No tenant-improvement-specific fee, checklist, or document list is published anywhere in Mapleton's official sources checked (Building page, Building Inspection Summary page, Community Development Fee Schedule PDF, Frequently Asked Questions PDF). Mapleton's fee schedule does not distinguish tenant improvement/finish work from new construction, so this entry applies the same generic 'Building Permit Major' fee mechanism (IBC valuation table x 0.005 multiplier) that governs any major building permit in Mapleton. Confidence is marked partial for the same reason as the commercial-building-permit entry — no commercial-specific figures are published.

Reviewed 2026-07-19 · Source

When you need this permit

  • Interior tenant-improvement or finish work within an existing commercial building, regulated by the adopted 2024 IBC (Mapleton City Code Ch. 15.04)
  • Application submitted through the MyGovernmentOnline (mgoconnect.org) online portal, the same portal used for residential and new commercial permits

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit MajorMapleton City Community Development Fee Schedule (mapleton.org/Fee%20Schedule.pdf, 'Building' section): 'Building Permit Major — Based on IBC & .005 multiplier.' No separate tenant-improvement line item is published — this is the only major building-permit fee line on the schedule, and it is applied here as the closest verified citation rather than a fabricated flat TI fee.
Based on IBC & .005 multiplier
Special Inspection / Re-inspectionMapleton City Community Development Fee Schedule, 'Building' section: 'Special Inspection — $55.'
$55.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Mapleton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Electrical, plumbing, and mechanical rough-in as applicable to the tenant space, before walls are closed.

  2. 2

    Final

    All finish work complete before occupancy.

See the full Mapleton inspection guide — scheduling & re-inspection fees →

Tips

  • Mapleton does not publish a dedicated tenant-improvement fee, checklist, or timeline — confirm project-specific requirements directly with Community Development (801-489-6138) before submitting.
  • Applications for tenant improvement work go through the same MyGovernmentOnline (mgoconnect.org) portal as new construction and residential permits.

Frequently asked questions

Mapleton requires a commercial tenant improvement / tenant finish permit for: Interior tenant-improvement or finish work within an existing commercial building, regulated by the adopted 2024 IBC (Mapleton City Code Ch. 15.04); Application submitted through the MyGovernmentOnline (mgoconnect.org) online portal, the same portal used for residential and new commercial permits. If your project isn't listed, confirm with Mapleton City Community Development Department (Building Division) at (801) 489-6138 before starting work.

No dedicated tenant-improvement fee is published in Mapleton's Community Development Fee Schedule. The same 'Building Permit Major' fee (based on the adopted IBC valuation table with a 0.005 multiplier) applies, since the fee schedule does not distinguish tenant finish from new construction.

Mapleton does not publish a plan-review timeline for this permit. Contact Mapleton City Community Development Department (Building Division) at (801) 489-6138 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Mapleton requires 2 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Rough-In, Final. Schedule each through Mapleton City Community Development Department (Building Division) ((801) 489-6138).

Apply through the MyGovernmentOnline (mgoconnect.org) online portal, the same portal used for residential and new commercial building permits. Contact Mapleton Community Development at (801) 489-6138 with questions, since no dedicated tenant-improvement checklist is published.

Mapleton, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.; 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update.; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.; 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; not separately itemized on Mapleton's own Building/Fee Schedule pages, but applies statewide as part of the State Construction Code.; 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.; 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026. Mapleton's official Building Inspection Summary page confirms the Insulation inspection is checked against 'current IECC.'; 2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.; Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Mapleton's own pages.; Utah House Bill 64 (2024) drywall-inspection change — per Mapleton's official Building Inspection Summary page: 'Effective March 1, 2024 only fire restrictive drywall inspections will be required per HB64.'. Local amendments apply — see the Mapleton overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mapleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Mapleton.