Skip to main content
PermitBase

This is PermitBase’s published record for Pleasant Grove as of 2026-07-04. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Pleasant Grove building permits

Verified

Pleasant Grove, Utah — as published 2026-07-04.

Verified 2026-07-03 · Source

Codes adopted

2021 International Residential Code (IRC) with Utah State Amendments — per pgcityutah.gov/departments/community_development/building.php, fetched 2026-07-04.2021 International Building Code (IBC) — per pgcityutah.gov/departments/community_development/building.php, fetched 2026-07-04.2021 International Mechanical Code (IMC) — per pgcityutah.gov/departments/community_development/building.php, fetched 2026-07-04.2021 International Plumbing Code (IPC) — per pgcityutah.gov/departments/community_development/building.php, fetched 2026-07-04.2020 National Electrical Code (NEC) — per pgcityutah.gov/departments/community_development/building.php, fetched 2026-07-04. NOTE: Utah Code § 15A-2-103(1)(g) mandates the 2023 NEC statewide (effective per state adoption schedule); Pleasant Grove's own currently-published Building Division page still lists the 2020 NEC. This is the same kind of stale-document discrepancy documented for American Fork (americanfork.gov Solar checklist) and Provo (Building FAQ) — reported here as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.2021 International Energy Conservation Code (IECC) with Utah State Amendments — per pgcityutah.gov/departments/community_development/building.php, fetched 2026-07-04.2021 International Fuel Gas Code (IFGC) — per pgcityutah.gov/departments/community_development/building.php, fetched 2026-07-04.2021 International Existing Building Code (IEBC) — per pgcityutah.gov/departments/community_development/building.php, fetched 2026-07-04.2021 International Swimming Pool and Spa Code (ISPSC) — per pgcityutah.gov/departments/community_development/building.php, fetched 2026-07-04.

Permit types & fees

Residential Building Permit (New Single Family)

Verified

Required for new single-family residential construction in Pleasant Grove, regulated by the state-adopted 2021 IRC (with Utah State Amendments). A submittal fee is charged at application and applied toward the total building permit cost.

Verified 2026-07-03 · Source

Requirements

  • New single-family residential construction
  • Electronic copy of plans and engineering
  • Site plan to scale
  • Structural engineering plan review
  • Gas line layout with pipe sizes called out
  • Heat loss analysis
  • SWPPP (Storm Water Pollution Prevention Plan)
  • Contractor license number or Owner-Builder Certification Form

Required documents

  • RequiredElectronic Copy of Plans and EngineeringRequired for new residential and commercial construction per pgcityutah.gov Building Division page.
  • RequiredSite Plan (to scale)Required for new residential and commercial construction.
  • RequiredStructural Engineering Plan ReviewRequired for new residential and commercial construction.
  • RequiredGas Line Layout with Pipe SizesRequired for new residential and commercial construction.
  • RequiredHeat Loss AnalysisRequired for new residential and commercial construction.
  • RequiredSWPPP (Storm Water Pollution Prevention Plan)Required for new residential and commercial construction.
  • RequiredContractor License Number or Owner-Builder Certification FormOwner-Builder Certification Form available via Utah DOPL (dopl.utah.gov/contracting/additional-forms/).

Fee schedule

Fee typeAmountNotes
Submittal Fee (Plan Check Fee) — New Single Family Residential$250.00pgcityutah.gov/departments/community_development/fee_schedule.php and building.php (fetched 2026-07-04): 'New Single Family — $250.' Applied toward the total cost of the building permit; collected after the permit technician reviews the application.

New Commercial Shell Building Permit

Verified

Required for new commercial shell construction in Pleasant Grove, regulated by the state-adopted 2021 IBC (with related Utah amendments referenced on the city's Building Division page).

Verified 2026-07-03 · Source

Requirements

  • New commercial shell construction
  • Electronic copy of plans and engineering
  • Site plan to scale
  • Structural engineering plan review
  • Gas line layout with pipe sizes called out
  • Heat loss analysis
  • SWPPP (Storm Water Pollution Prevention Plan)
  • Contractor license number or Owner-Builder Certification Form

Required documents

  • RequiredElectronic Copy of Plans and EngineeringRequired for new residential and commercial construction per pgcityutah.gov Building Division page.
  • RequiredSite Plan (to scale)Required for new commercial construction.
  • RequiredStructural Engineering Plan ReviewRequired for new commercial construction.
  • RequiredSWPPP (Storm Water Pollution Prevention Plan)Required for new commercial construction.

Fee schedule

Fee typeAmountNotes
Submittal Fee (Plan Check Fee) — New Commercial Shell$500.00pgcityutah.gov/departments/community_development/fee_schedule.php and building.php (fetched 2026-07-04): 'New Commercial — $500.' Applied toward the total cost of the building permit.

Commercial Remodel / Tenant Improvement Permit

Verified

Required for commercial remodel and tenant improvement work in Pleasant Grove.

Verified 2026-07-03 · Source

Requirements

  • Commercial remodel or tenant improvement scope
  • Electronic copy of plans and engineering, if applicable
  • Wall section
  • All rebar size, spacing and length
  • Site plan
  • Any other details pertaining to specific job

Required documents

  • OptionalElectronic Copy of Plans and Engineering (if applicable)Per pgcityutah.gov Building Division 'Most Other Types of Construction' document list.
  • RequiredWall SectionPer pgcityutah.gov Building Division document list.
  • RequiredRebar Size, Spacing and LengthPer pgcityutah.gov Building Division document list.
  • RequiredSite PlanPer pgcityutah.gov Building Division document list.

Fee schedule

Fee typeAmountNotes
Submittal Fee (Plan Check Fee) — Commercial Remodel/Tenant Improvement$250.00pgcityutah.gov/departments/community_development/fee_schedule.php and building.php (fetched 2026-07-04): 'Commercial Remodel/Tenant Improvement — $250.' Applied toward the total cost of the building permit.

Solar / Basement Finish / Addition / Pool / Plan Revision Permit

Verified

Covers solar PV installations, basement finishes, residential additions, pools, and plan revisions in Pleasant Grove — grouped under a single flat submittal fee category per the city's own published fee table.

Verified 2026-07-03 · Source

Requirements

  • Solar PV installation, basement finish, residential addition, pool installation, or a plan revision to an already-submitted project
  • Wall section (for structural scopes)
  • All rebar size, spacing and length (where applicable)
  • Site plan
  • Contractor license number or Owner-Builder Certification Form

Required documents

  • RequiredSite PlanPer pgcityutah.gov Building Division document list for 'Most Other Types of Construction.'
  • OptionalWall SectionRequired where structural scope applies (e.g., pools, additions).
  • RequiredContractor License Number or Owner-Builder Certification FormOwner-Builder Certification Form available via Utah DOPL (dopl.utah.gov/contracting/additional-forms/).

Fee schedule

Fee typeAmountNotes
Submittal Fee (Plan Check Fee) — Solar, Basements, Additions, Pools, Plan Revisions$75.00pgcityutah.gov/departments/community_development/fee_schedule.php and building.php (fetched 2026-07-04): 'All Others (Solar, Signs, Basements) — $75' / 'Solar, Basements, Additions, Pools, Plan Revisions — $75.' Applied toward the total cost of the building permit.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant Grove building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-07) →View current record →All versions →

Permalink: /utah/utah-county/pleasant-grove/as-of/2026-07-04/

Snapshot date: 2026-07-04

Commit: 0e91f51

Reproducible from PermitBase’s version-controlled dataset, commit 0e91f51.