Commercial Building Permit in Mapleton, Utah

Required for new commercial construction in Mapleton, regulated by the adopted 2024 IBC. The 'Building Permit Major' fee is calculated from the IBC valuation table x 0.005 multiplier. Two commercial-specific requirements apply beyond the permit itself: (1) a separate 'Commercial Impact Fees' schedule paid at time of building permit per ERU, and (2) a Project Plan / Site Plan application (Mapleton City Code § 18.90.070(D)) required for all new commercial structures, additions, and alterations. No plan-review turnaround time is published for commercial work — an expected gap, since Utah Code § 10-20-909's 14/21-business-day statutory floor applies only to residential structures (subsections (4)(a)-(4)(b)), leaving no statewide floor for commercial permits — and no Mapleton-published commercial SLA appears on the Building page, in the Building Inspection Summary, the Fee Schedule PDF, the FAQ PDF, the Commercial Design Standards / Ch. 18.90 PDF (which contains no day-count language), or Mapleton City Code §§ 15.04.010 and 18.12.050 (published at codelibrary.amlegal.com).

Verified 2026-08-02 · Source

When you need this permit

  • New commercial construction or major structural work regulated by the adopted 2024 IBC (Mapleton City Code Ch. 15.04)
  • Application submitted through the MyGovernmentOnline (mgoconnect.org) online portal, the same portal used for residential permits
  • Construction valuation for fee assessment under the IBC valuation table x 0.005 multiplier
  • Project Plan / Site Plan application required for all new commercial structures, additions, and alterations, per Mapleton City Code § 18.90.070(D) (Commercial Design Standards, Chapter 7 'Review Process'). Projects that increase an existing structure's floor area by 35% or more and/or height by 15% or more require Planning Commission review and approval; all other project plans are approved by the Community Development Department only. The application must include a site plan (buildings, parking, driveways, ingress/egress), building elevations, a conceptual landscaping plan, and a conceptual signage plan.
  • Contractor must be city-approved prior to permit issuance: current Utah state contractor's license, proof of comprehensive general liability insurance, and proof of workers' compensation insurance, per Mapleton City Code § 18.12.050(D) Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Major
Mapleton City Community Development Fee Schedule (mapleton.org/Fee%20Schedule.pdf, 'Building' section): 'Building Permit Major — Based on IBC & .005 multiplier.' No separate residential or commercial… Show full citationMapleton City Community Development Fee Schedule (mapleton.org/Fee%20Schedule.pdf, 'Building' section): 'Building Permit Major — Based on IBC & .005 multiplier.' No separate residential or commercial line item is published — this is the only 'major' building-permit fee line on the schedule.
Based on IBC & .005 multiplier
Project Plan / Site Plan Application FeeCommunity Development Fee Schedule, 'Project Plan/Site Plan — $100.' Required alongside the building permit for new commercial structures, additions, and alterations per Mapleton City Code § 18.90.070(D).
$100
Commercial Impact Fees (Public Safety, Culinary Water, Pressurized Irrigation, Sanitary Sewer)
Mapleton publishes a separate 'Commercial Impact Fees' schedule, paid at time of building permit per Equivalent Residential Unit (ERU): mapleton.org/Commercial%20Impact%20Fees%201-9-24.pdf (filename… Show full citationMapleton publishes a separate 'Commercial Impact Fees' schedule, paid at time of building permit per Equivalent Residential Unit (ERU): mapleton.org/Commercial%20Impact%20Fees%201-9-24.pdf (filename date suggests effective 1-9-24 / Jan. 9, 2024). Public Safety impact fee, per 1,000 sq ft, by use type: Commercial $302.50, Office $112.93, Industrial $79.82, Assisted Living $788.52. Pressurized Irrigation: $6,100 per connection. Culinary Water (by meter size): $1,417 (1" or less), $4,718 (1.5"), $7,552 (2"), $14,170 (3"), $23,621 (4"). Sanitary Sewer: the source PDF displays the figure as '$3,156391 per ERU' (see table 4-6 of the Culinary Water IFA) — quoted verbatim; the decimal placement in the source document is ambiguous and possibly a source-side typo, and is not corrected or guessed here. The schedule's columns do not line up in a copy-paste, so read the figures from the page as published. Confirm the applicable use-type classification and current figures with Community Development, (801) 489-6138, for a specific project.
Varies by component and building use/meter size — see notes
Special Inspection / Re-inspectionMapleton City Community Development Fee Schedule, 'Building' section: 'Special Inspection — $55.' Applies if the site is not ready at a scheduled inspection time.
$55.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Mapleton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Setback / Footing

    Before concrete pour, per Mapleton's Building Inspection Summary general inspection sequence.

  2. 2

    Framing

    After framing complete, before insulation or drywall.

  3. 3

    Final

    All work complete before occupancy.

See the full Mapleton inspection guide — scheduling & re-inspection fees →

Tips

  • Mapleton does not publish a separate commercial valuation table or plan-review timeline — confirm project-specific requirements directly with Community Development (801-489-6138) before submitting.
  • The 'Building Permit Major' fee (IBC valuation table x 0.005 multiplier) is the only major building-permit fee line published, and is used here as the closest available citation for commercial construction — but it is not the only fee: budget separately for the $100 Project Plan/Site Plan application and the Commercial Impact Fees (per ERU) documented above.
  • No third-party/outsourced commercial plan review arrangement (e.g., SAFEbuilt or similar contract firm) for Mapleton was found via a direct web search — Mapleton's own Community Development Building Division appears to self-perform commercial plan review, based on all available public information.
  • No distinct fire sprinkler or fire alarm permit/fee was found published for Mapleton: the Community Development Fee Schedule contains zero 'sprinkler,' 'fire alarm,' or 'fire suppression' line items, and the Mapleton City Fire Department's own site (mapleton.org/departments/fire_department) publishes only a Business Fire Inspection scheduling link (new business or business-license-renewal inspections, contact Randy Crowther, 801-400-9826) with no fee schedule attached. Fire suppression/alarm work for commercial construction is understood to route through this Building Permit fee and the Fire Department's inspection process rather than a separately-priced permit; confirm current requirements directly with the Fire Department before budgeting.

Frequently asked questions

Mapleton requires a commercial building permit for: New commercial construction or major structural work regulated by the adopted 2024 IBC (Mapleton City Code Ch. 15.04); Application submitted through the MyGovernmentOnline (mgoconnect.org) online portal, the same portal used for residential permits; Construction valuation for fee assessment under the IBC valuation table x 0.005 multiplier; Project Plan / Site Plan application required for all new commercial structures, additions, and alterations, per Mapleton City Code § 18.90.070(D) (Commercial Design Standards, Chapter 7 'Review Process'). Projects that increase an existing structure's floor area by 35% or more and/or height by 15% or more require Planning Commission review and approval; all other project plans are approved by the Community Development Department only. The application must include a site plan (buildings, parking, driveways, ingress/egress), building elevations, a conceptual landscaping plan, and a conceptual signage plan.; Contractor must be city-approved prior to permit issuance: current Utah state contractor's license, proof of comprehensive general liability insurance, and proof of workers' compensation insurance, per Mapleton City Code § 18.12.050(D). If your project isn't listed, confirm with Mapleton City Community Development Department (Building Division) at (801) 489-6138 before starting work.

Three components: (1) the 'Building Permit Major' fee based on the adopted IBC valuation table with a 0.005 multiplier; (2) a $100 Project Plan/Site Plan application fee, required for new commercial structures, additions, and alterations per Mapleton City Code § 18.90.070(D); and (3) Commercial Impact Fees (Public Safety, Culinary Water, Pressurized Irrigation, Sanitary Sewer), assessed per ERU at time of building permit per the city's separate Commercial Impact Fees schedule. Contact Community Development at (801) 489-6138 to confirm the current figures for your project.

Mapleton does not publish a plan-review timeline for this permit. Contact Mapleton City Community Development Department (Building Division) at (801) 489-6138 for current turnaround.

You'll need: Building Permit Application; Project Plan / Site Plan Application. See the required-documents checklist on this page for details on each.

Mapleton requires 3 inspection(s) for a commercial building permit, in order: Setback / Footing, Framing, Final. Schedule each through Mapleton City Community Development Department (Building Division) ((801) 489-6138).

Apply through Mapleton City Community Development Department (Building Division) at 125 West 400 North, Mapleton, UT 84664. Phone: (801) 489-6138, email: permits@mapleton.org. Office hours: Mon–Thu 8:00 AM – 5:30 PM, Fri 8:30 AM – 5:00 PM. Official information: https://www.mapleton.org/departments/community_development/building/index.php.

Mapleton, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.; 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update.; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.; 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; not separately itemized on Mapleton's own Building/Fee Schedule pages, but applies statewide as part of the State Construction Code.; 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.; 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026. Mapleton's official Building Inspection Summary page confirms the Insulation inspection is checked against 'current IECC.'; 2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.; Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Mapleton's own pages.; Utah House Bill 64 (2024) drywall-inspection change — per Mapleton's official Building Inspection Summary page: 'Effective March 1, 2024 only fire restrictive drywall inspections will be required per HB64.'; 2024 International Fire Code (IFC), excluding appendices, as amended by the Utah Statewide Amendments and Additions (Utah Code Sec. 15A-5-103(1)) — adopted locally at Mapleton City Code Sec. 15.04.010(B), which adopts 'all fire codes and amendments as identified in Utah Code Sec. 15A-5-103'. Sec. 15A-5-103 was amended by Chapter 34, 2026 General Session. The local adoption is in Mapleton City Code Title 15, Chapters 15.04 and 15.06 (codelibrary.amlegal.com); the state provision is Utah Code Sec. 15A-5-103 (le.utah.gov).; NFPA 1, Chapter 38 (Marijuana Growing, Processing, and Extraction Facilities), 2024 edition — incorporated into the State Fire Code at Utah Code Sec. 15A-5-103(2), and therefore adopted in Mapleton via Sec. 15.04.010(B). See Mapleton City Code Title 15, Chapters 15.04 and 15.06 (codelibrary.amlegal.com) and Utah Code Sec. 15A-5-103 (le.utah.gov).; NFPA 54, National Fuel Gas Code, 2024 edition — incorporated into the State Fire Code at Utah Code Sec. 15A-5-103(3), and therefore adopted in Mapleton via Sec. 15.04.010(B). Sources: Mapleton City Code Title 15, Chapters 15.04 and 15.06 (codelibrary.amlegal.com); Utah Code Sec. 15A-5-103 (le.utah.gov).; NFPA 58, Liquefied Petroleum Gas Code, 2024 edition — incorporated into the State Fire Code at Utah Code Sec. 15A-5-103(4), and therefore adopted in Mapleton via Sec. 15.04.010(B). See Mapleton City Code Title 15, Chapters 15.04 and 15.06, and Utah Code Sec. 15A-5-103.; Mapleton City Code Chapter 15.04 (codelibrary.amlegal.com/codes/mapletonut) is titled 'BUILDING AND FIRE CODES' — not simply 'Building Code', as an earlier reference had it — and its subsection (B) adopts the State Fire Code, the basis for the four fire codes listed above. On the building-code side, the chapter confirms the editions established via Utah Code Sec. 15A-2-103, so no building edition changed.. Local amendments apply — see the Mapleton overview page for the full list.

Not a single consolidated checklist, but a fresh exhaustive re-check on 2026-08-02 (Building page, Building Inspection Summary page, Fee Schedule PDF, Frequently Asked Questions PDF, Planning & Forms page, and the full Commercial Design Standards PDF codifying Mapleton City Code Ch. 18.90) found that new commercial construction requires both the standard Building Permit Application (mgoconnect.org) and a separate Project Plan/Site Plan Application (Ch. 18.90.070(D)), the latter requiring a site plan, building elevations, a conceptual landscaping plan, and a conceptual signage plan.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Mapleton.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.

Property Access

Mapleton's permit history is searchable by address

5,890 permits on record for Mapleton, 2009–2020 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free