Residential Building Permit in Mapleton, Utah
Required for new single-family residential construction and any work regulated by the adopted 2021 IRC / 2024 IBC in Mapleton. Applications are submitted through the City's online MyGovernmentOnline (mgoconnect.org) portal. Mapleton's fee is calculated from the adopted IBC valuation table using a 0.005 multiplier, per the Community Development Fee Schedule.
Verified 2026-07-08 · Source
When you need this permit
- New single-family residential construction
- Any work regulated by the adopted 2021 IRC (Mapleton City Code Ch. 15.04)
- Structural modifications regulated by the adopted 2024 IBC / 2021 IRC
- Application submitted through the mygovernmentonline.org / mgoconnect.org online portal per Mapleton's official Building page
- Restroom facility (site toilet) must be on site at time of Setback/Footing inspection, per the Building Inspection Summary
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Setback, Footings, and Site Toilet
Placement on property based on required setbacks verified; inspection of excavation, forms and reinforcing steel prior to placement of concrete. Concrete-encased electrode (ufer) must be installed. Restroom facility must be on site. Per Mapleton's official Building Inspection Summary page.
- 2
Foundation
Inspection of forms and reinforcing steel prior to placement of concrete.
- 3
Subgrade Foundation Insulation
Inspection of thermal insulation installed below ground level on foundation walls and/or beneath the concrete slab.
- 4
Temporary Power
Inspection of temporary pedestal with grounding rod; all outlets GFCI protected.
- 5
Suspended Concrete
Inspection of forms and reinforcing steel prior to placement of concrete on all precast, cast-in-place floors, and porch caps.
- 6
Under Slab (US) Plumbing, Electrical, and/or Mechanical
Inspection of all underground or under-slab work prior to burial or concrete covering.
- 7
Shear
Inspection of all structural sheathing and foundation straps prior to installation of weather barrier; may be included with the 4-way inspection.
- 8
4-way and Gas-line
Inspection of framing and all roughed-in electrical, mechanical, fuel gas piping, and plumbing installations. All windows and exterior doors must be installed for this inspection.
- 9
Weather Barrier / Stucco-Lath-Flashing
Inspection of exterior weather barrier, window and door flashing, and other flashing prior to installation of siding, masonry, and roofing products. Stucco/Lath/Flashing performed after all flashings, vapor barrier, and lath are installed and all penetrations sealed.
- 10
Permanent Power
Inspection of electrical service panel prior to utility hook-up. Must have ground wire connected to concrete-encased electrode and one GFCI outlet connected inside the house.
- 11
Insulation
Inspection to ensure insulation, doors, windows, heating and cooling equipment meets current IECC.
- 12
Drywall
Effective March 1, 2024, only fire-restrictive drywall inspections are required per Utah HB64.
- 13
Shower Pan
Fill with water to within 1/2 inch of top for a minimum of 15 minutes.
- 14
Final
Inspection of completed structure prior to use or occupancy. All permits must have a final inspection. All items indicated on the plans as to be finished must be in place (kitchen cabinets, sinks, bathroom fixtures, etc.). No personal items other than construction tools/equipment may be placed in the building until occupancy is granted.
See the full Mapleton inspection guide — scheduling & re-inspection fees →
Tips
- All inspections are scheduled through the www.mygovernmentonline.org applicant portal — request inspections up to three days in advance if a specific date/time is preferred, per Mapleton's official Building Inspection Summary page.
- Mapleton's Building Division is open Mon–Thu 8:00 AM–5:30 PM and Fri 8:30 AM–5:00 PM.
- A restroom facility (site toilet) must be present on site at the time of the Setback/Footings inspection.
- Failure to be ready at a scheduled inspection triggers a $55 re-inspection fee, payable at the City Office (cash, card, or check) before further inspections resume.
- Effective March 1, 2024, only fire-restrictive drywall inspections are required under Utah HB64 — general drywall inspections were eliminated statewide.
- Mapleton has no distinct EV charger / EVSE permit type or fee: a full-text check of Mapleton's Community Development Fee Schedule (mapleton.org/Fee%20Schedule.pdf, PDF fetched and searched directly 2026-07-20) found zero mentions of 'EV,' 'electric vehicle,' 'charging station,' or 'EVSE,' and no standalone electrical-trade permit line item — the schedule lists only a general 'Building Permit Major' (valuation-based, IBC + .005 multiplier) line for building-related work. A residential EV charger install is expected to route through this same Building Permit fee as standard electrical work; confirm directly with the Building Division before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mapleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Mapleton
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Mapleton project checklist
Describe your project once and get every permit, document, and fee it triggers in Mapleton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →