This is PermitBase’s published record for Mapleton as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Mapleton building permits

Verified

Mapleton, Utah — as published 2026-07-07.

Verified 2026-07-08 · Source

Codes adopted

2021 International Building Code (IBC) — current statewide edition per Utah Code § 15A-2-103, effective July 1, 2023; 2024 IBC takes effect statewide July 1, 2026.2021 International Residential Code (IRC) — current statewide edition; unchanged in the July 1, 2026 statewide update per the Utah Uniform Building Standard Act.2021 International Plumbing Code (IPC) — current statewide edition, effective July 1, 2023; 2024 IPC takes effect statewide July 1, 2026.2021 International Mechanical Code (IMC) — current statewide edition, effective July 1, 2023; 2024 IMC takes effect statewide July 1, 2026.2021 International Energy Conservation Code (IECC) with Utah amendments — current statewide edition, effective July 1, 2023; 2024 IECC takes effect statewide July 1, 2026. Mapleton's official Building Inspection Summary page confirms the Insulation inspection is checked against 'current IECC.'2023 National Electrical Code (NEC) — current statewide edition per the Utah Uniform Building Standard Act.Utah House Bill 64 (2024) drywall-inspection change — per Mapleton's official Building Inspection Summary page: 'Effective March 1, 2024 only fire restrictive drywall inspections will be required per HB64.'

Permit types & fees

Residential Building Permit

Verified

Required for new single-family residential construction and any work regulated by the adopted 2021 IRC/IBC in Mapleton. Applications are submitted through the City's online MyGovernmentOnline (mgoconnect.org) portal. Mapleton's fee is calculated from the adopted IBC valuation table using a 0.005 multiplier, per the Community Development Fee Schedule.

Verified 2026-07-08 · Source

Requirements

  • New single-family residential construction
  • Any work regulated by the adopted 2021 IRC (Mapleton City Code Ch. 15.04)
  • Structural modifications regulated by the adopted 2021 IBC/IRC
  • Application submitted through the mygovernmentonline.org / mgoconnect.org online portal per Mapleton's official Building page
  • Restroom facility (site toilet) must be on site at time of Setback/Footing inspection, per the Building Inspection Summary

Required documents

  • RequiredBuilding Permit Application (MyGovernmentOnline / mgoconnect.org)Submitted online — applicant must log in to an existing account or select 'New Account' to apply, per Mapleton's official Building page (mgoconnect.org/cp?JID=203&PID=3).
  • OptionalUtah State Owner/Builder Agreement FormRequired when the property owner acts as their own contractor, per the Utah Division of Professional Licensing (DOPL) form linked from Mapleton's Planning & Forms page.

Fee schedule

Fee typeAmountNotes
Building Permit Major (valuation-based)Based on IBC valuation table, multiplied by a 0.005 factorMapleton City Community Development Fee Schedule, 'Building' section: 'Building Permit Major — Based on IBC & .005 multiplier.' Retrieved from mapleton.org/Fee%20Schedule.pdf (DocumentCenter timestamp 202409191052590). Exact per-square-foot valuation figures are set by the adopted ICC/IBC Building Valuation Data table referenced in the same fee schedule; contact the Community Development Department at (801) 489-6138 to confirm the current valuation table snapshot used for a specific application.
Special Inspection / Re-inspection Fee$55Mapleton City Community Development Fee Schedule, 'Building' section: 'Special Inspection — $55.' Confirmed also on the official Building Inspection Summary page: 'Failure to be ready at the time the inspection is scheduled will result in a re-inspection fee of $55.'

Basement Finish Permit

Verified

Required for basement finish work in Mapleton unless the work is limited to items exempt from building-permit requirements (e.g., painting, carpeting, cabinets). Mapleton's fee schedule lists a distinct flat fee for basement finishes, separate from the valuation-based Building Permit Major fee.

Verified 2026-07-08 · Source

Requirements

  • Finishing of a previously unfinished basement in an existing home
  • Application must identify the proposed use of all finished space, show all electrical outlets, and account for proper window egress in bedrooms, per Mapleton's official FAQ
  • Not required if work is limited to exempt finish items only (painting, papering, tiling, carpeting, cabinets, countertops)

Required documents

  • RequiredBuilding Permit Application (MyGovernmentOnline / mgoconnect.org)Submitted online at mgoconnect.org, per Mapleton's official Building page.

Fee schedule

Fee typeAmountNotes
Basement Finish Fee$300Mapleton City Community Development Fee Schedule, 'Building' section: 'Basement Finish — $300.'
Special Inspection / Re-inspection Fee$55Mapleton City Community Development Fee Schedule, 'Building' section: 'Special Inspection — $55.'

Solar / Wind Permit

Verified

Required for residential solar photovoltaic and wind-energy installations in Mapleton. Mapleton's fee schedule lists a flat fee distinct from the valuation-based Building Permit Major fee.

Verified 2026-07-08 · Source

Requirements

  • Roof-mounted or ground-mounted solar photovoltaic system installation
  • Residential wind-energy system installation
  • Application submitted through the mgoconnect.org online portal

Required documents

  • RequiredBuilding Permit Application (MyGovernmentOnline / mgoconnect.org)Submitted online at mgoconnect.org, per Mapleton's official Building page.

Fee schedule

Fee typeAmountNotes
Solar/Wind Permit Fee$165Mapleton City Community Development Fee Schedule, 'Building' section: 'Solar/Wind Permits — $165.'

Sign Permit

Verified

Required for installation of signage in Mapleton. Flat fee per the Community Development Fee Schedule; a separate Sign Permit Application form is published on the Planning & Forms page.

Verified 2026-07-08 · Source

Requirements

  • Installation of a new sign or replacement of an existing sign requiring a permit under Mapleton City Code
  • Application submitted via the published Sign Permit Application form

Required documents

  • RequiredSign Permit ApplicationOfficial form published on Mapleton's Planning & Forms page (mapletonut.rja.revize.com/forms/1628).

Fee schedule

Fee typeAmountNotes
Sign Permit Fee$75Mapleton City Community Development Fee Schedule, 'Building' section: 'Sign Permit — $75.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mapleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →