This is PermitBase’s published record for Cedar Hills as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Cedar Hills building permits
VerifiedCedar Hills, Utah — as published 2026-07-19.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for all new residential construction in Cedar Hills, regulated by the adopted 2021 IRC / 2024 IBC (per Utah Code § 15A-2-103, effective 7/1/2026 — Cedar Hills' own Building Permit Requirements form has not yet been updated to reflect the 2024 IBC as of 2026-07-16). The city's fee schedule charges a valuation-based Building Permit fee (no separate printed dollar table; assessed 'Based on valuation' per the International Building Code, i.e. IBC Section 109 / ICC Building Valuation Data methodology) plus a mandatory Residential Plan Check fee (65% of the building permit fee) and a tiered, square-footage-based Plan Check Deposit due at application.
Verified 2026-07-08 · Source
Requirements
- New single-family residential construction regulated by the adopted 2021 IRC / 2024 IBC (per Utah Code § 15A-2-103, effective 7/1/2026)
- Completed Building Permit Application (submitted via the online iworq permit portal or by print application)
- 2 sets of building plans drawn to scale, including a site plan (north arrow, lot dimensions, setbacks, easements, property lines, water meter/sewer lateral location, driveway/hard-surface locations, retaining walls, and topographical details if slope exceeds 10%)
- Construction plans: floor plans, footing/foundation details, structural framing, electrical/mechanical/plumbing design details, energy code compliance documentation (RES Check, COMM Check, Manual D/J/S as applicable)
- Structural calculations stamped by a Utah-licensed structural engineer (roof trusses may be a deferred submittal)
- Geotechnical report, including slope stability evaluation and retaining wall design, if lot slope exceeds 15%
- HOA approval if applicable
- Plan Check Deposit, based on gross square footage and/or valuation, due at application
Required documents
- RequiredBuilding Permit Requirements ChecklistCity of Cedar Hills' official checklist (revised 06/12/2025) listing all required plan-set contents, structural/energy documentation, and the plan check deposit requirement.
- RequiredBuilding Permit ApplicationSubmitted online via the Cedar Hills iworq Building Permit Portal (cedarhills.portal.iworq.net/portalhome/cedarhills), or as a Non-Digital (print) application for new construction, remodels, accessory buildings, HVAC, roofing, and solar installations.
- OptionalOwner/Builder Certification and Agreement to Comply with the Construction Trades Licensing ActUtah Division of Occupational and Professional Licensing (DOPL) form, required only if the property owner is acting as their own contractor; filed with the city Building Department, which forwards it to DOPL.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Based on valuation (no flat table published; assessed per International Building Code valuation methodology) | City of Cedar Hills Fee Schedule, effective 07/01/2026, Planning/Building/Zoning section: 'Building Permit — Based on valuation — Building Permit — International Building Code.' No standalone… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026, Planning/Building/Zoning section: 'Building Permit — Based on valuation — Building Permit — International Building Code.' No standalone dollar/square-footage table is published by Cedar Hills; valuation is assessed under the adopted 2021 IBC's valuation-based permit fee framework. |
| Residential Plan Check Fee | 65% of building permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Residential Plan Check — 65% of building permit fee — Building Permit — Resolution 04-21-2015A.' |
| 1% State Fee | 1% of Building Permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026: '1% State Fee — 1% of Building Permit — Building Permit — International Building Code' (statewide surcharge collected via the local building permit). |
| Residential Plan Check Deposit | $300.00 (1-275 sq ft) up to $3,900.00 (9,501-10,000 sq ft), tiered by gross square footage; Estimated Actual Cost for 10,000+ sq ft | City of Cedar Hills Fee Schedule, effective 07/01/2026, full tiered table (e.g. 1,801-2,100 sq ft: $1,100.00; 2,701-3,000 sq ft: $1,500.00; 4,701-5,000 sq ft: $2,300.00), due 'At Application' per Resolution 02-07-2017A. |
| Refundable Improvement Bond | $4,000.00 (general); $3,000.00 for pools and accessory structures | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Refundable Improvement Bond — $4,000.00 — Building Permit — Resolution 05-21-2024B' and 'Refundable Improvement Bond – Pools and Accessory Structures — $3,000.00.' |
| New Construction Utility Fees (Per ERU) | Construction Water Fee $150.00; Water Meter (3/4") & Installation $575.00; Water Lateral Inspection $75.00; Sewer Lateral Inspection $75.00; Gas Line Inspection (Residential) $53.00; Temporary/Permanent Power Inspection, each (Residential) $53.00; Pressurized Irrigation Infrastructure $656.90 | City of Cedar Hills Fee Schedule, effective 07/01/2026, 'New Construction Fees (Per ERU)' table, all collected at Building Permit issuance. |
| Impact Fees (Per ERU) | Parks (Single Family) $2,256.00; Public Safety (Residential, per unit) $495.13; Sewer (Cedar Hills, 3/4") $928.80; Culinary Water (3/4" meter) $887.53; plus Transportation impact fee (Single Family Detached Housing) $852.54 | City of Cedar Hills Fee Schedule, effective 07/01/2026, 'Impact Fees (Per ERU)' and 'Transportation' tables, collected at Building Permit. |
| Re-inspection Fee | $100.00 | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Re-inspection Fee — $100.00 — Prior to Re-inspect — Resolution 09-20-2005A.' |
Residential Addition / Remodel / Basement Finish Permit
VerifiedRequired for additions, remodels, and basement finishes in Cedar Hills. The city publishes a separate Basement Permit Requirements checklist distinct from new-construction requirements, and charges a reduced 26% Residential Plan Check rate (vs. 65% for new construction) for basement finishes, small structures, and solar.
Verified 2026-07-08 · Source
Requirements
- Additions and remodels to existing one- and two-family residential structures, regulated by the adopted 2021 IRC
- Basement finish work: 2 sets of scale drawings (1/4" = 1'), gross floor area and room sizes, labeled rooms including proposed future use of unfinished areas, identification of new vs. existing construction
- Window sizes/types, ceiling heights, smoke/CO detector locations, electrical device types and locations, plumbing fixture locations, water heater/floor drain/water softener locations, furnace and return air location, heat source in all habitable rooms
- Gas line drawing required for any additional gas-fired appliances or gas line extension
- Blue Stakes (811) utility locate required before any digging
- HOA-approved and signed plans required for any exterior changes (e.g. walkouts), if applicable
- Plan Check Deposit not required for basement finishes only (per the city's Building Permit Requirements form), but the reduced 26% Plan Check fee still applies
Required documents
- RequiredBasement Permit Requirements ChecklistCity of Cedar Hills' official checklist specific to basement plan submittals, covering room labeling, life-safety devices, MEP locations, and utility-locate requirements.
- RequiredBuilding Permit ApplicationSubmitted online via the Cedar Hills iworq Building Permit Portal, or as a Non-Digital (print) application.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Based on valuation (per International Building Code) | City of Cedar Hills Fee Schedule, effective 07/01/2026: same valuation-based 'Building Permit' line item used for all construction types; no separate flat fee for additions/remodels/basements. |
| Residential Plan Check (Basement Finish/Small Structures/Solar) | 26% of building permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Residential Plan Check (Basement Finish)(Small Structures)(Solar) — 26% of building permit fee — Building Permit — Resolution 01-05-2021A.'… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026: 'Residential Plan Check (Basement Finish)(Small Structures)(Solar) — 26% of building permit fee — Building Permit — Resolution 01-05-2021A.' Confirmed distinct from the 65% rate used for new residential construction generally. |
| 1% State Fee | 1% of Building Permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026. |
| Refundable Improvement Bond | $4,000.00 (general); $3,000.00 for pools/accessory structures | City of Cedar Hills Fee Schedule, effective 07/01/2026, Resolution 05-21-2024B. |
Solar Panel (PV) Permit
VerifiedRequired for residential rooftop solar photovoltaic installations in Cedar Hills. Requires a Building Permit Application, two sets of plans meeting the city's Solar PV System Plan Review Requirements checklist, and a $300 plan-check deposit (check only, per the city's Installation Permit page).
Verified 2026-07-08 · Source
Requirements
- Building Permit Application, with 'solar panel installations' work type
- Two copies of a detailed site plan showing the home and all PV system components
- Structural Engineer of Record report/evaluation confirming the roof can support the added array load; Utah-licensed structural engineer, wet-stamped
- Mounting system details: module mounting system, added component weight, roof covering type and number of layers
- One-line diagram: PV system type, module count/wiring/layout, wire types/sizes, conduit, component locations, fuse/breaker ratings, and which home electrical panel the system backfeeds to
- Module manufacturer spec sheets (rated watts, volts, amps, Voc, Isc)
- Inverter manufacturer spec sheets (rated watts/volts, max AC output amps/voltage); utility-tied inverters must be listed 'utility interactive' meeting UL 1741 with ground fault protection
- Total array power calculations (watts, amps, volts, Voc at coldest expected temperature per NEC 690.7, Isc)
- System component listings and equipment ratings
- Illustrations of required signage and sign locations
- HOA-approved and signed plans, if applicable
- $300 plan-check deposit, check only
Required documents
- RequiredSolar PV System Plan Review Requirements ChecklistCity of Cedar Hills' official Solar Photovoltaic (PV) System Plan Submittal Checklist (form dated CHBD 08162016), covering site plan, structural engineer evaluation, mounting system, one-line diagram, module/inverter specs, array power calculations, component listings, and signage.
- RequiredBuilding Permit ApplicationSubmitted online via the Cedar Hills iworq Building Permit Portal, or as a Non-Digital (print) application, for solar panel installations.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Based on valuation (per International Building Code) | City of Cedar Hills Fee Schedule, effective 07/01/2026: solar installations use the same valuation-based 'Building Permit' line item; no separate flat solar permit fee is published. |
| Residential Plan Check (Solar) | 26% of building permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Residential Plan Check (Basement Finish)(Small Structures)(Solar) — 26% of building permit fee — Resolution 01-05-2021A.' |
| Solar Plan-Check Deposit | $300.00 (check only) | City of Cedar Hills official Installation Permit page and Building Department FAQ: 'A building permit, two sets of plans, and a plan-check deposit of $300 are required for installation of solar… Show full citationHideCity of Cedar Hills official Installation Permit page and Building Department FAQ: 'A building permit, two sets of plans, and a plan-check deposit of $300 are required for installation of solar panels.' The Installation Permit page specifies the deposit must be paid by check only. |
| 1% State Fee | 1% of Building Permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026. |
Commercial Building Permit
VerifiedRequired for new commercial construction (including commercial shell buildings) in Cedar Hills, regulated by the adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective 7/1/2026; Cedar Hills' own Building Permit Requirements form still lists the 2021 IBC as of its 06/12/2025 revision, live re-checked 2026-07-16). Cedar Hills is a small, almost entirely residential planned community with limited commercial zoning concentrated along Cedar Hills Drive, but its Fee Schedule maintains a distinct 'Commercial/Industrial Plan Check' line (65% of the building permit fee), standalone commercial trade-permit and trade-inspection fees, non-residential impact fees, and a Cedar Hills Drive-specific street improvement fee, all separate from the residential fee structure. There is no separate commercial-specific submittal checklist published — the same Building Permit Requirements form used for residential construction governs commercial submittals too, and explicitly references 'COMM Check' energy-code documentation alongside 'RES Check' for residential.
Verified 2026-07-19 · Source
Requirements
- New commercial construction, regulated by the adopted 2024 IBC (per Utah Code § 15A-2-103(1)(a), effective 7/1/2026)
- Completed Building Permit Application (submitted via the online iworq permit portal or by print application)
- 2 sets of building plans drawn to scale, including a site plan (north arrow, lot dimensions, setbacks, easements, property lines, water meter/sewer lateral location, driveway/hard-surface locations, retaining walls), per the city's Building Permit Requirements form — the same checklist used for residential submittals
- Construction plans: floor plans, footing/foundation details, structural framing, electrical/mechanical/plumbing design details, and Energy Code compliance documentation via COMM Check (the Building Permit Requirements form explicitly lists 'RES Check, COMM Check, Manual D, J & S, etc. as applicable')
- Structural calculations stamped by a Utah-licensed structural engineer
- Concept/Preliminary/Final Site Plan Review approval for new commercial development — a separate Planning-level review process from the building permit itself, per the city's Fee Schedule
- Commercial/Industrial Plan Check Deposit, estimated actual cost, due at application
- Fire Department in-house plan review submittal if the project includes an automatic fire sprinkler system or fire alarm system
Required documents
- RequiredBuilding Permit Requirements ChecklistCity of Cedar Hills' official checklist (revised 06/12/2025), used for both residential and commercial submittals; explicitly lists 'COMM Check' as acceptable Energy Code compliance documentation for commercial projects. No separate commercial-only checklist is published by the city.
- RequiredBuilding Permit ApplicationSubmitted online via the Cedar Hills iworq Building Permit Portal (cedarhills.portal.iworq.net/portalhome/cedarhills), or as a Non-Digital (print) application.
- RequiredConcept/Preliminary/Final Site Plan Review ApplicationRequired Planning-level review for new commercial development prior to or alongside the building permit; fee is billed separately from the building permit fee per the city's Fee Schedule.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Based on valuation (no flat table published; assessed per International Building Code valuation methodology) | City of Cedar Hills Fee Schedule, effective 07/01/2026, Planning/Building/Zoning section: 'Building Permit — Based on valuation — Building Permit — International Building Code.' Same line item used… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026, Planning/Building/Zoning section: 'Building Permit — Based on valuation — Building Permit — International Building Code.' Same line item used for both residential and commercial construction; no separate commercial dollar table is published. |
| Commercial/Industrial Plan Check | 65% of building permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Commercial/Industrial Plan Check — 65% of building permit fee — Building Permit — Resolution 09-20-2011B.' |
| Commercial/Industrial Plan Check Deposit | Estimated Actual Cost | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Commercial/Industrial Plan Check Deposit — Estimated Actual Cost — At Application — Resolution 02-07-2017A.' |
| 1% State Fee | 1% of Building Permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026: '1% State Fee — 1% of Building Permit — Building Permit — International Building Code.' |
| Commercial Site Plan Review Fee (Concept/Preliminary/Final) | $2,000.00 + $150.00 per lot | City of Cedar Hills Fee Schedule, effective 07/01/2026, Development Fees section: 'Concept/Preliminary/Final Site Plan Review – Commercial — $2,000.00 + $150.00/Lot — At Application — Resolution… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026, Development Fees section: 'Concept/Preliminary/Final Site Plan Review – Commercial — $2,000.00 + $150.00/Lot — At Application — Resolution 08-05-2025B.' A Planning-level development fee, billed separately from the building permit fee. |
| Commercial Trade Inspection Fees | Gas Line Inspection (Commercial) $65.00; Temporary Power & Permanent Power Inspection, each (Commercial) $65.00 | City of Cedar Hills Fee Schedule, effective 07/01/2026, New Construction Fees (Per ERU) table: 'Gas Line Inspection (Commercial) — $65.00 — Building Permit — Resolution 01-05-2021A' and 'Temporary… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026, New Construction Fees (Per ERU) table: 'Gas Line Inspection (Commercial) — $65.00 — Building Permit — Resolution 01-05-2021A' and 'Temporary Power & Permanent Power Inspection (each)(Commercial) — $65.00 — Building Permit — Resolution 01-05-2021A.' Both are higher than the $53.00 residential equivalents on the same table. |
| Commercial Trade Permits (Plumbing/Mechanical/Electrical) | $35.00 each | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Plumbing Permit (Commercial) — $35.00', 'Mechanical Permit (Commercial) — $35.00', and 'Electrical Permit (Commercial) — $35.00 — Building… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026: 'Plumbing Permit (Commercial) — $35.00', 'Mechanical Permit (Commercial) — $35.00', and 'Electrical Permit (Commercial) — $35.00 — Building Permit — Resolution 01-05-2021A' (three separate line items). Residential trade work has no equivalent standalone fee — it is folded into the residential Building Permit fee. |
| Non-Residential Impact Fees (Per ERU/unit) | Public Safety (Non-Residential, per 1,000 unit) $711.18; Sewer (Cedar Hills, Non-Residential, by meter size) $1,207.44 (1") up to $33,808.28 (10"); Culinary Water (AWWA ratio, by meter size) $887.53 (3/4") up to $14,795.12 (4") | City of Cedar Hills Fee Schedule, effective 07/01/2026, Impact Fees (Per ERU) table: 'Public Safety – Non Residential, Per 1,000 Unit — $711.18', 'Sewer (Cedar Hills), Non-Residential' meter-size… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026, Impact Fees (Per ERU) table: 'Public Safety – Non Residential, Per 1,000 Unit — $711.18', 'Sewer (Cedar Hills), Non-Residential' meter-size tiers (1" $1,207.44 through 10" $33,808.28), and 'Culinary Water / AWWA RATIOS 2023' meter-size tiers (3/4" $887.53 through 4" $14,795.12), all collected at Building Permit. |
| Transportation Impact Fee (Commercial Land Use Categories) | Varies by use, e.g. General Office Building $1,306.02 per 1,000 sq ft; Business Park $1,106.49 per 1,000 sq ft; Shopping Plaza $4,913.91 per 1,000 sq ft gross leasable area (40% pass-by); Business Hotel $281.16 per room | City of Cedar Hills Fee Schedule, effective 07/01/2026, Transportation table: 'General Office Building, 1,000 SQ FT gross floor area — $1,306.02', 'Business Park, 1,000 SQ FT gross floor area —… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026, Transportation table: 'General Office Building, 1,000 SQ FT gross floor area — $1,306.02', 'Business Park, 1,000 SQ FT gross floor area — $1,106.49', 'Shopping Plaza, 1,000 SQ FT gross leasable area (40% Pass-By) — $4,913.91', 'Business Hotel, Rooms — $281.16' — Resolution 02-07-2023B. |
| Commercial Street Improvement Fee (Cedar Hills Drive) | $10,750.00 per acre | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Commercial Street Improvement Fee (Cedar Hills Drive) – Cost Per Acre — $10,750 — Building Permit — Series 2000 Road Bond.' Applies… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026: 'Commercial Street Improvement Fee (Cedar Hills Drive) – Cost Per Acre — $10,750 — Building Permit — Series 2000 Road Bond.' Applies specifically to commercial development fronting Cedar Hills Drive, the city's primary commercial corridor. |
| Automatic Fire Protection System / Fire Alarm Plan Review (In-House) | Sprinkler system: <100 heads $75.00; 101-199 heads $100.00; 200-299 heads $150.00; >300 heads base fee plus $0.50/head ($200.00 shown). Fire alarm new system: $100.00 | City of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section: 'Automatic Fire Protection System / In House Plan Review — <100 heads $75.00, 101-199 heads $100.00, 200-299 heads… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section: 'Automatic Fire Protection System / In House Plan Review — <100 heads $75.00, 101-199 heads $100.00, 200-299 heads $150.00, >300 heads – base fee plus $0.50 per head $200.00 — Resolution 07-16-2019A' and 'Fire Alarm System (Fees are for In-House Plan Reviews Only) / Plan Review — New System $100.00 — Resolution 07-16-2019A.' |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for commercial remodel and tenant improvement (tenant finish) work in existing commercial buildings in Cedar Hills. Cedar Hills' Fee Schedule does not carry a reduced tenant-improvement plan-check rate distinct from new commercial construction — unlike the residential schedule, which discounts basement finishes/small structures/solar to 26% of the building permit fee, commercial tenant improvements are billed at the same 'Commercial/Industrial Plan Check' rate of 65% of the building permit fee as new commercial construction. No separate tenant-improvement-specific submittal checklist is published; the same general Building Permit Requirements form is used.
Verified 2026-07-19 · Source
Requirements
- Commercial remodel or tenant improvement scope within an existing commercial structure, regulated by the adopted 2024 IBC (per Utah Code § 15A-2-103(1)(a), effective 7/1/2026)
- Completed Building Permit Application (online iworq portal or print application)
- 2 sets of scale plans per the city's Building Permit Requirements form — the same general checklist used for new construction; no distinct tenant-improvement-specific checklist is published
- Structural calculations stamped by a Utah-licensed structural engineer, if the scope includes structural work
- Energy Code compliance documentation (COMM Check) if the scope affects the building envelope or mechanical/electrical systems
- Fire Alarm plan review submittal if the remodel adds to or modifies an existing fire alarm system
- Commercial Hood System plan review submittal if the scope adds or modifies a commercial kitchen exhaust hood
- Commercial/Industrial Plan Check Deposit, estimated actual cost, due at application
Required documents
- RequiredBuilding Permit Requirements ChecklistCity of Cedar Hills' official checklist (revised 06/12/2025), used generally for construction submittals including tenant improvements; no dedicated TI-specific checklist is published by the city.
- RequiredBuilding Permit ApplicationSubmitted online via the Cedar Hills iworq Building Permit Portal, or as a Non-Digital (print) application.
- OptionalFire Alarm / Commercial Hood System Plan Review SubmittalRequired only if the tenant improvement scope adds or modifies a fire alarm system or a commercial kitchen exhaust hood; reviewed in-house by the Fire Department per the city's Public Safety fee table.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based) | Based on valuation (no flat table published; assessed per International Building Code valuation methodology) | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Building Permit — Based on valuation — Building Permit — International Building Code.' Same line item used for all construction types, including tenant improvements. |
| Commercial/Industrial Plan Check | 65% of building permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Commercial/Industrial Plan Check — 65% of building permit fee — Building Permit — Resolution 09-20-2011B.' No reduced rate is published for… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026: 'Commercial/Industrial Plan Check — 65% of building permit fee — Building Permit — Resolution 09-20-2011B.' No reduced rate is published for tenant improvements/remodels distinct from new commercial construction — both fall under this single line item. |
| Commercial/Industrial Plan Check Deposit | Estimated Actual Cost | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Commercial/Industrial Plan Check Deposit — Estimated Actual Cost — At Application — Resolution 02-07-2017A.' |
| 1% State Fee | 1% of Building Permit fee | City of Cedar Hills Fee Schedule, effective 07/01/2026: '1% State Fee — 1% of Building Permit — Building Permit — International Building Code.' |
| Commercial Trade Permits (Plumbing/Mechanical/Electrical) | $35.00 each | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Plumbing Permit (Commercial) — $35.00', 'Mechanical Permit (Commercial) — $35.00', and 'Electrical Permit (Commercial) — $35.00 — Building… Show full citationHideCity of Cedar Hills Fee Schedule, effective 07/01/2026: 'Plumbing Permit (Commercial) — $35.00', 'Mechanical Permit (Commercial) — $35.00', and 'Electrical Permit (Commercial) — $35.00 — Building Permit — Resolution 01-05-2021A.' Directly relevant to TI work that reconfigures plumbing, mechanical, or electrical systems. |
| Addendum Plan Review | $65.00 | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Addendum Plan Review — $65.00 — Per Occurrence — Resolution 02-07-2023B.' Applies if submitted plans are revised after initial plan check. |
| Fire Alarm System Plan Review (Remodel) | $50.00 | City of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section: 'Fire Alarm System (Fees are for In-House Plan Reviews Only) / Plan Review — Remodel — $50.00 — Resolution 07-16-2019A.' |
| Commercial Hood Systems Plan Review | $100.00 per hood | City of Cedar Hills Fee Schedule, effective 07/01/2026, Public Safety section: 'Commercial Hood Systems / Plan Review each hood — $100.00 — Resolution 07-16-2019A.' Relevant to restaurant/food-service tenant finish work adding a kitchen exhaust hood. |
| Re-inspection Fee | $100.00 | City of Cedar Hills Fee Schedule, effective 07/01/2026: 'Re-inspection Fee — $100.00 — Prior to Re-inspect — Resolution 09-20-2005A.' |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Checklists & handouts
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cedar Hills building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.