Residential Building Permit (New Single Family / Additions) — Payson, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://www.paysonutah.gov/DocumentCenter/View/453/Residential-Building-Permit-Submittal-Requirements
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Single Family / Additions) in Payson, Utah
Required for new residential construction and additions in Payson, regulated by the state-adopted building code suite referenced generically in PCC Title 10. Fees are valuation-based using ICC building valuation data with a 0.75 regional multiplier.
Verified 2026-07-03 · Source
When you need this permit
- Subdivision plat recorded and all lot/subdivision improvements completed, inspected, and approved prior to application submission
- Building Permit Application with contractor's signature and copy of current license (if not an owner/builder) Owner-builder
- Power to Panel Application with contractor's signature and copy of current license (if not an owner/builder) Owner-builder
- Owner/Builder Certification (required only if the property owner is acting as the contractor) Owner-builder
- Stucco ICBO Report, Stucco Certificate, and Stucco Contractor's license (if stucco is used) Contractor
- $300 Plan Review Deposit
- Compliance with all zoning requirements for the underlying zone and any recorded development agreement/CC&Rs
- Complete plan set drawn to scale
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 10 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour, per standard IRC/IBC inspection sequence enforced by Payson Building Department.
- 2
Framing
After framing, sheathing, and roof installed; includes electrical, plumbing, and mechanical rough-in per the submitted plan set.
- 3
Insulation
After insulation installed, before drywall.
- 4
Final
All work complete before occupancy; scheduled through the iworq online portal per paysonutah.gov/334/Building-Permits-Inspections.
See the full Payson inspection guide — scheduling & re-inspection fees →
Tips
- A $300 Plan Review Deposit is required at submittal, separate from the $481 Residential Plan Review Fee itself — both are listed independently in Payson's fee schedule and submittal requirements.
- The subdivision plat must be recorded and all lot/subdivision improvements completed, inspected, and approved BEFORE a building permit application can even be submitted — call Public Works at 801-465-5217 with subdivision status questions.
- Payson's own published plan-review timeline is a maximum of 14 business days once a complete application is accepted — incomplete submittals are not accepted for review at all.
- All submittals must be done through the online portal at PaysonUtah.gov (iworq); the Building Department does not accept paper-only submittals per the Minimum Submittal Requirements document.
- Payson has no distinct EV charger / EVSE permit type or fee: the Payson City Fee Schedule (paysonutah.gov/DocumentCenter/View/170, PDF fetched and searched directly 2026-07-20) contains zero mentions of 'EV,' 'electric vehicle,' 'charging station,' or 'EVSE.' Consistent with this file's tipsAndGotchas note that Payson publishes no standalone electrical, plumbing, or mechanical trade-permit fee line items, a residential EV charger install is expected to be priced within the general valuation-based Building Permit Fee; confirm directly with the Building Department before applying. Note Payson operates its own municipal electric utility (Payson Power) — verify whether Payson Power sign-off is required for an EV charger circuit in addition to the building permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Payson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Payson
Residential Building Permit (New Single Family / Additions) in other cities
Compare residential building permit (new single family / additions) fees across Utah →
Look up this fee in a different city →