EV Charger / EVSE Permit — Payson, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://www.paysonutah.gov/DocumentCenter/View/1324/Payson-City-Fee-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Payson, Utah
Payson has no distinct EV charger/EVSE permit type or fee line item — installing electric vehicle charging equipment is electrical work billed under the city's single integrated Building Permit Fee (valuation-based, per ICC Building Valuation Data with a regional multiplier of .75, plus a 1% state surcharge), the same schedule used for all building/electrical/plumbing/mechanical work in Payson (there is no separate 'Electrical Permit' type in the city's own permit catalog). A direct text search of Payson City's current Fee Schedule (effective 7/3/2024, DocumentCenter/View/1324) found no 'EV,' 'electric vehicle,' or 'EVSE' line item anywhere in the document — the only electricity-related entries are Payson City Power's own utility connection/service fees, unrelated to building-permit EVSE installation.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Payson
- New dedicated electrical circuit and/or panel capacity to serve the charger, regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g))
- Building Permit Application submitted through Payson City's Development Services Department
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building/Electrical Inspection
Inspection of the new circuit and charger connection, administered by Payson City's Development Services Department (801-465-5200).
See the full Payson inspection guide — scheduling & re-inspection fees →
Tips
- Payson does not have a separate 'Electrical Permit' permit type at all — building, electrical, plumbing, and mechanical work (including EV charger installation) are all billed under the single valuation-based Building Permit Fee.
- The minimum Building Permit Fee is $65.00 for valuation $1-$500 — a low-valuation scope like a single EV charger circuit would likely be billed at or near this minimum, but confirm with Development Services (801-465-5200) before applying.
- Don't confuse the Building Permit Fee with Payson City Power's separate 'Electric Connection Fee (per Service)' utility line items in the same Fee Schedule — those are electric utility service/metering fees, not building-permit EVSE fees.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Payson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Payson
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →