Sign Permit in Mapleton, Utah

Required for installation of signage in Mapleton. Flat fee per the Community Development Fee Schedule; a separate Sign Permit Application form is published on the Planning & Forms page.

Verified 2026-07-08 · Source

When you need this permit

  • Installation of a new sign or replacement of an existing sign requiring a permit under Mapleton City Code
  • Application submitted via the published Sign Permit Application form

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit FeeMapleton City Community Development Fee Schedule, 'Building' section: 'Sign Permit — $75.'
$75

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Mapleton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Final inspection of the installed sign, per Mapleton's general Building Inspection Summary final-inspection requirement.

See the full Mapleton inspection guide — scheduling & re-inspection fees →

Tips

  • Use the published Sign Permit Application form on Mapleton's Planning & Forms page rather than the general building permit portal.

Frequently asked questions

Mapleton requires a sign permit for: Installation of a new sign or replacement of an existing sign requiring a permit under Mapleton City Code; Application submitted via the published Sign Permit Application form. If your project isn't listed, confirm with Mapleton City Community Development Department (Building Division) at (801) 489-6138 before starting work.

Per Mapleton's Community Development Fee Schedule, the Sign Permit fee is a flat $75.

Mapleton does not publish a plan-review timeline for this permit. Contact Mapleton City Community Development Department (Building Division) at (801) 489-6138 for current turnaround.

You'll need: Sign Permit Application. See the required-documents checklist on this page for details on each.

Mapleton requires 1 inspection(s) for a sign permit, in order: Final. Schedule each through Mapleton City Community Development Department (Building Division) ((801) 489-6138).

Apply through Mapleton City Community Development Department (Building Division) at 125 West 400 North, Mapleton, UT 84664. Phone: (801) 489-6138, email: permits@mapleton.org. Office hours: Mon–Thu 8:00 AM – 5:30 PM, Fri 8:30 AM – 5:00 PM. Official information: https://www.mapleton.org/departments/community_development/building/index.php.

Mapleton, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.; 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update.; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.; 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; not separately itemized on Mapleton's own Building/Fee Schedule pages, but applies statewide as part of the State Construction Code.; 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.; 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026. Mapleton's official Building Inspection Summary page confirms the Insulation inspection is checked against 'current IECC.'; 2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.; Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Mapleton's own pages.; Utah House Bill 64 (2024) drywall-inspection change — per Mapleton's official Building Inspection Summary page: 'Effective March 1, 2024 only fire restrictive drywall inspections will be required per HB64.'. Local amendments apply — see the Mapleton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mapleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.