a sign permit; campaign signs are also exempt from the permit requirement but must still meet size, height, setback, and no-illumination limits (Section 11-6-4(H))
  • Snyderville Basin sign standards (Section 10-8-2) were amended by Ordinance No. 1010 following an April 22, 2026 public hearing (Project No. 26-029) -- the amendment narrowly expanded allowed digital-display uses (fuel-station price signs, drive-thru menu boards, resort entry/event signage) and strengthened enforcement provisions for removing temporary/pop-up signs; County planning staff discussed brightness limits of 2,000 nits (daytime) and 200 nits (nighttime) for digital displays during the hearing process
  • Eastern Summit County freestanding sign count is tied to street frontage: lots with less than 300 feet of frontage on one street are allowed one freestanding sign; lots with 300 feet or more are allowed two (Section 11-6-4(A))
  • Freestanding signs must be set back at least 5 feet from any property or right-of-way line (Section 11-6-4(B))
  • Sign size (Eastern Summit County): 1 square foot of sign area is permitted for every 5 feet of continuous linear building frontage upon which the sign is mounted, up to a maximum of 30 square feet; freestanding signs may not exceed 40 square feet (Section 11-6-4(C))
  • Off-premises signs are prohibited -- no sign may advertise a use or activity located on a lot or parcel other than the one the sign is erected on (Section 11-6-4(I))
  • Real estate sale signs must be set back at least 30 feet from the edge of an adjacent road surface, or no closer than an existing fence line parallel to the road if that distance is less (Section 11-6-4(G))

Required documents

  • RequiredSign Permit application materials (submitted by email)Re-chased 2026-07-23: the County's old standalone Sign Permit Application PDF (DocumentCenter View 957) is confirmed permanently retired, not merely broken -- the County's current 'Application Forms' page (827/Application-Forms) lists 26 specific planning-permit application PDFs by document ID (Variance, Conditional Use Permit, Final Site Plan, Sketch Plan, Temporary Use Permit, etc.) and Sign Permit is not among them. In its place, a live 'Sign Permit Checklist' (DocumentCenter View 22930, current as of 6/2026) is now the operative submittal document -- confirmed live 2026-07-23, it lists the required attachments and states 'Review timeframes are ESTIMATED to be 7 business days.' Per the County's official Planning & Zoning page (summitcountyutah.gov/307/Planning-Zoning), under 'How to apply for a Planning Permit': 'To apply for a planning permit, please email the application and required materials to planningapplications@summitcountyutah.gov' -- confirming intake for Planning Division permit types (which include Sign Permits, per this entry's Development Code sourcing) is by email, not the Building Division's EPROCESS360 portal.
  • RequiredSign Plan / Elevation DrawingShowing sign type, dimensions, total sign area calculation, height, and location/setback on the lot, needed to demonstrate compliance with the applicable title's size, height, and setback standards (Eastern Summit County Development Code Section 11-6-4(B)-(C); Snyderville Basin Development Code Section 10-8-2).
  • OptionalProperty Owner AuthorizationMay be requested for tenant signage on a leased commercial space; not separately confirmed on a current application form for this entry.

Fee schedule

Fee typeAmountNotes
Sign Permit Fee$100 per signSummit County-Wide Fee Schedule (Ordinance 834-P, as amended), Summit County Community Development Department Fee Schedule, item 20: "Sign Permit: $100/sign." Directly read from the ordinance PDF (Community Development Department Fee Schedule page) on 2026-07-22. This fee sits under the Community Development Department's fee schedule, separate from the Building Department Fee Schedule's 65% Plan Review Fee add-on and 1% Utah State Surcharge line items documented elsewhere in this file -- neither of those add-ons is listed against the Sign Permit line item, so they do not appear to apply here.

Certificate of Occupancy / Change of Use

Verified

Unincorporated Summit County does not operate a standalone "change of use" permit separate from its Certificate of Occupancy (C.O.) process. Per Snyderville Basin Development Code Section 10-3-20(J) (Certificates of Occupancy) -- this file's own localAmendments entry already documents Section 10-3-20 as this jurisdiction's countywide Building Permit and Certificate of Occupancy provision -- a Certificate of Occupancy is required "before any structure or premises, or part thereof, hereafter erected, changed, converted, moved, altered or enlarged wholly or in part, may be used or occupied," making a change of use itself one of the events that triggers a required C.O. For commercial tenant spaces specifically, a change of use is also a documented trigger in this file's commercial-tenant-improvement-permit entry (it requires a Site Plan, and a change-of-use remodel must be designed by a Utah-licensed architect), so a genuine change-of-use project in an existing commercial building generally proceeds through that Commercial Tenant Improvement / Tenant Finish permit process (or, for a change of use with no construction work, directly through a standalone C.O. application) rather than through a separately named "change of use permit." This entry documents the County's own Certificate of Occupancy requirements, directly sourced from its "Items needed to receive a Certificate of Occupancy" checklist (updated 11/25, confirmed live 2026-07-22).

Verified 2026-07-23 · Source

Requirements

  • A Certificate of Occupancy is required before any structure or premises "erected, changed, converted, moved, altered or enlarged wholly or in part" may be used or occupied -- quoted directly from Snyderville Basin Development Code Section 10-3-20(J)(1)
  • If a building permit was required for the work, construction reflected in the approved building permit must be fully completed before a C.O. can issue (Section 10-3-20(J)(1)(a))
  • If no building permit was required (e.g., a pure change of use with no construction), the use itself must conform to the Development Code and all other applicable statutes/ordinances, or qualify as a valid legal nonconforming use under Section 10-8-1 (Section 10-3-20(J)(1)(b))
  • All applicable impact fees and other regulatory fees and requirements must be paid before a C.O. is issued (Section 10-3-20(J)(1)(c))
  • An application for a Certificate of Occupancy must be submitted to the Building Official on the form provided by the County, accompanied by the required processing fee (Section 10-3-20(J)(2)) -- re-chased 2026-07-23, no dollar figure for this processing fee exists as a distinct line item anywhere in either the complete Building Department Fee Schedule (12 items) or the complete Community Development Department Fee Schedule (25 items) of Ordinance 834-P (verified-negative, both schedules read in full); for projects requiring a building permit it is functionally covered by that permit's own Building Permit Fee (0.0075 of construction valuation, $100 minimum)
  • Final Building and Engineering inspections are required prior to C.O. issuance for new construction; a final Engineering inspection is not required for a tenant improvement, per the County's own "Items needed to receive a Certificate of Occupancy" checklist
  • A Final Fire Inspection report is required for all permits for a dwelling unit, verifying life-safety systems, access methods, and identification; if fire sprinklers were required, a Final Fire Sprinkler Inspection report from the applicable fire district (Park City Fire District, North Summit Fire District, or South Summit Fire District -- see this file's fire-sprinkler-alarm-permit entry) is also required
  • Water/sewer final approval requirements depend on the utility source: no final water approval is needed for a well (but the well log must be uploaded with final documents); a final approval letter/authorization to use is required from the applicable water system (e.g., Mountain Regional Water, Gorgoza); a final approval letter from Snyderville Basin Water Reclamation District is required for sewer-served projects; and Final Wastewater Approval from the Summit County Health Department is required for septic systems
  • Planning Department approval is only required for projects that require a final site plan submitted through Planning (e.g., retail stores, hotels, condos, townhomes, apartments) -- this excludes most single-family dwellings, per the County's C.O. checklist

Required documents

  • RequiredCertificate of Occupancy ApplicationSubmitted to the Building Official on the County-provided form, per Development Code Section 10-3-20(J)(2); accompanied by the required processing fee (amount not published).
  • RequiredFinal Building Inspection ApprovalRequired prior to C.O. issuance for new construction, per the County's "Items needed to receive a Certificate of Occupancy" checklist.
  • OptionalFinal Engineering Inspection ApprovalRequired for new construction; not required for a tenant improvement project.
  • RequiredFinal Fire Inspection ReportRequired for all permits for a dwelling unit to verify life-safety systems, access methods, and identification are in place; obtained from the applicable local fire district.
  • OptionalFinal Fire Sprinkler Inspection ReportRequired only if fire sprinklers were required to be installed for the project; obtained from the applicable fire district.
  • OptionalWater System Final Approval Letter / Well LogA well log upload is required in lieu of a final approval if the project is served by a private well; a final approval/authorization-to-use letter is required if served by a water system such as Mountain Regional Water or Gorgoza.
  • OptionalSewer or Septic Final ApprovalA final approval/authorization-to-use letter from Snyderville Basin Water Reclamation District is required for sewer-served projects; Final Wastewater Approval from the Summit County Health Department is required for septic-served projects.
  • OptionalFinal Site Plan / Planning ApprovalOnly required for projects that needed a final site plan submitted through the Planning Department (e.g., retail stores, hotels, condos, townhomes, apartments) -- excludes most single-family dwellings.

Fee schedule

Fee typeAmountNotes
Certificate of Occupancy Processing Fee -- verified-negative: no distinct C.O. fee line item existsNo separate dollar figure; bundled into the general Building Permit Fee for projects requiring a building permitDevelopment Code Section 10-3-20(J)(2) states a C.O. application "shall be accompanied by the required processing fee" but does not itself state the amount. Re-chased 2026-07-23 by downloading Ordinance 834-P directly and rendering every page of both candidate department fee schedules to images and reading them in full: the Summit County Building Department Fee Schedule (page 33, items 1-10, plus page 34, items 11-12) and the Summit County Community Development Department Fee Schedule (pages 27-28, the complete 25-item list ending at item 25 'Vested Rights Determination') -- neither contains a 'Certificate of Occupancy' line item anywhere. This is a confirmed verified-negative, not an unread gap: no standalone C.O. processing fee is published anywhere in the County's fee ordinance. For projects that required a building permit, the processing fee is functionally absorbed into that permit's own Building Permit Fee (Ordinance 834-P item 2: 0.0075 of construction valuation, $100 minimum -- see this file's residential/commercial/tenant-improvement-permit entries), which the applicant already pays before the C.O. stage. For a pure change-of-use C.O. with no building permit involved, no fee amount is published at all; contact the Building Department at (435) 336-3124 or buildingquestions@summitcountyutah.gov to confirm what, if anything, is charged in that specific scenario.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Summit County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-08)View current record →All versions →

Permalink: /utah/summit-county-ut/unincorporated-summit/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.