Skip to main content
PermitBase

Solar / Wind Permit in Mapleton, Utah

Required for residential solar photovoltaic and wind-energy installations in Mapleton. Mapleton's fee schedule lists a flat fee distinct from the valuation-based Building Permit Major fee.

Verified 2026-07-19 · Source

When you need this permit

  • Roof-mounted or ground-mounted solar photovoltaic system installation
  • Residential wind-energy system installation
  • Application submitted through the mgoconnect.org online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Solar/Wind Permit FeeMapleton City Community Development Fee Schedule, 'Building' section: 'Solar/Wind Permits — $165.'
$165

Review timeline

Plan review
Not published — contact the department

How long did your Solar / Wind Permit permit actually take in Mapleton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Final inspection of the completed solar or wind installation prior to utility interconnection/use, per Mapleton's general Building Inspection Summary final-inspection requirement.

See the full Mapleton inspection guide — scheduling & re-inspection fees →

Tips

  • Confirm interconnection requirements with the applicable electric utility serving the property in addition to the city building permit.

Frequently asked questions

Mapleton requires a solar / wind permit for: Roof-mounted or ground-mounted solar photovoltaic system installation; Residential wind-energy system installation; Application submitted through the mgoconnect.org online portal. If your project isn't listed, confirm with Mapleton City Community Development Department (Building Division) at (801) 489-6138 before starting work.

Per Mapleton's Community Development Fee Schedule, the Solar/Wind Permit fee is a flat $165.

Mapleton does not publish a plan-review timeline for this permit. Contact Mapleton City Community Development Department (Building Division) at (801) 489-6138 for current turnaround.

You'll need: Building Permit Application (MyGovernmentOnline / mgoconnect.org). See the required-documents checklist on this page for details on each.

Mapleton requires 1 inspection(s) for a solar / wind permit, in order: Final. Schedule each through Mapleton City Community Development Department (Building Division) ((801) 489-6138).

Apply through Mapleton City Community Development Department (Building Division) at 125 West 400 North, Mapleton, UT 84664. Phone: (801) 489-6138, email: permits@mapleton.org. Office hours: Mon–Thu 8:00 AM – 5:30 PM, Fri 8:30 AM – 5:00 PM. Official information: https://www.mapleton.org/departments/community_development/building/index.php.

Mapleton, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026.; 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update.; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.; 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; not separately itemized on Mapleton's own Building/Fee Schedule pages, but applies statewide as part of the State Construction Code.; 2023 National Electrical Code (NEC) — current statewide edition per Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 statewide update.; 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026. Mapleton's official Building Inspection Summary page confirms the Insulation inspection is checked against 'current IECC.'; 2024 International Existing Building Code (IEBC) — current statewide edition per Utah Code § 15A-2-103(1)(i), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide edition per Utah Code § 15A-2-103(1)(n), effective July 1, 2026; not separately itemized on Mapleton's own pages, but applies statewide.; Modular Building Institute Standards 1200 and 1205 — adopted statewide per Utah Code § 15A-2-103(1)(o); not separately itemized on Mapleton's own pages.; Utah House Bill 64 (2024) drywall-inspection change — per Mapleton's official Building Inspection Summary page: 'Effective March 1, 2024 only fire restrictive drywall inspections will be required per HB64.'; 2024 International Fire Code (IFC), excluding appendices, as amended by the Utah Statewide Amendments and Additions (Utah Code Sec. 15A-5-103(1)) — adopted locally at Mapleton City Code Sec. 15.04.010(B), which adopts 'all fire codes and amendments as identified in Utah Code Sec. 15A-5-103'. Sec. 15A-5-103 was amended by Chapter 34, 2026 General Session. The local adoption is in Mapleton City Code Title 15, Chapters 15.04 and 15.06 (codelibrary.amlegal.com); the state provision is Utah Code Sec. 15A-5-103 (le.utah.gov).; NFPA 1, Chapter 38 (Marijuana Growing, Processing, and Extraction Facilities), 2024 edition — incorporated into the State Fire Code at Utah Code Sec. 15A-5-103(2), and therefore adopted in Mapleton via Sec. 15.04.010(B). See Mapleton City Code Title 15, Chapters 15.04 and 15.06 (codelibrary.amlegal.com) and Utah Code Sec. 15A-5-103 (le.utah.gov).; NFPA 54, National Fuel Gas Code, 2024 edition — incorporated into the State Fire Code at Utah Code Sec. 15A-5-103(3), and therefore adopted in Mapleton via Sec. 15.04.010(B). Sources: Mapleton City Code Title 15, Chapters 15.04 and 15.06 (codelibrary.amlegal.com); Utah Code Sec. 15A-5-103 (le.utah.gov).; NFPA 58, Liquefied Petroleum Gas Code, 2024 edition — incorporated into the State Fire Code at Utah Code Sec. 15A-5-103(4), and therefore adopted in Mapleton via Sec. 15.04.010(B). See Mapleton City Code Title 15, Chapters 15.04 and 15.06, and Utah Code Sec. 15A-5-103.; Mapleton City Code Chapter 15.04 (codelibrary.amlegal.com/codes/mapletonut) is titled 'BUILDING AND FIRE CODES' — not simply 'Building Code', as an earlier reference had it — and its subsection (B) adopts the State Fire Code, the basis for the four fire codes listed above. On the building-code side, the chapter confirms the editions established via Utah Code Sec. 15A-2-103, so no building edition changed.. Local amendments apply — see the Mapleton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mapleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Property Access

Mapleton's permit history is searchable by address

5,890 permits on record for Mapleton, 2009–2020 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free