Skip to main content
PermitBase

Payson building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Payson, Utah.

Last verified 2026-07-03 · Source · Embed this page’s badge · Version history

Building department

Address
439 W. Utah Ave, Payson, UT 84651
Phone
801-465-5200
Email
Office hours
Monday–Thursday, 7:30 AM – 6:00 PM, per paysonutah.gov/334/Building-Permits-Inspections and the Residential Building Permit Minimum Submittal Requirements document (paysonutah.gov/DocumentCenter/View/453/Residential-Building-Permit-Submittal-Requirements), both fetched 2026-07-03. No department email address is published on the Building Permits & Inspections page.

Inspection guide

See how inspections work in Payson — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • Payson City Code (PCC) Title 10, Chapter 10.04 ('Technical Construction Codes Adoption', PCC 10.04.040) adopts 'the technical construction codes' by reference for building, plumbing, electrical, and mechanical construction, without restating specific IBC/IRC/IMC/IPC/IECC/NEC edition years in the ordinance text itself — per the recodified Payson City Municipal Code (s3-us-west-2.amazonaws.com/municipalcodeonline.com-new/payson/ordinances/documents/1653339554_05-18-2022-D%20Recodified%20Municipal%20Code.pdf, Title 10.04, fetched 2026-07-03). This is consistent with Utah's Title 15A State Construction and Fire Codes Act model, under which every incorporated Utah city is automatically a compliance agency enforcing the state-adopted code suite; Payson's own ordinance text references 'the State Construction Code' and 'technical construction codes' generically rather than citing specific edition years.
  • International Fire Code (IFC), 2009 edition, is explicitly named with its year in Payson's own code: PCC 9.04.010 'Adoption Of International Fire Code' states the adopted code is 'marked and designated as the International Fire Code, including Appendix Chapters B, C, D, II, I & J (see International Fire Code 101.2.1, 2009 edition)' — per the same recodified Municipal Code document, Title 9.04, fetched 2026-07-03. NOTE: this 2009 IFC citation is the only explicit code-edition year found anywhere in Payson's own currently-published municipal code text; it substantially predates the 2021 IBC/IRC/2023 NEC statewide baseline described in Utah Code Title 15A and may reflect a stale, un-updated ordinance section rather than the code editions actually enforced today. Reported as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.
  • International Residential Code (IRC) — referenced generically ('in accordance with the requirements of the International Residential Code, as adopted') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.
  • International Building Code (IBC) — referenced generically ('the International Building Code as adopted by the State of Utah') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.
  • International Plumbing Code (IPC) — referenced generically ('The International Plumbing Code as adopted and amended by the State of Utah') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.
  • National Electrical Code (NEC) — referenced generically ('National Electrical Code, and all fittings and materials used in such installations') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
18units

18 buildings · $6.9M valuation

Trailing 12 months
196units

12 of 12 months reported · #32 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
72units

72 buildings · $26.9M valuation

5 month(s) reported to Census

Full year 2025
194units

178 buildings · $80.4M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Payson City Building Department offices are open Monday–Thursday, 7:30 AM – 6:00 PM only, per paysonutah.gov/334/Building-Permits-Inspections and the Minimum Submittal Requirements document.
  • The subdivision plat must be recorded and ALL lot/subdivision improvements completed, inspected, and approved BEFORE a building permit application can even be submitted — call Public Works at 801-465-5217 with subdivision status questions.
  • Payson's own published plan-review timeline is a maximum of 14 business days once a complete application is accepted for review — but incomplete submittals are not accepted for review at all, so an incomplete plan set does not start this clock.
  • A $300 Residential Plan Review Deposit is charged separately from the $481.00 Residential Plan Review Fee itself; commercial deposits are tiered at $500 (valuation < $1,000,000) or $1,000 (valuation >= $1,000,000), separate from the $1,000.00 (first 3 hours) Commercial Plan Review Fee.
  • All building permit submittals must be done through Payson's online iworq portal at PaysonUtah.gov — the Minimum Submittal Requirements document states this explicitly.
  • Payson City's own municipal code (PCC Title 10.04) adopts 'technical construction codes' and 'the State Construction Code' by reference without restating specific IBC/IRC/IMC/IPC/IECC/NEC edition years in the ordinance text; the only explicit code-edition year found anywhere in Payson's own published municipal code is a 2009 International Fire Code citation in PCC 9.04.010 — a stale figure that substantially predates the 2021 IBC/IRC and 2023 NEC statewide baseline under Utah Code Title 15A. Contractors should confirm currently-enforced code editions directly with the Building Department (801-465-5200) rather than relying on the ordinance text's silence on specific years.
  • No standalone electrical, plumbing, or mechanical trade-permit fee line items are published in Payson's Fee Schedule — those scopes are priced within the general valuation-based Building Permit Fee, consistent with how PCC 10.04.050 folds electrical/plumbing/mechanical equipment installation into a single Title 10 framework rather than separate fee schedules.
  • No impact fee schedule (water, sewer, roads, parks, public safety) could be located as a currently-resolving, itemized dollar-figure document on paysonutah.gov as of 2026-07-04 — a linked 2026 fee schedule (DocumentCenter/View/2862) returned an HTML error page rather than a PDF on direct fetch; only the 6/30/2025 fee schedule (DocumentCenter/View/170) was confirmed to resolve and was used as the source for all fee figures in this file. Impact fees are omitted rather than estimated.

Comparable nearby cities

Provo
Both in Utah County10 shared permit types~15 mi away
Compare fees →
Orem
Both in Utah County10 shared permit types~18 mi away
Compare fees →
Santaquin
Both in Utah County9 shared permit types~5 mi away
Compare fees →