Skip to main content
PermitBase

Sign Permit in Payson, Utah

Payson City charges sign permit fees calculated using the same valuation table as its building permit fee schedule, with several flat-fee and no-fee exceptions published in the current Payson City Fee Schedule for A-frame signs, development promotional signs, home occupation signs, sponsorship signage, and other promotional signs (banners, streamers, pennants).

Verified 2026-07-20 · Source

When you need this permit

  • In general, sign permit fees are calculated using the valuation table found in the building permit fee section of the Payson City Fee Schedule
  • A-frame signs require an initial fee and an annual renewal fee
  • Other promotional signs (banners, streamers, pennants, etc.) are not charged a fee, but still require a permit from the Development Services Department

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

General Sign PermitPayson City Fee Schedule, current as of 6/30/2025: 'In general, sign permit fees shall be calculated using the valuation table found in the building permit fee section of this fee schedule, with the following exceptions.'
Valuation-based, per the building permit fee valuation table
A-frame Sign — Initial FeePayson City Fee Schedule, current as of 6/30/2025.
$30.00
A-frame Sign — Annual Renewal FeePayson City Fee Schedule, current as of 6/30/2025.
$15.00
Development Promotional SignsPayson City Fee Schedule, current as of 6/30/2025.
$100.00
Home Occupation SignPayson City Fee Schedule, current as of 6/30/2025.
$10.00
Sponsorship Signage (Uniform 4' X 10' Vinyl Sign)Payson City Fee Schedule, current as of 6/30/2025.
$200.00
Other Promotional Signs (banners, streamers, pennants, etc.)Payson City Fee Schedule, current as of 6/30/2025: 'other promotional signs (banners, streamers, pennants, etc.) are not charged a fee but must obtain a permit from the Development Services Department.'
No fee

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Payson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Payson inspection guide — scheduling & re-inspection fees →

    Tips

    • Even fee-exempt sign types like banners, streamers, and pennants still require a permit from the Development Services Department — a $0 fee does not mean no permit is needed.
    • A-frame signs carry both an initial fee ($30.00) and a separate annual renewal fee ($15.00), unlike most other Payson sign categories which are one-time fees.

    Frequently asked questions

    Payson requires a sign permit for: In general, sign permit fees are calculated using the valuation table found in the building permit fee section of the Payson City Fee Schedule; A-frame signs require an initial fee and an annual renewal fee; Other promotional signs (banners, streamers, pennants, etc.) are not charged a fee, but still require a permit from the Development Services Department. If your project isn't listed, confirm with Payson City Building Department (Development Services) at 801-465-5200 before starting work.

    Most signs are charged using the building-permit valuation table, but Payson publishes flat fees for several categories: A-frame signs ($30.00 initial, $15.00 annual renewal), development promotional signs ($100.00), home occupation signs ($10.00), and sponsorship signage ($200.00). Banners, streamers, and pennants require a permit but carry no fee.

    Payson does not publish a plan-review timeline for this permit. Contact Payson City Building Department (Development Services) at 801-465-5200 for current turnaround.

    You'll need: Sign Permit Application. See the required-documents checklist on this page for details on each.

    Apply through Payson City Building Department (Development Services) at 439 W. Utah Ave, Payson, UT 84651. Phone: 801-465-5200. Office hours: Monday–Thursday, 7:30 AM – 6:00 PM, per paysonutah.gov/334/Building-Permits-Inspections and the Residential Building Permit Minimum Submittal Requirements document (paysonutah.gov/DocumentCenter/View/453/Residential-Building-Permit-Submittal-Requirements), both fetched 2026-07-03. No department email address is published on the Building Permits & Inspections page.. Official information: https://www.paysonutah.gov/334/Building-Permits-Inspections.

    Payson, Utah has adopted: Payson City Code (PCC) Title 10, Chapter 10.04 ('Technical Construction Codes Adoption', PCC 10.04.040) adopts 'the technical construction codes' by reference for building, plumbing, electrical, and mechanical construction, without restating specific IBC/IRC/IMC/IPC/IECC/NEC edition years in the ordinance text itself — per the recodified Payson City Municipal Code (s3-us-west-2.amazonaws.com/municipalcodeonline.com-new/payson/ordinances/documents/1653339554_05-18-2022-D%20Recodified%20Municipal%20Code.pdf, Title 10.04, fetched 2026-07-03). This is consistent with Utah's Title 15A State Construction and Fire Codes Act model, under which every incorporated Utah city is automatically a compliance agency enforcing the state-adopted code suite; Payson's own ordinance text references 'the State Construction Code' and 'technical construction codes' generically rather than citing specific edition years.; International Fire Code (IFC), 2009 edition, is explicitly named with its year in Payson's own code: PCC 9.04.010 'Adoption Of International Fire Code' states the adopted code is 'marked and designated as the International Fire Code, including Appendix Chapters B, C, D, II, I & J (see International Fire Code 101.2.1, 2009 edition)' — per the same recodified Municipal Code document, Title 9.04, fetched 2026-07-03. NOTE: this 2009 IFC citation is the only explicit code-edition year found anywhere in Payson's own currently-published municipal code text; it substantially predates the 2021 IBC/IRC/2023 NEC statewide baseline described in Utah Code Title 15A and may reflect a stale, un-updated ordinance section rather than the code editions actually enforced today. Reported as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.; International Residential Code (IRC) — referenced generically ('in accordance with the requirements of the International Residential Code, as adopted') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.; International Building Code (IBC) — referenced generically ('the International Building Code as adopted by the State of Utah') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.; International Plumbing Code (IPC) — referenced generically ('The International Plumbing Code as adopted and amended by the State of Utah') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.; National Electrical Code (NEC) — referenced generically ('National Electrical Code, and all fittings and materials used in such installations') in PCC Title 10 without a stated edition year, per the same recodified Municipal Code document, fetched 2026-07-03.. Local amendments apply — see the Payson overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Payson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.