This is PermitBase’s published record for Payson as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Payson building permits

Verified

Payson, Utah — as published 2026-07-19.

Verified 2026-07-03 · Source

Codes adopted

Payson City Code (PCC) Title 10, Chapter 10.04 ('Technical Construction Codes Adoption', PCC 10.04.040) adopts 'the technical construction codes' by reference for building, plumbing, electrical, and mechanical construction, without restating specific IBC/IRC/IMC/IPC/IECC/NEC edition years in the ordinance text itself — per the recodified Payson City Municipal Code (s3-us-west-2.amazonaws.com/municipalcodeonline.com-new/payson/ordinances/documents/1653339554_05-18-2022-D%20Recodified%20Municipal%20Code.pdf, Title 10.04, fetched 2026-07-03). This is consistent with Utah's Title 15A State Construction and Fire Codes Act model, under which every incorporated Utah city is automatically a compliance agency enforcing the state-adopted code suite; Payson's own ordinance text references 'the State Construction Code' and 'technical construction codes' generically rather than citing specific edition years.International Fire Code (IFC), 2009 edition, is explicitly named with its year in Payson's own code: PCC 9.04.010 'Adoption Of International Fire Code' states the adopted code is 'marked and designated as the International Fire Code, including Appendix Chapters B, C, D, II, I & J (see International Fire Code 101.2.1, 2009 edition)' — per the same recodified Municipal Code document, Title 9.04, fetched 2026-07-03. NOTE: this 2009 IFC citation is the only explicit code-edition year found anywhere in Payson's own currently-published municipal code text; it substantially predates the 2021 IBC/IRC/2023 NEC statewide baseline described in Utah Code Title 15A and may reflect a stale, un-updated ordinance section rather than the code editions actually enforced today. Reported as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.International Residential Code (IRC) — referenced generically ('in accordance with the requirements of the International Residential Code, as adopted') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.International Building Code (IBC) — referenced generically ('the International Building Code as adopted by the State of Utah') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.International Plumbing Code (IPC) — referenced generically ('The International Plumbing Code as adopted and amended by the State of Utah') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.National Electrical Code (NEC) — referenced generically ('National Electrical Code, and all fittings and materials used in such installations') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.

Permit types & fees

Residential Building Permit (New Single Family / Additions)

Verified

Required for new residential construction and additions in Payson, regulated by the state-adopted building code suite referenced generically in PCC Title 10. Fees are valuation-based using ICC building valuation data with a 0.75 regional multiplier.

Verified 2026-07-03 · Source

Requirements

  • Subdivision plat recorded and all lot/subdivision improvements completed, inspected, and approved prior to application submission
  • Building Permit Application with contractor's signature and copy of current license (if not an owner/builder)
  • Power to Panel Application with contractor's signature and copy of current license (if not an owner/builder)
  • Owner/Builder Certification (required only if the property owner is acting as the contractor)
  • Stucco ICBO Report, Stucco Certificate, and Stucco Contractor's license (if stucco is used)
  • $300 Plan Review Deposit
  • Compliance with all zoning requirements for the underlying zone and any recorded development agreement/CC&Rs
  • Complete plan set drawn to scale

Required documents

  • RequiredSite PlanDimensions of lot, house, and setbacks, per Residential Building Permit Minimum Submittal Requirements.
  • RequiredLandscape PlanRequired for all required landscaping areas.
  • RequiredFooting and Foundation PlanRequired per Minimum Submittal Requirements.
  • RequiredFloor PlanIncludes door and window sizes and locations; rooms labeled.
  • RequiredElevationsRequired per Minimum Submittal Requirements.
  • RequiredElectrical PlanRequired per Minimum Submittal Requirements.
  • RequiredPlumbing PlanRequired per Minimum Submittal Requirements.
  • RequiredMechanical PlanRequired per Minimum Submittal Requirements.
  • RequiredGas Pipe Sizing DiagramRequired per Minimum Submittal Requirements.
  • RequiredStructural PlanIncludes shear wall, post and beam sizes, floor joist layout, and truss details. Most structural plans are required to be stamped by an engineer.
  • OptionalOwner/Builder CertificationRequired only if the property owner is acting as the contractor.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)See ICC valuation table with 0.75 regional multiplier
Payson City Fee Schedule (6/30/2025, current), p.3, per paysonutah.gov/DocumentCenter/View/170/Payson-City-Fee-Schedule, fetched 2026-07-04: 'Building permit fees shall be paid prior to any work being started. Show full citation

Payson City Fee Schedule (6/30/2025, current), p.3, per paysonutah.gov/DocumentCenter/View/170/Payson-City-Fee-Schedule, fetched 2026-07-04: 'Building permit fees shall be paid prior to any work being started. The current building valuation data from the International Code Council and a regional multiplier of .75 will be used in determining cost per square foot based on occupancy and building type.' Tiered fee table verbatim: $1-$500 = $24 per $500 + $3.00/each additional $100 or fraction thereof up to $2,000; $501-$2,000 = $69 for the first $2,000 + $11/each additional $1,000 up to $40,000; $2,001-$40,000 = $487 for the first $40,000 + $9 per additional $1,000 up to $100,000; $40,001-$100,000 = $1,027 for the first $100,000 + $7 per additional $1,000 up to $500,000; $100,001-$500,000 = $3,827 for the first $500,000 + $5 per additional $1,000 up to $1,000,000; $500,001-$1,000,000 = $6,327 for the first $1,000,000 + $3 per additional $1,000 up to $5,000,000; $1,000,001-$5,000,000 = $18,327 for the first $5,000,000 + $1 per additional $1,000. In addition, a 1% state surcharge is assessed on all building permit fees.

Plan Review Fee (Residential)$481.00Payson City Fee Schedule (6/30/2025), p.3, Review Fees and Deposits: 'Plan Review Fee Residential — $481.00.'
Repeat Plan Review (Residential)$225.00Payson City Fee Schedule (6/30/2025), p.3: 'Repeat Plan Review Residential — $225.00.'
Residential Plan Review Deposit$300.00Payson City Fee Schedule (6/30/2025), p.3: 'Residential Deposit — $300.00.' Also independently confirmed on the city's own Residential Building Permit Minimum Submittal Requirements document as a required line item: '$300 Plan Review Deposit.'
State Surcharge1% of the building permit feePayson City Fee Schedule (6/30/2025), p.3: 'In addition to the fees set forth, a 1% state surcharge is assessed.' This is the statewide Uniform Building Code Commission fee required of all Utah compliance agencies.
Re-Inspection Fee$120.00 per hourPayson City Fee Schedule (6/30/2025), p.3: 'Re-Inspection Fee (per inspection) — $120.00 per hour.'
Outside Normal Business Hours Inspection$120.00 per hour (minimum charge of 2 hours)Payson City Fee Schedule (6/30/2025), p.3: 'Outside normal business hours (minimum charge of 2 hours) — $120.00 per hour.'
Basement Square Footage Inspection$100.00 per inspectionPayson City Fee Schedule (6/30/2025), p.3: 'Basement Square footage will be included in building permit fee — $100.00 per inspection.'
Other Inspections$120.00 per hourPayson City Fee Schedule (6/30/2025), p.3: 'Other Inspections — $120.00 per hour.'
Working Without a Permit / Stop Work Red Tag$800.00Payson City Fee Schedule (6/30/2025), p.4: 'Working without a permit and stop work red tag — $800.00.'

Commercial Building Permit

Verified

Required for new commercial construction in Payson. Fees are valuation-based using the same ICC valuation table and 0.75 regional multiplier as residential, with a distinct commercial plan review fee structure and deposit tier based on project valuation.

Verified 2026-07-03 · Source

Requirements

  • New commercial construction
  • Compliance with all zoning requirements for the underlying zone
  • Complete plan set drawn to scale, conforming to codes, laws, ordinances, rules, and regulations
  • Commercial Deposit (tiered by valuation)

Required documents

  • RequiredCommercial/Industrial Site PlanRequired per Payson City Fee Schedule, Planning and Zoning — Development Services section (distinct fee for new buildings under/over 2 acres and existing buildings).

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)See ICC valuation table with 0.75 regional multiplierSame tiered valuation-based structure as the residential building permit fee table, per Payson City Fee Schedule (6/30/2025), p.3.
Plan Review Fee (Commercial, up to 3 hours of review)$1,000.00Payson City Fee Schedule (6/30/2025), p.3: 'Plan Review Fee Commercial (up to 3 hours of review) — $1,000.00.'
Repeat Plan Review (Commercial, per additional hour)$225.00Payson City Fee Schedule (6/30/2025), p.3: 'Repeat Plan Review commercial (per each additional hour or fraction thereof) — $225.00.'
Commercial Deposit (Small, valuation < $1,000,000)$500.00Payson City Fee Schedule (6/30/2025), p.3: 'Commercial Deposit — Small (valuation < $1,000,000) — $500.00.'
Commercial Deposit (Large, valuation >= $1,000,000)$1,000.00Payson City Fee Schedule (6/30/2025), p.3: 'Commercial Deposit — Large (valuation >= $1,000,000) — $1,000.00.'
Commercial/Industrial Site Plan Review — New Buildings < 2 acres$650.00Payson City Fee Schedule (6/30/2025), p.2, Planning and Zoning — Development Services: 'New Buildings < 2 acres — $650.00.'
Commercial/Industrial Site Plan Review — New Buildings > 2 acres$650 plus $75 per acrePayson City Fee Schedule (6/30/2025), p.2: 'New Buildings > 2 acres — $650 plus $75 per acre.'
State Surcharge1% of the building permit feePayson City Fee Schedule (6/30/2025), p.3: statewide Uniform Building Code Commission fee applied to all building permit fees.

Demolition Permit

Verified

Required for demolition of structures in Payson. Fees differ for parcels of 1 acre or less versus larger parcels.

Verified 2026-07-03 · Source

Requirements

  • Demolition of a structure or structures
  • Compliance with PCC Title 10, Chapter 10.24 (Demolition)

Required documents

    Fee schedule

    Fee typeAmountNotes
    Demolition (<= 1 acre)$500.00Payson City Fee Schedule (6/30/2025), p.4: 'Demolition <= 1 acre — $500.00.'
    Demolition (> 1 acre) — Base Fee$500.00Payson City Fee Schedule (6/30/2025), p.4: 'Demolition > 1 acre — Base Fee — $500.00.'
    Demolition (> 1 acre) — Each Additional Acre$300.00 (in addition to base fee)Payson City Fee Schedule (6/30/2025), p.4: 'Each Additional acre (in addition to base) — $300.00.'

    Commercial Tenant Improvement / Tenant Finish Permit

    Verified

    Payson does not issue a separate tenant-improvement permit; 'Tenant Finish' is one of the explicit checkbox options under the 'Commercial' Type of Use on the City's own Building Permit Application (Form BP, Revised 9-2023), alongside New Multi Family, Addition, Remodel, Shell, and Miscellaneous. Tenant-improvement/tenant-finish projects use the identical application form, the identical Commercial Plan Check Deposit tiers ($500.00 for valuation < $1,000,000; $1,000.00 for valuation >= $1,000,000 printed directly on the form), and the same valuation-based Building Permit Fee and Commercial Plan Review Fee structure as new commercial construction.

    Verified 2026-07-19 · Source

    Requirements

    • Commercial tenant-finish/interior-buildout work within an existing or shell commercial building
    • 'Tenant Finish' checked under the Commercial Permit Type section of the Building Permit Application (Form BP)
    • Complete plan set drawn to scale, conforming to codes, laws, ordinances, rules, and regulations
    • Commercial Plan Check Deposit paid at submittal: $500.00 if valuation < $1,000,000, or $1,000.00 if valuation >= $1,000,000
    • Compliance with all zoning requirements for the underlying zone

    Required documents

    • RequiredBuilding Permit Application (Form BP, Revised 9-2023)Payson City's single Building Permit Application used for all residential and commercial permit types; includes an explicit 'Tenant Finish' checkbox under the Commercial column, alongside New Multi Family, Addition, Remodel, Shell, and Miscellaneous.

    Fee schedule

    Fee typeAmountNotes
    Building Permit Fee (valuation-based)See ICC valuation table with 0.75 regional multiplier
    Same tiered valuation-based structure as the general Commercial Building Permit and residential fee table, per Payson City Fee Schedule (6/30/2025), p.3. Show full citation

    Same tiered valuation-based structure as the general Commercial Building Permit and residential fee table, per Payson City Fee Schedule (6/30/2025), p.3. Payson's Fee Schedule does not publish a distinct dollar figure for 'Tenant Finish' separate from the general Commercial Building Permit Fee table.

    Plan Review Fee (Commercial, up to 3 hours of review)$1,000.00Payson City Fee Schedule (6/30/2025), p.3: 'Plan Review Fee Commercial (up to 3 hours of review) — $1,000.00.' Applies uniformly to Tenant Finish, Shell, Remodel, and New Commercial permit types since the Fee Schedule does not itemize by Commercial sub-type.
    Repeat Plan Review (Commercial, per additional hour)$225.00Payson City Fee Schedule (6/30/2025), p.3: 'Repeat Plan Review commercial (per each additional hour or fraction thereof) — $225.00.'
    Commercial Deposit (Small, valuation < $1,000,000)$500.00Payson City Fee Schedule (6/30/2025), p.3, and confirmed directly on the Building Permit Application form's own 'Plan Check Deposit' box, which applies this same tier to every Commercial-column permit type including Tenant Finish.
    Commercial Deposit (Large, valuation >= $1,000,000)$1,000.00Payson City Fee Schedule (6/30/2025), p.3, and confirmed directly on the Building Permit Application form's own 'Plan Check Deposit' box.
    State Surcharge1% of the building permit feePayson City Fee Schedule (6/30/2025), p.3: statewide Uniform Building Code Commission fee applied to all building permit fees, including Tenant Finish.

    Solar Distributed Generation (Solar PV) Permit

    Verified

    Required for residential and commercial solar photovoltaic and other distributed-generation (net-metered) electric installations in Payson. This is a genuinely distinct, dedicated program — Payson operates its own municipal electric utility (Payson Power) and requires solar installations to go through the city's own Distributed Generation Program: a dedicated application form co-signed by the contractor, property owner, Power Department, and Building Official, plus a separate interconnection application fee, in addition to the standard valuation-based Building Permit. Payson's own Distributed Generation informational page cites the governing ordinance as 'Payson City Code, Chapter 4, Section 4.24.060, Distributed Generation Program'; the program's own PDF text (paysonutah.gov/DocumentCenter/View/158) is internally numbered as 'Chapter 13.06, Distributed Generation Program' — both citations are reported as published, since the discrepancy could not be independently resolved and is likely a recodification artifact.

    Verified 2026-07-19 · Source

    Requirements

    • Completed Building Permit application, including the property serial number
    • Solar Distributed Generation Program application form, completed with system specifications (type of class: Residential 1-10 kW or Commercial 10-25 kW, installed capacity, module/inverter manufacturer and model, array location, disconnect switch location, battery/generator backup status) and signed by the contractor and property owner
    • Property owner must acknowledge receipt of a copy of the Distributed Generation Program Ordinance, per the application form's signature block
    • Site/Facility Layout Diagram and Facility One-Line Diagram
    • Net Meter Agreement
    • Hard copy of the permit application, plans, specs, net metering documents, plus an electronic submittal on a flash drive or similar
    • Nameplate generating capacity may not exceed 10 kW for Residential or 25 kW for Commercial systems, per Payson City Code § 13.06.010 (Purpose and Scope)
    • Applicant must furnish and install a UL-approved safety disconnect switch, visible-break type, in a metal enclosure securable by padlock, located adjacent to the utility meter and accessible to utility personnel at all times (waivable only if the applicant's equipment performs internal physical disconnection to the utility's satisfaction)
    • Compliance with NEC, NESC, IEEE 1547-2003, UL 1741, and IEEE 929-2000 (Recommended Practice for Utility Interface of Photovoltaic Systems) for inverter-based systems

    Required documents

    • RequiredDistributed Generation Program FormPayson's official Solar Distributed Generation Program application — captures customer, contractor, and full solar system technical information; requires signatures from the contractor/authorized agent, the property owner (acknowledging receipt of the ordinance), the Power Department, and the Building Official.
    • RequiredBuilding Permit ApplicationStandard Payson City Building Permit Application (Form BP), including the property serial number, submitted alongside the Distributed Generation Program Form.
    • RequiredSite / Facility Layout DiagramListed as a required attachment on the Distributed Generation Program Form's City Power Department checklist.
    • RequiredFacility One-Line DiagramListed as a required attachment on the Distributed Generation Program Form's City Power Department checklist.
    • RequiredNet Meter AgreementListed as a required attachment on the Distributed Generation Program Form's City Power Department checklist.

    Fee schedule

    Fee typeAmountNotes
    Building Permit Fee (valuation-based)See ICC valuation table with 0.75 regional multiplier
    Payson does not publish standalone electrical trade-permit fee line items (per this file's tipsAndGotchas); Show full citation

    Payson does not publish standalone electrical trade-permit fee line items (per this file's tipsAndGotchas); solar electrical work is priced within the same general valuation-based Building Permit Fee table used for other permit types, per Payson City Fee Schedule (6/30/2025), p.3.

    Interconnection Application Fee$100.00 (non-refundable), paid together with the net meter cost
    Payson City Code, Distributed Generation Program, § 13.05.040(2) 'Application fees': 'The utility requires a non-refundable interconnection application fee of $100.00, with payment for the net… Show full citation

    Payson City Code, Distributed Generation Program, § 13.05.040(2) 'Application fees': 'The utility requires a non-refundable interconnection application fee of $100.00, with payment for the net meter.' PDF retrieved from paysonutah.gov/DocumentCenter/View/158/Distributed-Generation-Program.

    Electric Connection Fee (per Service) — Solar PVActual Cost
    Payson City Fee Schedule (6/30/2025), p.13, 'Comprehensive Fees for Connection and Power Line Extension': 'Electric Connection Fee (per Service) Solar PV — Actual Cost.' Listed as its own line item… Show full citation

    Payson City Fee Schedule (6/30/2025), p.13, 'Comprehensive Fees for Connection and Power Line Extension': 'Electric Connection Fee (per Service) Solar PV — Actual Cost.' Listed as its own line item distinct from the standard residential/commercial electric service connection fee tiers on the same table.

    Solar Power Net Meter (per service)Actual CostPayson City Fee Schedule (6/30/2025), p.13, same 'Comprehensive Fees for Connection and Power Line Extension' table: 'Solar power net meter (per service) — Actual Cost.'
    State Surcharge1% of the building permit feePayson City Fee Schedule (6/30/2025), p.3 — applies to the Building Permit Fee component of a solar installation the same as any other permit.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-03.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Payson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    ← Earlier version (2026-07-07)Later version (2026-07-20) →View current record →All versions →

    Permalink: /utah/utah-county/payson/as-of/2026-07-19/

    Snapshot date: 2026-07-19

    Commit: 6ed3eaa

    Reproducible from PermitBase’s version-controlled dataset, commit 6ed3eaa.