Skip to main content
PermitBase

Mapleton building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Mapleton, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
125 West 400 North, Mapleton, UT 84664
Phone
(801) 489-6138
Office hours
Mon–Thu 8:00 AM – 5:30 PM, Fri 8:30 AM – 5:00 PM

Inspection guide

See how inspections work in Mapleton — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.
  • 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update.
  • 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.
  • 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.
  • 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; not separately itemized on Mapleton's own Building/Fee Schedule pages, but applies statewide as part of the State Construction Code.
  • 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.
  • 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026. Mapleton's official Building Inspection Summary page confirms the Insulation inspection is checked against 'current IECC.'
  • 2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.
  • Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Mapleton's own pages.
  • Utah House Bill 64 (2024) drywall-inspection change — per Mapleton's official Building Inspection Summary page: 'Effective March 1, 2024 only fire restrictive drywall inspections will be required per HB64.'

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
35units

17 buildings · $8.7M valuation

Trailing 12 months
477units

12 of 12 months reported · #21 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
165units

84 buildings · $42.6M valuation

5 month(s) reported to Census

Full year 2025
532units

247 buildings · $120.7M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Mapleton's Building Division is open Mon–Thu 8:00 AM–5:30 PM and Fri 8:30 AM–5:00 PM — no midweek closure, but earlier Friday close than some Utah County neighbors.
  • All building permit applications and inspection scheduling go through the MyGovernmentOnline (mgoconnect.org) portal — applicants must create an account before applying.
  • Mapleton's 'Building Permit Major' fee uses an IBC-valuation-table x 0.005 multiplier methodology, distinct from Murray's tiered valuation table and Provo's 1997 UBC chart — confirm the exact current per-square-foot valuation snapshot with the Community Development Department (801-489-6138) before estimating a specific project's fee.
  • A $55 Special Inspection / re-inspection fee applies if the site is not ready at a scheduled inspection time; further inspections are held until the fee is paid at the City Office (cash, card, or check).
  • Effective March 1, 2024, only fire-restrictive drywall inspections are required under Utah HB64 — this is a statewide change reflected on Mapleton's own Building Inspection Summary page.
  • No jurisdiction-published plan-review turnaround time (in business/calendar days) was located for any Mapleton permit type in official city sources as of 2026-07-08. For the Residential Building Permit and Basement Finish Permit (both covering one- and two-family dwelling work), the statutory floor in Utah Code § 10-20-909 (14 business days after a 3-business-day completeness screening) is applied. For accessory-scope permits (Solar/Wind, Sign) where that statute does not apply and no local SLA exists, reviewTimelineDays is honestly null with a note rather than estimated.
  • Mapleton's Fee Schedule PDF also lists Sewer Connection ($250) and tiered Water Connection fees ($600–$2,280.67 by pipe size) that apply alongside a residential building permit for new construction — not modeled as separate permit types here but relevant to total project cost.

Comparable nearby cities

Lehi
Both in Utah County9 shared permit types~26 mi away
Compare fees →
Spanish Fork
Both in Utah County8 shared permit types~4 mi away
Compare fees →
Provo
Both in Utah County8 shared permit types~10 mi away
Compare fees →